1341 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.9 |
Daun Pintu Panil Kayu Kelas I |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.3 |
OH |
236.200,00 |
70.860,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
3 |
OH |
177.500,00 |
532.500,00 |
|
|
|
|
Jumlah |
764.500,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.04 |
M3 |
21.864.300,00 |
874.571,98 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
876.306,98 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.640.806,98 |
| 2020 | 24.1.10.9 | Daun Pintu Panil Kayu Kelas I | M2 | 1.640.806,98 | Tidak Dipakai | |
1342 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.10 |
Daun Pintu Panil Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.3 |
OH |
236.200,00 |
70.860,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
3 |
OH |
177.500,00 |
532.500,00 |
|
|
|
|
Jumlah |
764.500,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.04 |
M3 |
14.567.300,00 |
582.691,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
584.426,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.348.926,99 |
| 2020 | 24.1.10.10 | Daun Pintu Panil Kayu Kelas II | M2 | 1.348.926,99 | Tidak Dipakai | |
1343 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.11 |
Daun Pintu/Bingkai Daun Jendela Kaca, Kayu Kelas I |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.24 |
OH |
236.200,00 |
56.688,00 |
123.1.1.1.1.6 |
Mandor |
0.04 |
OH |
206.800,00 |
8.272,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
2.4 |
OH |
177.500,00 |
426.000,02 |
|
|
|
|
Jumlah |
611.600,02 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.024 |
M3 |
21.864.300,00 |
524.743,20 |
132.3.2.9.1.5 |
Lem Kayu |
0.3 |
buah |
356.200,00 |
106.860,00 |
|
|
|
|
Jumlah |
631.603,21 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.243.203,23 |
| 2020 | 24.1.10.11 | Daun Pintu/Bingkai Daun Jendela Kaca, Kayu Kelas I | M2 | 1.243.203,23 | Tidak Dipakai | |
1344 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.12 |
Daun Pintu/Bingkai Daun Jendela Kaca, Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.2 |
OH |
236.200,00 |
47.240,00 |
123.1.1.1.1.6 |
Mandor |
0.04 |
OH |
206.800,00 |
8.272,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.8 |
OH |
150.800,00 |
120.640,00 |
123.1.1.1.1.23 |
Tukang |
2 |
OH |
177.500,00 |
355.000,00 |
|
|
|
|
Jumlah |
531.152,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.024 |
M3 |
14.567.300,00 |
349.615,20 |
132.3.2.9.1.5 |
Lem Kayu |
0.3 |
buah |
356.200,00 |
106.860,00 |
|
|
|
|
Jumlah |
456.475,21 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
987.627,21 |
| 2020 | 24.1.10.12 | Daun Pintu/Bingkai Daun Jendela Kaca, Kayu Kelas II | M2 | 987.627,21 | Tidak Dipakai | |
1345 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.13 |
Pasangan Kaca Nako tebal 5 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
32.595,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.3.11 |
Kaca Jendela Nako + Rangka |
1.2 |
lembar |
46.700,00 |
56.040,00 |
117.1.1.1.22.249 |
Paku Skrup / buah |
10 |
buah |
900,00 |
9.000,00 |
|
|
|
|
Jumlah |
65.040,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
97.635,44 |
| 2020 | 24.1.10.13 | Pasangan Kaca Nako tebal 5 mm | M2 | 97.635,44 | Tidak Dipakai | |
1346 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.14 |
Pemasangan Kaca Mati tebal 5 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
32.595,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.3.4 |
Kaca Bening 5 mm |
1.1 |
lembar |
266.800,00 |
293.480,01 |
|
|
|
|
Jumlah |
293.480,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
326.075,45 |
| 2020 | 24.1.10.14 | Pemasangan Kaca Mati tebal 5 mm | M2 | 326.075,45 | Tidak Dipakai | |
1347 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.15 |
Pemasangan Kaca Mati Rayban tebal 5 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
32.595,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.3.16 |
Kaca Ryben 5 mm |
1.1 |
lembar |
320.200,00 |
352.220,01 |
|
|
|
|
Jumlah |
352.220,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
384.815,45 |
| 2020 | 24.1.10.15 | Pemasangan Kaca Mati Rayban tebal 5 mm | M2 | 384.815,45 | Tidak Dipakai | |
1348 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.16 |
Dinding Sketsel (Double Teakwood) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.045 |
OH |
236.200,00 |
10.629,00 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.45 |
OH |
177.500,00 |
79.875,00 |
|
|
|
|
Jumlah |
114.778,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.028 |
M3 |
14.567.300,00 |
407.884,41 |
117.1.1.1.22.100 |
Taek wood |
0.86 |
lembar |
358.400,00 |
308.224,01 |
117.1.1.1.22.244 |
Paku Klem (No.4)/Beton |
0.15 |
Doz |
26.500,00 |
3.975,00 |
132.3.2.9.1.5 |
Lem Kayu |
0.56 |
buah |
356.200,00 |
199.472,00 |
|
|
|
|
Jumlah |
919.555,42 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.034.333,82 |
| 2020 | 24.1.10.16 | Dinding Sketsel (Double Teakwood) | M2 | 1.034.333,82 | Tidak Dipakai | |
1349 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.17 |
Dinding Teakwood (1 lapis) Tanpa Rangka |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0075 |
OH |
236.200,00 |
1.771,50 |
123.1.1.1.1.6 |
Mandor |
0.0013 |
OH |
206.800,00 |
268,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.025 |
OH |
150.800,00 |
3.770,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
19.122,84 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.100 |
Taek wood |
0.4 |
lembar |
358.400,00 |
143.360,00 |
117.1.1.1.22.244 |
Paku Klem (No.4)/Beton |
0.05 |
Doz |
26.500,00 |
1.325,00 |
|
|
|
|
Jumlah |
144.685,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
163.807,84 |
| 2020 | 24.1.10.17 | Dinding Teakwood (1 lapis) Tanpa Rangka | M2 | 163.807,84 | Tidak Dipakai | |
1350 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.18 |
Pemasangan Partisi Double Gypsum 12 mm Rangka Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.045 |
OH |
236.200,00 |
10.629,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.45 |
OH |
177.500,00 |
79.875,00 |
|
|
|
|
Jumlah |
128.634,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0195 |
M3 |
14.567.300,00 |
284.062,36 |
117.1.1.1.22.249 |
Paku Skrup / buah |
28 |
buah |
900,00 |
25.200,00 |
132.5.2.6.1.539 |
Gypsum Board 9 mm |
1 |
lembar |
96.500,00 |
96.500,00 |
|
|
|
|
Jumlah |
405.762,36 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
534.396,36 |
| 2020 | 24.1.10.18 | Pemasangan Partisi Double Gypsum 12 mm Rangka Kayu Kelas II | M2 | 534.396,36 | Tidak Dipakai | |
1351 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.19 |
Pemasangan Kunci Tanam Kecil |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.01 |
OH |
150.800,00 |
1.508,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
93.654,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.204 |
Kunci Tanam Kecil Union (sejenis) |
1 |
buah |
66.700,00 |
66.700,00 |
|
|
|
|
Jumlah |
66.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
160.354,00 |
| 2020 | 24.1.10.19 | Pemasangan Kunci Tanam Kecil | buah | 160.354,00 | Tidak Dipakai | |
1352 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.20 |
Pemasangan Kunci Tanam Besar 2x Putar kuningan |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.01 |
OH |
150.800,00 |
1.508,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
93.654,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.202 |
Kunci tanam besar union (sejenis) |
1 |
buah |
93.400,00 |
93.400,00 |
|
|
|
|
Jumlah |
93.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
187.054,00 |
| 2020 | 24.1.10.20 | Pemasangan Kunci Tanam Besar 2x Putar kuningan | buah | 187.054,00 | Tidak Dipakai | |
1353 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.21 |
Pemasangan Engsel H (stel) |
|
stel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
32.595,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.177 |
Engsel Pintu cabut uk 5" |
1 |
set |
13.400,00 |
13.400,00 |
|
|
|
|
Jumlah |
13.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
45.995,44 |
| 2020 | 24.1.10.21 | Pemasangan Engsel H (stel) | stel | 45.995,44 | Tidak Dipakai | |
1354 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.22 |
Pemasangan Engsel Kuningan Untuk Jendela |
|
stel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.0005 |
OH |
206.800,00 |
103,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.01 |
OH |
150.800,00 |
1.508,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
21.723,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.173 |
Engsel Jendela Nilon uk 3" |
1 |
set |
20.100,00 |
20.100,00 |
|
|
|
|
Jumlah |
20.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
41.823,40 |
| 2020 | 24.1.10.22 | Pemasangan Engsel Kuningan Untuk Jendela | stel | 41.823,40 | Tidak Dipakai | |
1355 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.23 |
Pemasangan Engsel Kuningan Untuk Pintu |
|
stel |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.0008 |
OH |
206.800,00 |
165,44 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.015 |
OH |
150.800,00 |
2.262,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
32.595,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.180 |
Engsel Pintu nilon uk 4" |
1 |
set |
92.100,00 |
92.100,00 |
|
|
|
|
Jumlah |
92.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
124.695,44 |
| 2020 | 24.1.10.23 | Pemasangan Engsel Kuningan Untuk Pintu | stel | 124.695,44 | Tidak Dipakai | |
1356 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.24 |
Pemasangan Grendel Kecil |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
30.348,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.187 |
Gerendel jendala |
1 |
buah |
60.100,00 |
60.100,00 |
|
|
|
|
Jumlah |
60.100,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
90.448,00 |
| 2020 | 24.1.10.24 | Pemasangan Grendel Kecil | buah | 90.448,00 | Tidak Dipakai | |
1357 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.25 |
Pemasangan Grendel Panjang |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
30.348,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.188 |
Grendel Panjang |
1 |
buah |
112.900,00 |
112.900,00 |
|
|
|
|
Jumlah |
112.900,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
143.248,00 |
| 2020 | 24.1.10.25 | Pemasangan Grendel Panjang | buah | 143.248,00 | Tidak Dipakai | |
1358 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.26 |
Pemasangan Grendel Besar |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
30.348,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.189 |
Gerendel Pintu |
1 |
buah |
18.700,00 |
18.700,00 |
|
|
|
|
Jumlah |
18.700,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
49.048,00 |
| 2020 | 24.1.10.26 | Pemasangan Grendel Besar | buah | 49.048,00 | Tidak Dipakai | |
1359 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.27 |
Pemasangan Grendel Tanam |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.14 |
OH |
177.500,00 |
24.850,00 |
|
|
|
|
Jumlah |
36.914,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.190 |
Gerendel Tanam |
1 |
buah |
117.300,00 |
117.300,00 |
|
|
|
|
Jumlah |
117.300,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
154.214,00 |
| 2020 | 24.1.10.27 | Pemasangan Grendel Tanam | buah | 154.214,00 | Tidak Dipakai | |
1360 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.28 |
Pemasangan Grendel Espanyolet |
|
buah |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.14 |
OH |
177.500,00 |
24.850,00 |
|
|
|
|
Jumlah |
36.914,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.186 |
Grendel Espanyolet |
1 |
buah |
124.800,00 |
124.800,00 |
|
|
|
|
Jumlah |
124.800,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
161.714,00 |