1361 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.29 |
Pemasangan Hak Angin (Sikutan) |
|
stel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.14 |
OH |
177.500,00 |
24.850,00 |
|
|
|
|
Jumlah |
36.914,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.192 |
Hak Angin Biasa |
1 |
pasang |
27.800,00 |
27.800,00 |
|
|
|
|
Jumlah |
27.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
64.714,00 |
| 2020 | 24.1.10.29 | Pemasangan Hak Angin (Sikutan) | stel | 64.714,00 | Tidak Dipakai | |
1362 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.30 |
Pemasangan Hak Angin Lurus |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
30.348,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.193 |
Hak Angin Lurus Biasa |
1 |
pasang |
39.800,00 |
39.800,00 |
|
|
|
|
Jumlah |
39.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
70.148,00 |
| 2020 | 24.1.10.30 | Pemasangan Hak Angin Lurus | buah | 70.148,00 | Tidak Dipakai | |
1363 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.31 |
Pemasangan Fitrase |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.04 |
OH |
206.800,00 |
8.272,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.13 |
OH |
150.800,00 |
19.604,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
72.251,00 |
|
Bahan/Material: |
|
|
|
|
132.3.2.13.1.102 |
Fitrase |
1 |
M2 |
83.800,00 |
83.800,00 |
|
|
|
|
Jumlah |
83.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
156.051,00 |
| 2020 | 24.1.10.31 | Pemasangan Fitrase | M2 | 156.051,00 | Tidak Dipakai | |
1364 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.32 |
Pemasangan Vertical Blind |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
126.894,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.332 |
Vertical Blinds |
1 |
M2 |
233.500,00 |
233.500,00 |
|
|
|
|
Jumlah |
233.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
360.394,40 |
| 2020 | 24.1.10.32 | Pemasangan Vertical Blind | M2 | 360.394,40 | Tidak Dipakai | |
1365 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.33 |
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.045 |
OH |
236.200,00 |
10.629,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.45 |
OH |
177.500,00 |
79.875,00 |
|
|
|
|
Jumlah |
128.634,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.249 |
Paku Skrup / buah |
28 |
buah |
900,00 |
25.200,00 |
132.5.2.6.1.539 |
Gypsum Board 9 mm |
1 |
lembar |
96.500,00 |
96.500,00 |
|
|
|
|
Jumlah |
121.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
250.334,00 |
| 2020 | 24.1.10.33 | Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud | M2 | 250.334,00 | Tidak Dipakai | |
1366 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.34 |
Pemasangan Karpet Wool |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.017 |
OH |
236.200,00 |
4.015,40 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.17 |
OH |
150.800,00 |
25.636,00 |
123.1.1.1.1.23 |
Tukang |
0.17 |
OH |
177.500,00 |
30.175,00 |
|
|
|
|
Jumlah |
61.687,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.63 |
Karpet Wold Cels |
2.1 |
M2 |
1.026.600,00 |
2.155.859,90 |
|
|
|
|
Jumlah |
2.155.859,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.217.547,50 |
| 2020 | 24.1.10.34 | Pemasangan Karpet Wool | M2 | 2.217.547,50 | Tidak Dipakai | |
1367 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.35 |
Pemasangan Kawat Nyamuk (Kassa Plastik) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
19.811,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.212 |
Kawat Nyamuk Kasa Plastik, Lebar |
1.1 |
meter |
15.400,00 |
16.940,00 |
117.1.1.1.22.241 |
Paku Biasa 2-5 inchi |
0.02 |
Doz |
37.700,00 |
754,00 |
|
|
|
|
Jumlah |
17.694,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
37.505,00 |
| 2020 | 24.1.10.35 | Pemasangan Kawat Nyamuk (Kassa Plastik) | M2 | 37.505,00 | Tidak Dipakai | |
1368 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.36 |
Pemasangan Kawat Nyamuk (Kassa Aluminium) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.16.12 |
Plat Besi/Baja 244 x 122, tebal 1,8 mm |
1.716 |
Lonjor |
628.500,00 |
1.078.505,98 |
117.1.1.1.22.213 |
Kawat Nayamuk Kasa Aluminium |
1.1 |
meter |
33.500,00 |
36.850,00 |
|
|
|
|
Jumlah |
1.115.355,98 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.22.223 |
Pabrikasi/Elektroda Baja(20%) |
1 |
M2 |
46.900,00 |
46.900,00 |
|
|
|
|
Jumlah |
46.900,00 |
|
|
|
|
Nilai HSPK |
1.198.481,98 |
| 2020 | 24.1.10.36 | Pemasangan Kawat Nyamuk (Kassa Aluminium) | M2 | 1.198.481,98 | Tidak Dipakai | |
1369 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.37 |
Pemasangan Kawat Harmonika |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0018 |
M3 |
14.567.300,00 |
26.221,14 |
117.1.1.1.22.197 |
Kawat Harmonika |
1.1 |
M2 |
84.100,00 |
92.510,00 |
117.1.1.1.22.259 |
Paku Usuk |
0.02 |
Kg |
26.500,00 |
530,00 |
|
|
|
|
Jumlah |
119.261,14 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
155.487,14 |
| 2020 | 24.1.10.37 | Pemasangan Kawat Harmonika | M2 | 155.487,14 | Tidak Dipakai | |
1370 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.38 |
Pembongkaran Kayu |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.4 |
OH |
236.200,00 |
94.480,00 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.67 |
OH |
150.800,00 |
402.636,01 |
123.1.1.1.1.23 |
Tukang |
4 |
OH |
177.500,00 |
710.000,00 |
|
|
|
|
Jumlah |
1.248.476,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.248.476,01 |
| 2020 | 24.1.10.38 | Pembongkaran Kayu | M3 | 1.248.476,01 | Tidak Dipakai | |
1371 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.39 |
Lantai Papan / Balok kayu Kamper per m2 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0333 |
OH |
236.200,00 |
7.865,46 |
123.1.1.1.1.6 |
Mandor |
0.0067 |
OH |
206.800,00 |
1.385,56 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1333 |
OH |
150.800,00 |
20.101,64 |
123.1.1.1.1.23 |
Tukang |
0.3333 |
OH |
177.500,00 |
59.160,75 |
|
|
|
|
Jumlah |
88.513,41 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0471 |
M3 |
14.567.300,00 |
686.119,83 |
117.1.1.1.22.244 |
Paku Klem (No.4)/Beton |
0.75 |
Doz |
26.500,00 |
19.875,00 |
|
|
|
|
Jumlah |
705.994,83 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
794.508,24 |
| 2020 | 24.1.10.39 | Lantai Papan / Balok kayu Kamper per m2 | M2 | 794.508,24 | Tidak Dipakai | |
1372 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.40 |
Pemasangan Daun Pintu PVC |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.03 |
OH |
236.200,00 |
7.086,00 |
123.1.1.1.1.6 |
Mandor |
0.03 |
OH |
206.800,00 |
6.204,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.23 |
Tukang |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
210.270,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.156 |
Daun Pintu UPCV uk. 80 x 120 cm atau 90 x 210 cm Lengkap Terpang |
1 |
unit |
4.669.000,00 |
4.669.000,00 |
|
|
|
|
Jumlah |
4.669.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.879.270,01 |
| 2020 | 24.1.10.40 | Pemasangan Daun Pintu PVC | buah | 4.879.270,01 | Tidak Dipakai | |
1373 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.41 |
Pemasangan Kusen Alumunium Profil 4" Putih |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0043 |
OH |
236.200,00 |
1.015,66 |
123.1.1.1.1.6 |
Mandor |
0.0021 |
OH |
206.800,00 |
434,28 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.043 |
OH |
150.800,00 |
6.484,40 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
15.566,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.13 |
Joint Sealent |
0.06 |
Kg |
36.500,00 |
2.190,00 |
117.1.1.1.22.116 |
Aluminium putih |
1.1 |
M |
104.800,00 |
115.280,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
2 |
buah |
133.400,00 |
266.800,00 |
|
|
|
|
Jumlah |
384.270,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
399.836,84 |
| 2020 | 24.1.10.41 | Pemasangan Kusen Alumunium Profil 4" Putih | M1 | 399.836,84 | Tidak Dipakai | |
1374 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.42 |
Pemasangan Kusen Alumunium Profil 3" Coklat |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0043 |
OH |
236.200,00 |
1.015,66 |
123.1.1.1.1.6 |
Mandor |
0.0021 |
OH |
206.800,00 |
434,28 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.043 |
OH |
150.800,00 |
6.484,40 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
15.566,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.13 |
Joint Sealent |
0.06 |
Kg |
36.500,00 |
2.190,00 |
117.1.1.1.22.115 |
Aluminium Coklat |
1.1 |
M |
78.500,00 |
86.350,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
2 |
buah |
133.400,00 |
266.800,00 |
|
|
|
|
Jumlah |
355.340,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
370.906,84 |
| 2020 | 24.1.10.42 | Pemasangan Kusen Alumunium Profil 3" Coklat | M1 | 370.906,84 | Tidak Dipakai | |
1375 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.43 |
Pemasangan Slimar Alumunium Profil 3/8 " |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0043 |
OH |
236.200,00 |
1.015,66 |
123.1.1.1.1.6 |
Mandor |
0.0022 |
OH |
206.800,00 |
454,96 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.043 |
OH |
150.800,00 |
6.484,40 |
123.1.1.1.1.23 |
Tukang |
0.043 |
OH |
177.500,00 |
7.632,50 |
|
|
|
|
Jumlah |
15.587,52 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.1.13 |
Joint Sealent |
2 |
Kg |
36.500,00 |
73.000,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
0.06 |
buah |
133.400,00 |
8.004,00 |
117.1.1.1.22.305 |
Slimar Aluminium 3/8 |
1.1 |
M |
125.700,00 |
138.270,00 |
|
|
|
|
Jumlah |
219.274,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
234.861,52 |
| 2020 | 24.1.10.43 | Pemasangan Slimar Alumunium Profil 3/8 " | M1 | 234.861,52 | Tidak Dipakai | |
1376 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.44 |
Pemasangan Kaca Gravier |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0075 |
OH |
206.800,00 |
1.551,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
33.981,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.3.10 |
Kaca Gravier |
1.1 |
M2 |
2.933.100,00 |
3.226.410,07 |
|
|
|
|
Jumlah |
3.226.410,07 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.260.391,07 |
| 2020 | 24.1.10.44 | Pemasangan Kaca Gravier | M2 | 3.260.391,07 | Tidak Dipakai | |
1377 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.45 |
Pemasangan Kaca Stainglass |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
37.873,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.3.18 |
Kaca Stainglass |
1.1 |
M2 |
3.491.800,00 |
3.840.980,08 |
|
|
|
|
Jumlah |
3.840.980,08 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.878.853,52 |
| 2020 | 24.1.10.45 | Pemasangan Kaca Stainglass | M2 | 3.878.853,52 | Tidak Dipakai | |
1378 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.46 |
Pemasangan Kusen Metal Type J 1 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.102 |
OH |
236.200,00 |
24.092,40 |
123.1.1.1.1.6 |
Mandor |
0.017 |
OH |
206.800,00 |
3.515,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4.08 |
OH |
150.800,00 |
615.263,99 |
123.1.1.1.1.23 |
Tukang |
2.04 |
OH |
177.500,00 |
362.099,99 |
|
|
|
|
Jumlah |
1.004.971,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.384 |
Kusen Metal Type J 1 |
1 |
unit |
5.336.000,00 |
5.336.000,00 |
|
|
|
|
Jumlah |
5.336.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.340.971,98 |
| 2020 | 24.1.10.46 | Pemasangan Kusen Metal Type J 1 | unit | 6.340.971,98 | Tidak Dipakai | |
1379 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.47 |
Pemasangan Kusen Metal Type J 1 K |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.078 |
OH |
236.200,00 |
18.423,60 |
123.1.1.1.1.6 |
Mandor |
0.013 |
OH |
206.800,00 |
2.688,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.12 |
OH |
150.800,00 |
470.495,98 |
123.1.1.1.1.23 |
Tukang |
1.56 |
OH |
177.500,00 |
276.899,99 |
|
|
|
|
Jumlah |
768.507,97 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.385 |
Kusen Metal Type J 1 K |
1 |
unit |
4.402.200,00 |
4.402.200,00 |
|
|
|
|
Jumlah |
4.402.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.170.707,97 |
| 2020 | 24.1.10.47 | Pemasangan Kusen Metal Type J 1 K | unit | 5.170.707,97 | Tidak Dipakai | |
1380 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.48 |
Pemasangan Kusen Metal Type J 2 |
|
unit |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.084 |
OH |
236.200,00 |
19.840,80 |
123.1.1.1.1.6 |
Mandor |
0.014 |
OH |
206.800,00 |
2.895,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
3.36 |
OH |
150.800,00 |
506.687,98 |
123.1.1.1.1.23 |
Tukang |
1.68 |
OH |
177.500,00 |
298.199,99 |
|
|
|
|
Jumlah |
827.623,97 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.383 |
Kusen Metal Tipe J 2 K |
1 |
unit |
2.281.200,00 |
2.281.200,00 |
|
|
|
|
Jumlah |
2.281.200,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.108.823,97 |
| 2020 | 24.1.10.48 | Pemasangan Kusen Metal Type J 2 | unit | 3.108.823,97 | Tidak Dipakai | |