24.1.10.109 |
Pemasangan Kusen Aluminium Jendela Tipe 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0558 |
OH |
236.200,00 |
13.179,96 |
123.1.1.1.1.6 |
Mandor |
0.0093 |
OH |
206.800,00 |
1.923,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.232 |
OH |
150.800,00 |
336.585,62 |
123.1.1.1.1.23 |
Tukang |
1.116 |
OH |
177.500,00 |
198.090,01 |
|
|
|
|
Jumlah |
549.778,83 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.22 |
Kusen Aluminium Jendela Tipe 1 |
1 |
unit |
2.614.000,00 |
2.614.000,00 |
|
|
|
|
Jumlah |
2.614.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.163.778,83 |
| 2020 | 24.1.10.109 | Pemasangan Kusen Aluminium Jendela Tipe 1 | unit | 3.163.778,83 | Tidak Dipakai | |
1442 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.110 |
Pemasangan Kusen Aluminium Jendela Tipe 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0414 |
OH |
236.200,00 |
9.778,68 |
123.1.1.1.1.6 |
Mandor |
0.0069 |
OH |
206.800,00 |
1.426,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.656 |
OH |
150.800,00 |
249.724,80 |
123.1.1.1.1.23 |
Tukang |
0.828 |
OH |
177.500,00 |
146.970,00 |
|
|
|
|
Jumlah |
407.900,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.333 |
Kusen Aluminium Jendela Tipe 2 |
1 |
unit |
1.946.900,00 |
1.946.900,00 |
|
|
|
|
Jumlah |
1.946.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.354.800,40 |
| 2020 | 24.1.10.110 | Pemasangan Kusen Aluminium Jendela Tipe 2 | unit | 2.354.800,40 | Tidak Dipakai | |
1443 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.111 |
Pemasangan Kusen Aluminium Jendela Tipe 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0288 |
OH |
236.200,00 |
6.802,56 |
123.1.1.1.1.6 |
Mandor |
0.0048 |
OH |
206.800,00 |
992,64 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.152 |
OH |
150.800,00 |
173.721,59 |
123.1.1.1.1.23 |
Tukang |
0.576 |
OH |
177.500,00 |
102.240,00 |
|
|
|
|
Jumlah |
283.756,79 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.334 |
Kusen Aluminium Jendela Tipe 3 |
1 |
unit |
1.362.300,00 |
1.362.300,00 |
|
|
|
|
Jumlah |
1.362.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.646.056,79 |
| 2020 | 24.1.10.111 | Pemasangan Kusen Aluminium Jendela Tipe 3 | unit | 1.646.056,79 | Tidak Dipakai | |
1444 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.112 |
Pemasangan Kusen Aluminium Jendela Tipe 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0162 |
OH |
236.200,00 |
3.826,44 |
123.1.1.1.1.6 |
Mandor |
0.0027 |
OH |
206.800,00 |
558,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.648 |
OH |
150.800,00 |
97.718,40 |
123.1.1.1.1.23 |
Tukang |
0.324 |
OH |
177.500,00 |
57.510,00 |
|
|
|
|
Jumlah |
159.613,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.335 |
Kusen Aluminium Jendela Tipe 4 |
1 |
unit |
751.100,00 |
751.100,00 |
|
|
|
|
Jumlah |
751.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
910.713,20 |
| 2020 | 24.1.10.112 | Pemasangan Kusen Aluminium Jendela Tipe 4 | unit | 910.713,20 | Tidak Dipakai | |
1445 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.113 |
Pemasangan Kusen Aluminium Jendela Tipe 5 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.336 |
Kusen Aluminium Jendela Tipe 5 |
1 |
unit |
1.048.200,00 |
1.048.200,00 |
|
|
|
|
Jumlah |
1.048.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.266.929,20 |
| 2020 | 24.1.10.113 | Pemasangan Kusen Aluminium Jendela Tipe 5 | unit | 1.266.929,20 | Tidak Dipakai | |
1446 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.114 |
Pemasangan Kusen Aluminium Jendela Tipe 6 |
|
unit |
|
|
|
Upah: |
|
|
|
|
117.1.1.1.22.337 |
Kusen Aluminium Jendela Tipe 6 |
1 |
unit |
835.000,00 |
835.000,00 |
123.1.1.1.1.5 |
Kepala Tukang |
0.018 |
OH |
236.200,00 |
4.251,60 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.72 |
OH |
150.800,00 |
108.576,00 |
123.1.1.1.1.23 |
Tukang |
0.36 |
OH |
177.500,00 |
63.900,00 |
|
|
|
|
Jumlah |
1.012.348,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.012.348,01 |
| 2020 | 24.1.10.114 | Pemasangan Kusen Aluminium Jendela Tipe 6 | unit | 1.012.348,01 | Tidak Dipakai | |
1447 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.115 |
Pemasangan Kusen Aluminium Jendela Tipe 7 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0132 |
OH |
236.200,00 |
3.117,84 |
123.1.1.1.1.6 |
Mandor |
0.0022 |
OH |
206.800,00 |
454,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.528 |
OH |
150.800,00 |
79.622,40 |
123.1.1.1.1.23 |
Tukang |
0.264 |
OH |
177.500,00 |
46.860,00 |
|
|
|
|
Jumlah |
130.055,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.338 |
Kusen Aluminium Jendela Tipe 7 |
1 |
unit |
629.700,00 |
629.700,00 |
|
|
|
|
Jumlah |
629.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
759.755,20 |
| 2020 | 24.1.10.115 | Pemasangan Kusen Aluminium Jendela Tipe 7 | unit | 759.755,20 | Tidak Dipakai | |
1448 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.116 |
Pemasangan Kusen Aluminium Jendela Tipe 8 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.009 |
OH |
236.200,00 |
2.125,80 |
123.1.1.1.1.6 |
Mandor |
0.0015 |
OH |
206.800,00 |
310,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.36 |
OH |
150.800,00 |
54.288,00 |
123.1.1.1.1.23 |
Tukang |
0.18 |
OH |
177.500,00 |
31.950,00 |
|
|
|
|
Jumlah |
88.674,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.339 |
Kusen Aluminium Jendela Tipe 8 |
1 |
unit |
418.400,00 |
418.400,00 |
|
|
|
|
Jumlah |
418.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
507.074,00 |
| 2020 | 24.1.10.116 | Pemasangan Kusen Aluminium Jendela Tipe 8 | unit | 507.074,00 | Tidak Dipakai | |
1449 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.117 |
Pemasangan Kusen Aluminium Pintu Tipe 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0312 |
OH |
236.200,00 |
7.369,44 |
123.1.1.1.1.6 |
Mandor |
0.0052 |
OH |
206.800,00 |
1.075,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.248 |
OH |
150.800,00 |
188.198,40 |
123.1.1.1.1.23 |
Tukang |
0.624 |
OH |
177.500,00 |
110.760,00 |
|
|
|
|
Jumlah |
307.403,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.340 |
Kusen Aluminium Pintu Tipe 1 |
1 |
unit |
1.464.800,00 |
1.464.800,00 |
|
|
|
|
Jumlah |
1.464.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.772.203,21 |
| 2020 | 24.1.10.117 | Pemasangan Kusen Aluminium Pintu Tipe 1 | unit | 1.772.203,21 | Tidak Dipakai | |
1450 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.118 |
Pemasangan Kusen Aluminium Pintu Tipe 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.021 |
OH |
236.200,00 |
4.960,20 |
123.1.1.1.1.6 |
Mandor |
0.0035 |
OH |
206.800,00 |
723,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.84 |
OH |
150.800,00 |
126.672,00 |
123.1.1.1.1.23 |
Tukang |
0.42 |
OH |
177.500,00 |
74.550,00 |
|
|
|
|
Jumlah |
206.905,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.341 |
Kusen Aluminium Pintu Tipe 2 |
1 |
unit |
982.800,00 |
982.800,00 |
|
|
|
|
Jumlah |
982.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.189.705,99 |
| 2020 | 24.1.10.118 | Pemasangan Kusen Aluminium Pintu Tipe 2 | unit | 1.189.705,99 | Tidak Dipakai | |
1451 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.119 |
Pemasangan Kusen Aluminium Pintu Tipe 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0198 |
OH |
236.200,00 |
4.676,76 |
123.1.1.1.1.6 |
Mandor |
0.0033 |
OH |
206.800,00 |
682,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.792 |
OH |
150.800,00 |
119.433,60 |
123.1.1.1.1.23 |
Tukang |
0.396 |
OH |
177.500,00 |
70.290,00 |
|
|
|
|
Jumlah |
195.082,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.342 |
Kusen Aluminium Pintu Tipe 3 |
1 |
unit |
945.500,00 |
945.500,00 |
|
|
|
|
Jumlah |
945.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.140.582,80 |
| 2020 | 24.1.10.119 | Pemasangan Kusen Aluminium Pintu Tipe 3 | unit | 1.140.582,80 | Tidak Dipakai | |
1452 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.120 |
Pemasangan Kusen Aluminium Pintu Tipe 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.018 |
OH |
236.200,00 |
4.251,60 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.72 |
OH |
150.800,00 |
108.576,00 |
123.1.1.1.1.23 |
Tukang |
0.36 |
OH |
177.500,00 |
63.900,00 |
|
|
|
|
Jumlah |
177.348,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.343 |
Kusen Aluminium Pintu Tipe 4 |
1 |
unit |
835.000,00 |
835.000,00 |
|
|
|
|
Jumlah |
835.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.012.348,01 |
| 2020 | 24.1.10.120 | Pemasangan Kusen Aluminium Pintu Tipe 4 | unit | 1.012.348,01 | Tidak Dipakai | |
1453 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.121 |
Pemasangan Kusen Aluminium Pintu&Jendela |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0624 |
OH |
236.200,00 |
14.738,88 |
123.1.1.1.1.6 |
Mandor |
0.0104 |
OH |
206.800,00 |
2.150,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.496 |
OH |
150.800,00 |
376.396,81 |
123.1.1.1.1.23 |
Tukang |
1.248 |
OH |
177.500,00 |
221.520,00 |
|
|
|
|
Jumlah |
614.806,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.344 |
Kusen Aluminium Pintu & Jendela |
1 |
unit |
2.929.800,00 |
2.929.800,00 |
|
|
|
|
Jumlah |
2.929.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.544.606,41 |
| 2020 | 24.1.10.121 | Pemasangan Kusen Aluminium Pintu&Jendela | unit | 3.544.606,41 | Tidak Dipakai | |
1454 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.1 |
Pemasangan Titik Stop Kontak Gedung |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.48 |
OH |
150.800,00 |
72.384,00 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
133.292,00 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.13 |
Pipa Pralon 5/8 |
2 |
batang |
10.500,00 |
21.000,00 |
132.3.1.10.1.101 |
Isolator |
1 |
unit |
10.500,00 |
10.500,00 |
|
|
|
|
Jumlah |
31.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
164.792,00 |
| 2020 | 24.1.11.1 | Pemasangan Titik Stop Kontak Gedung | titik | 164.792,00 | Tidak Dipakai | |
1455 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.2 |
Pemasangan Titik Lampu Gedung |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.48 |
OH |
150.800,00 |
72.384,00 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
133.292,00 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.13 |
Pipa Pralon 5/8 |
3 |
batang |
10.500,00 |
31.500,00 |
|
|
|
|
Jumlah |
31.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
164.792,00 |
| 2020 | 24.1.11.2 | Pemasangan Titik Lampu Gedung | titik | 164.792,00 | Tidak Dipakai | |
1456 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.3 |
Pemasangan Saklar Tunggal |
|
titik |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2020 | 24.1.11.3 | Pemasangan Saklar Tunggal | titik | 0,00 | Tidak Dipakai | |
1457 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.11.4 |
Pemasangan Saklar Ganda |
|
titik |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2020 | 24.1.11.4 | Pemasangan Saklar Ganda | titik | 0,00 | Tidak Dipakai | |
1458 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.1 |
Pemasangan Dasar Saluran R.10 Segmen |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0238 |
OH |
206.800,00 |
4.921,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.475 |
OH |
150.800,00 |
71.630,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
76.551,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.458 |
Got Talang R.10 (segmen) |
1 |
buah |
36.300,00 |
36.300,00 |
|
|
|
|
Jumlah |
36.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
112.851,84 |
| 2020 | 24.1.12.1 | Pemasangan Dasar Saluran R.10 Segmen | meter | 112.851,84 | Tidak Dipakai | |
1459 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.2 |
Pemasangan Dasar Saluran R.15 Segmen |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.019 |
OH |
206.800,00 |
3.929,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.38 |
OH |
150.800,00 |
57.304,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
61.233,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.459 |
Got Talang R.15 (segmen) |
1 |
buah |
37.700,00 |
37.700,00 |
|
|
|
|
Jumlah |
37.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
98.933,20 |
| 2020 | 24.1.12.2 | Pemasangan Dasar Saluran R.15 Segmen | meter | 98.933,20 | Tidak Dipakai | |
1460 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.12.3 |
Pemasangan Dasar Saluran R.25 Segmen |
|
meter |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.0152 |
OH |
206.800,00 |
3.143,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.304 |
OH |
150.800,00 |
45.843,20 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
48.986,56 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.457 |
Got Talang R.25 (segmen) |
1 |
buah |
47.400,00 |
47.400,00 |
|
|
|
|
Jumlah |
47.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
96.386,56 |
| 2020 | 24.1.12.3 | Pemasangan Dasar Saluran R.25 Segmen | meter | 96.386,56 | Tidak Dipakai | |