1381 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.49 |
Pemasangan Kusen Metal Type J 2 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.054 |
OH |
236.200,00 |
12.754,80 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.16 |
OH |
150.800,00 |
325.728,01 |
123.1.1.1.1.23 |
Tukang |
1.08 |
OH |
177.500,00 |
191.700,01 |
|
|
|
|
Jumlah |
532.044,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.383 |
Kusen Metal Tipe J 2 K |
1 |
unit |
2.281.200,00 |
2.281.200,00 |
|
|
|
|
Jumlah |
2.281.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.813.244,02 |
| 2020 | 24.1.10.49 | Pemasangan Kusen Metal Type J 2 K | unit | 2.813.244,02 | Tidak Dipakai | |
1382 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.50 |
Pemasangan Kusen Metal Type J 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.4 |
OH |
150.800,00 |
361.920,01 |
123.1.1.1.1.23 |
Tukang |
1.2 |
OH |
177.500,00 |
213.000,01 |
|
|
|
|
Jumlah |
591.160,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.387 |
Kusen Metal Type J 3 |
1 |
unit |
2.134.400,00 |
2.134.400,00 |
|
|
|
|
Jumlah |
2.134.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.725.560,02 |
| 2020 | 24.1.10.50 | Pemasangan Kusen Metal Type J 3 | unit | 2.725.560,02 | Tidak Dipakai | |
1383 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.51 |
Pemasangan Kusen Metal Type J 3 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.042 |
OH |
236.200,00 |
9.920,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.68 |
OH |
150.800,00 |
253.343,99 |
123.1.1.1.1.23 |
Tukang |
0.84 |
OH |
177.500,00 |
149.100,00 |
|
|
|
|
Jumlah |
413.811,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.388 |
Kusen Metal Type J 3 K |
1 |
unit |
1.734.200,00 |
1.734.200,00 |
|
|
|
|
Jumlah |
1.734.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.148.011,99 |
| 2020 | 24.1.10.51 | Pemasangan Kusen Metal Type J 3 K | unit | 2.148.011,99 | Tidak Dipakai | |
1384 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.52 |
Pemasangan Kusen Metal Type J 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
295.580,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.389 |
Kusen Metal Type J 4 |
1 |
unit |
1.334.000,00 |
1.334.000,00 |
|
|
|
|
Jumlah |
1.334.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.629.580,01 |
| 2020 | 24.1.10.52 | Pemasangan Kusen Metal Type J 4 | unit | 1.629.580,01 | Tidak Dipakai | |
1385 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.53 |
Pemasangan Kusen Metal Type J 4 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.390 |
Kusen Metal Type J 4 K |
1 |
unit |
933.800,00 |
933.800,00 |
|
|
|
|
Jumlah |
933.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.152.529,20 |
| 2020 | 24.1.10.53 | Pemasangan Kusen Metal Type J 4 K | unit | 1.152.529,20 | Tidak Dipakai | |
1386 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.54 |
Pemasangan Kusen Metal Type P 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0492 |
OH |
236.200,00 |
11.621,04 |
123.1.1.1.1.6 |
Mandor |
0.0082 |
OH |
206.800,00 |
1.695,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.968 |
OH |
150.800,00 |
296.774,41 |
123.1.1.1.1.23 |
Tukang |
0.984 |
OH |
177.500,00 |
174.660,00 |
|
|
|
|
Jumlah |
484.751,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.391 |
Kusen Metal Type P 1 |
1 |
unit |
2.267.800,00 |
2.267.800,00 |
|
|
|
|
Jumlah |
2.267.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.752.551,21 |
| 2020 | 24.1.10.54 | Pemasangan Kusen Metal Type P 1 | unit | 2.752.551,21 | Tidak Dipakai | |
1387 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.55 |
Pemasangan Kusen Metal Type P 1 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.039 |
OH |
236.200,00 |
9.211,80 |
123.1.1.1.1.6 |
Mandor |
0.0065 |
OH |
206.800,00 |
1.344,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.56 |
OH |
150.800,00 |
235.247,99 |
123.1.1.1.1.23 |
Tukang |
0.78 |
OH |
177.500,00 |
138.449,99 |
|
|
|
|
Jumlah |
384.253,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.392 |
Kusen Metal Type P 1 K |
1 |
unit |
2.001.000,00 |
2.001.000,00 |
|
|
|
|
Jumlah |
2.001.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.385.253,99 |
| 2020 | 24.1.10.55 | Pemasangan Kusen Metal Type P 1 K | unit | 2.385.253,99 | Tidak Dipakai | |
1388 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.56 |
Pemasangan Kusen Metal Type P 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0342 |
OH |
236.200,00 |
8.078,04 |
123.1.1.1.1.6 |
Mandor |
0.0057 |
OH |
206.800,00 |
1.178,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.368 |
OH |
150.800,00 |
206.294,40 |
123.1.1.1.1.23 |
Tukang |
0.684 |
OH |
177.500,00 |
121.410,00 |
|
|
|
|
Jumlah |
336.961,21 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.393 |
Kusen Metal Type P 2 |
1 |
unit |
1.419.400,00 |
1.419.400,00 |
|
|
|
|
Jumlah |
1.419.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.756.361,21 |
| 2020 | 24.1.10.56 | Pemasangan Kusen Metal Type P 2 | unit | 1.756.361,21 | Tidak Dipakai | |
1389 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.57 |
Pemasangan Kusen Metal Type P 2 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0264 |
OH |
236.200,00 |
6.235,68 |
123.1.1.1.1.6 |
Mandor |
0.0044 |
OH |
206.800,00 |
909,92 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.056 |
OH |
150.800,00 |
159.244,80 |
123.1.1.1.1.23 |
Tukang |
0.528 |
OH |
177.500,00 |
93.720,00 |
|
|
|
|
Jumlah |
260.110,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.394 |
Kusen Metal Type P 2 K |
1 |
unit |
1.108.600,00 |
1.108.600,00 |
|
|
|
|
Jumlah |
1.108.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.368.710,40 |
| 2020 | 24.1.10.57 | Pemasangan Kusen Metal Type P 2 K | unit | 1.368.710,40 | Tidak Dipakai | |
1390 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.58 |
Pemasangan Kusen Metal Type P 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.0055 |
OH |
206.800,00 |
1.137,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.32 |
OH |
150.800,00 |
199.056,01 |
123.1.1.1.1.23 |
Tukang |
0.66 |
OH |
177.500,00 |
117.150,00 |
|
|
|
|
Jumlah |
325.138,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.395 |
Kusen Metal P 3 |
1 |
unit |
1.327.400,00 |
1.327.400,00 |
|
|
|
|
Jumlah |
1.327.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.652.538,01 |
| 2020 | 24.1.10.58 | Pemasangan Kusen Metal Type P 3 | unit | 1.652.538,01 | Tidak Dipakai | |
1391 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.59 |
Pemasangan Kusen Metal Type P 3 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0258 |
OH |
236.200,00 |
6.093,96 |
123.1.1.1.1.6 |
Mandor |
0.0043 |
OH |
206.800,00 |
889,24 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.032 |
OH |
150.800,00 |
155.625,59 |
123.1.1.1.1.23 |
Tukang |
0.516 |
OH |
177.500,00 |
91.590,00 |
|
|
|
|
Jumlah |
254.198,79 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.396 |
Kusen Metal Type P 3 K |
1 |
unit |
1.036.600,00 |
1.036.600,00 |
|
|
|
|
Jumlah |
1.036.600,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.290.798,79 |
| 2020 | 24.1.10.59 | Pemasangan Kusen Metal Type P 3 K | unit | 1.290.798,79 | Tidak Dipakai | |
1392 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.60 |
Pemasangan Kusen Metal Type P 4 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0222 |
OH |
236.200,00 |
5.243,64 |
123.1.1.1.1.6 |
Mandor |
0.0037 |
OH |
206.800,00 |
765,16 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.888 |
OH |
150.800,00 |
133.910,40 |
123.1.1.1.1.23 |
Tukang |
0.444 |
OH |
177.500,00 |
78.810,00 |
|
|
|
|
Jumlah |
218.729,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.397 |
Kusen Metal Type P 4 |
1 |
unit |
936.500,00 |
936.500,00 |
|
|
|
|
Jumlah |
936.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.155.229,20 |
| 2020 | 24.1.10.60 | Pemasangan Kusen Metal Type P 4 | unit | 1.155.229,20 | Tidak Dipakai | |
1393 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.61 |
Pemasangan Kusen Metal Type Pj 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.09 |
OH |
236.200,00 |
21.258,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.6 |
OH |
150.800,00 |
542.879,99 |
123.1.1.1.1.23 |
Tukang |
1.8 |
OH |
177.500,00 |
319.499,99 |
|
|
|
|
Jumlah |
886.739,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.398 |
Kusen Metal type PJ 1 |
1 |
unit |
4.002.000,00 |
4.002.000,00 |
|
|
|
|
Jumlah |
4.002.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.888.739,98 |
| 2020 | 24.1.10.61 | Pemasangan Kusen Metal Type Pj 1 | unit | 4.888.739,98 | Tidak Dipakai | |
1394 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.62 |
Pemasangan Kusen Metal Type Pj 1 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0792 |
OH |
236.200,00 |
18.707,04 |
123.1.1.1.1.6 |
Mandor |
0.0132 |
OH |
206.800,00 |
2.729,76 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.168 |
OH |
150.800,00 |
477.734,40 |
123.1.1.1.1.23 |
Tukang |
1.584 |
OH |
177.500,00 |
281.160,00 |
|
|
|
|
Jumlah |
780.331,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.399 |
Kusen Metal type PJ 1 K |
1 |
unit |
3.335.000,00 |
3.335.000,00 |
|
|
|
|
Jumlah |
3.335.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.115.331,20 |
| 2020 | 24.1.10.62 | Pemasangan Kusen Metal Type Pj 1 K | unit | 4.115.331,20 | Tidak Dipakai | |
1395 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.63 |
Pemasangan Kusen Metal Type V 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.063 |
OH |
236.200,00 |
14.880,60 |
123.1.1.1.1.6 |
Mandor |
0.0105 |
OH |
206.800,00 |
2.171,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.52 |
OH |
150.800,00 |
380.016,00 |
123.1.1.1.1.23 |
Tukang |
1.26 |
OH |
177.500,00 |
223.650,00 |
|
|
|
|
Jumlah |
620.718,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.400 |
Kusen Metal type V 1 |
1 |
unit |
2.401.200,00 |
2.401.200,00 |
|
|
|
|
Jumlah |
2.401.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.021.918,00 |
| 2020 | 24.1.10.63 | Pemasangan Kusen Metal Type V 1 | unit | 3.021.918,00 | Tidak Dipakai | |
1396 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.64 |
Pemasangan Kusen Metal Type V 1 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.0055 |
OH |
206.800,00 |
1.137,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.32 |
OH |
150.800,00 |
199.056,01 |
123.1.1.1.1.23 |
Tukang |
0.66 |
OH |
177.500,00 |
117.150,00 |
|
|
|
|
Jumlah |
325.138,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.401 |
Kusen Metal type V 1 K |
1 |
unit |
1.347.400,00 |
1.347.400,00 |
|
|
|
|
Jumlah |
1.347.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.672.538,01 |
| 2020 | 24.1.10.64 | Pemasangan Kusen Metal Type V 1 K | unit | 1.672.538,01 | Tidak Dipakai | |
1397 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.65 |
Pemasangan Kusen Metal Type V 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0474 |
OH |
236.200,00 |
11.195,88 |
123.1.1.1.1.6 |
Mandor |
0.0079 |
OH |
206.800,00 |
1.633,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.896 |
OH |
150.800,00 |
285.916,80 |
123.1.1.1.1.23 |
Tukang |
0.948 |
OH |
177.500,00 |
168.270,00 |
|
|
|
|
Jumlah |
467.016,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.402 |
Kusen Metal V 2 |
1 |
unit |
1.906.300,00 |
1.906.300,00 |
|
|
|
|
Jumlah |
1.906.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.373.316,41 |
| 2020 | 24.1.10.65 | Pemasangan Kusen Metal Type V 2 | unit | 2.373.316,41 | Tidak Dipakai | |
1398 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.66 |
Pemasangan Kusen Metal Type V 2 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0252 |
OH |
236.200,00 |
5.952,24 |
123.1.1.1.1.6 |
Mandor |
0.0042 |
OH |
206.800,00 |
868,56 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.008 |
OH |
150.800,00 |
152.006,40 |
123.1.1.1.1.23 |
Tukang |
0.504 |
OH |
177.500,00 |
89.460,00 |
|
|
|
|
Jumlah |
248.287,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.403 |
Kusen Metal Type V 2 K |
1 |
unit |
1.017.900,00 |
1.017.900,00 |
|
|
|
|
Jumlah |
1.017.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.266.187,20 |
| 2020 | 24.1.10.66 | Pemasangan Kusen Metal Type V 2 K | unit | 1.266.187,20 | Tidak Dipakai | |
1399 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.67 |
Pemasangan Kusen Metal Type V 3 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0324 |
OH |
236.200,00 |
7.652,88 |
123.1.1.1.1.6 |
Mandor |
0.0054 |
OH |
206.800,00 |
1.116,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.296 |
OH |
150.800,00 |
195.436,80 |
123.1.1.1.1.23 |
Tukang |
0.648 |
OH |
177.500,00 |
115.020,00 |
|
|
|
|
Jumlah |
319.226,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.404 |
Kusen Metal type V 3 |
1 |
unit |
1.228.700,00 |
1.228.700,00 |
|
|
|
|
Jumlah |
1.228.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.547.926,40 |
| 2020 | 24.1.10.67 | Pemasangan Kusen Metal Type V 3 | unit | 1.547.926,40 | Tidak Dipakai | |
1400 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.68 |
Pemasangan Kusen Metal Type V 3 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0174 |
OH |
236.200,00 |
4.109,88 |
123.1.1.1.1.6 |
Mandor |
0.0029 |
OH |
206.800,00 |
599,72 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.696 |
OH |
150.800,00 |
104.956,80 |
123.1.1.1.1.23 |
Tukang |
0.348 |
OH |
177.500,00 |
61.770,00 |
|
|
|
|
Jumlah |
171.436,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.405 |
Kusen Metal type V 3 K |
1 |
unit |
920.500,00 |
920.500,00 |
|
|
|
|
Jumlah |
920.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.091.936,40 |
| 2020 | 24.1.10.68 | Pemasangan Kusen Metal Type V 3 K | unit | 1.091.936,40 | Tidak Dipakai | |