1321 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.53 |
Pemasangan Plafon Akustik |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.012 |
OH |
236.200,00 |
2.834,40 |
123.1.1.1.1.6 |
Mandor |
0.006 |
OH |
206.800,00 |
1.240,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.12 |
OH |
150.800,00 |
18.096,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
43.471,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.231 |
Paku 1,5-1 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
2.082,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
45.553,20 |
| 2020 | 24.1.9.53 | Pemasangan Plafon Akustik | M2 | 45.553,20 | Tidak Dipakai | |
1322 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.54 |
Pemasangan Plafon Triplek ukuran (120x240) cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.106 |
Triplek 4 mm |
0.3472 |
lembar |
86.800,00 |
30.136,96 |
117.1.1.1.22.231 |
Paku 1,5-1 inchi |
0.03 |
Kg |
34.700,00 |
1.041,00 |
|
|
|
|
Jumlah |
31.177,96 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
67.403,96 |
| 2020 | 24.1.9.54 | Pemasangan Plafon Triplek ukuran (120x240) cm | M2 | 67.403,96 | Tidak Dipakai | |
1323 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.55 |
Pemasangan Plafon Gypsum Board (120x240) 9 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.005 |
OH |
236.200,00 |
1.181,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
26.170,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.250 |
Paku Sekrup 2" |
0.11 |
kotak |
24.100,00 |
2.651,00 |
132.5.2.6.1.539 |
Gypsum Board 9 mm |
0.3472 |
lembar |
96.500,00 |
33.504,80 |
|
|
|
|
Jumlah |
36.155,80 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
62.325,80 |
| 2020 | 24.1.9.55 | Pemasangan Plafon Gypsum Board (120x240) 9 mm | M2 | 62.325,80 | Tidak Dipakai | |
1324 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.56 |
Pemasangan Plafon Calsium Board (120x240) 4 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.005 |
OH |
236.200,00 |
1.181,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
26.170,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.152 |
Calsiboard |
0.3472 |
lembar |
84.100,00 |
29.199,52 |
117.1.1.1.22.250 |
Paku Sekrup 2" |
0.11 |
kotak |
24.100,00 |
2.651,00 |
|
|
|
|
Jumlah |
31.850,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
58.020,52 |
| 2020 | 24.1.9.56 | Pemasangan Plafon Calsium Board (120x240) 4 mm | M2 | 58.020,52 | Tidak Dipakai | |
1325 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.57 |
Pemasangan List plafond Gypsum Profil 4 " |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.005 |
OH |
236.200,00 |
1.181,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
18.216,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.80 |
Tepung Gypsum |
0.004 |
Kg |
22.100,00 |
88,40 |
|
|
|
|
Jumlah |
88,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
18.304,80 |
| 2020 | 24.1.9.57 | Pemasangan List plafond Gypsum Profil 4 " | M1 | 18.304,80 | Tidak Dipakai | |
1326 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.58 |
Pemasangan langit-langit akustik ukuran (60x120)cm berikut rangka Kayu |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.05 |
OH |
236.200,00 |
11.810,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
181.130,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.012 |
M3 |
6.403.200,00 |
76.838,40 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
78.938,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
260.068,40 |
| 2020 | 24.1.9.58 | Pemasangan langit-langit akustik ukuran (60x120)cm berikut rangka Kayu | M2 | 260.068,40 | Tidak Dipakai | |
1327 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.59 |
Pemasangan List langit-langit kayu profil |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.005 |
OH |
236.200,00 |
1.181,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.05 |
OH |
177.500,00 |
8.875,00 |
|
|
|
|
Jumlah |
18.216,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.231 |
Paku 1,5-1 inchi |
0.01 |
Kg |
34.700,00 |
347,00 |
|
|
|
|
Jumlah |
347,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
18.563,40 |
| 2020 | 24.1.9.59 | Pemasangan List langit-langit kayu profil | M1 | 18.563,40 | Tidak Dipakai | |
1328 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.60 |
Rangka Plafon Luar (Overstek) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.004 |
OH |
236.200,00 |
944,80 |
123.1.1.1.1.6 |
Mandor |
0.0135 |
OH |
206.800,00 |
2.791,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.27 |
OH |
150.800,00 |
40.716,00 |
123.1.1.1.1.23 |
Tukang |
0.4 |
OH |
177.500,00 |
71.000,00 |
|
|
|
|
Jumlah |
115.452,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.023 |
M3 |
6.403.200,00 |
147.273,60 |
117.1.1.1.22.246 |
Paku Reng |
0.06 |
Kg |
21.000,00 |
1.260,00 |
|
|
|
|
Jumlah |
148.533,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
263.986,20 |
| 2020 | 24.1.9.60 | Rangka Plafon Luar (Overstek) | M2 | 263.986,20 | Tidak Dipakai | |
1329 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.61 |
Pemasangan Listplank Asbes Datar Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0462 |
OH |
236.200,00 |
10.912,44 |
123.1.1.1.1.6 |
Mandor |
0.0078 |
OH |
206.800,00 |
1.613,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.156 |
OH |
150.800,00 |
23.524,80 |
123.1.1.1.1.23 |
Tukang |
0.462 |
OH |
177.500,00 |
82.005,00 |
|
|
|
|
Jumlah |
118.055,28 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.33 |
Asbes Datar/ Eternit |
1 |
lembar |
40.100,00 |
40.100,00 |
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.022 |
M3 |
14.567.300,00 |
320.480,60 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
362.680,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
480.735,88 |
| 2020 | 24.1.9.61 | Pemasangan Listplank Asbes Datar Kayu Kelas II | M2 | 480.735,88 | Tidak Dipakai | |
1330 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.62 |
Pemasangan Listplank Asbes Datar Kayu Kelas III |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0462 |
OH |
236.200,00 |
10.912,44 |
123.1.1.1.1.6 |
Mandor |
0.0078 |
OH |
206.800,00 |
1.613,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.156 |
OH |
150.800,00 |
23.524,80 |
123.1.1.1.1.23 |
Tukang |
0.462 |
OH |
177.500,00 |
82.005,00 |
|
|
|
|
Jumlah |
118.055,28 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.33 |
Asbes Datar/ Eternit |
1 |
lembar |
40.100,00 |
40.100,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.022 |
M3 |
6.403.200,00 |
140.870,40 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
183.070,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
301.125,68 |
| 2020 | 24.1.9.62 | Pemasangan Listplank Asbes Datar Kayu Kelas III | M2 | 301.125,68 | Tidak Dipakai | |
1331 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.63 |
Pemasangan Plafon Kalsiboard Rangka Aluminium |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
88.410,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.47 |
Papan Semen 1200 x 2400 x 45 mm |
0.3819 |
lembar |
180.100,00 |
68.780,19 |
117.1.1.1.22.115 |
Aluminium Coklat |
2.75 |
M |
78.500,00 |
215.875,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
4 |
buah |
133.400,00 |
533.600,00 |
|
|
|
|
Jumlah |
818.255,19 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
906.665,19 |
| 2020 | 24.1.9.63 | Pemasangan Plafon Kalsiboard Rangka Aluminium | M2 | 906.665,19 | Tidak Dipakai | |
1332 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.64 |
Pemasangan Plafond Kalsiboard Rangka Plafon Metal Furing |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.25 |
OH |
150.800,00 |
37.700,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.46 |
Papan Semen 1200 x 2400 x 35 mm |
0.3819 |
lembar |
160.100,00 |
61.142,19 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
4 |
buah |
133.400,00 |
533.600,00 |
117.1.1.1.22.499 |
Besi Hollow |
2 |
batang |
94.100,00 |
188.200,00 |
117.1.1.1.22.500 |
Besi Hollow |
0.75 |
batang |
124.100,00 |
93.075,00 |
|
|
|
|
Jumlah |
876.017,19 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
961.757,19 |
| 2020 | 24.1.9.64 | Pemasangan Plafond Kalsiboard Rangka Plafon Metal Furing | M2 | 961.757,19 | Tidak Dipakai | |
1333 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.1 |
Pembuatan dan Pemasangan Kusen Pintu / Jendela Kayu Kelas I |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
2.1 |
OH |
236.200,00 |
496.019,98 |
123.1.1.1.1.6 |
Mandor |
0.35 |
OH |
206.800,00 |
72.380,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
7 |
OH |
150.800,00 |
1.055.600,00 |
123.1.1.1.1.23 |
Tukang |
21 |
OH |
177.500,00 |
3.727.500,00 |
|
|
|
|
Jumlah |
5.351.499,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
1.1 |
M3 |
21.864.300,00 |
24.050.730,52 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
1.25 |
Kg |
34.700,00 |
43.375,00 |
|
|
|
|
Jumlah |
24.094.105,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
29.445.605,50 |
| 2020 | 24.1.10.1 | Pembuatan dan Pemasangan Kusen Pintu / Jendela Kayu Kelas I | M3 | 29.445.605,50 | Tidak Dipakai | |
1334 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.2 |
Pembuatan dan Pemasangan Kusen Pintu / Jendela Kayu Kelas II |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.8 |
OH |
236.200,00 |
425.159,99 |
123.1.1.1.1.6 |
Mandor |
0.3 |
OH |
206.800,00 |
62.040,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6 |
OH |
150.800,00 |
904.800,00 |
123.1.1.1.1.23 |
Tukang |
18 |
OH |
177.500,00 |
3.195.000,00 |
|
|
|
|
Jumlah |
4.586.999,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
1.2 |
M3 |
14.567.300,00 |
17.480.760,69 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
1.25 |
Kg |
34.700,00 |
43.375,00 |
|
|
|
|
Jumlah |
17.524.135,69 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
22.111.135,69 |
| 2020 | 24.1.10.2 | Pembuatan dan Pemasangan Kusen Pintu / Jendela Kayu Kelas II | M3 | 22.111.135,69 | Tidak Dipakai | |
1335 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.3 |
Pembuatan dan Pemasangan pintu klamp standar. Kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.105 |
OH |
236.200,00 |
24.801,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
267.678,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.04 |
M3 |
14.567.300,00 |
582.691,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
584.426,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
852.105,38 |
| 2020 | 24.1.10.3 | Pembuatan dan Pemasangan pintu klamp standar. Kayu kelas II | M2 | 852.105,38 | Tidak Dipakai | |
1336 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.4 |
Pembuatan dan Pemasangan pintu klamp sederhana Kayu kelas III |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.05 |
OH |
236.200,00 |
248.009,99 |
123.1.1.1.1.6 |
Mandor |
0.35 |
OH |
206.800,00 |
72.380,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.018 |
OH |
150.800,00 |
2.714,40 |
123.1.1.1.1.23 |
Tukang |
0.105 |
OH |
177.500,00 |
18.637,50 |
|
|
|
|
Jumlah |
341.741,89 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.04 |
M3 |
6.403.200,00 |
256.127,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
257.862,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
599.604,88 |
| 2020 | 24.1.10.4 | Pembuatan dan Pemasangan pintu klamp sederhana Kayu kelas III | M2 | 599.604,88 | Tidak Dipakai | |
1337 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.5 |
Pembuatan daun pintu plywood rangkap. Rangka kayu Kelas II tertutup (lebar 90 cm) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.21 |
OH |
236.200,00 |
49.602,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
2.1 |
OH |
177.500,00 |
372.749,98 |
|
|
|
|
Jumlah |
535.149,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.025 |
M3 |
14.567.300,00 |
364.182,51 |
117.1.1.1.22.93 |
Polywood # 4 ukuran 120 x 240 cm |
1 |
lembar |
80.100,00 |
80.100,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.03 |
Kg |
34.700,00 |
1.041,00 |
|
|
|
|
Jumlah |
445.323,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
980.473,49 |
| 2020 | 24.1.10.5 | Pembuatan daun pintu plywood rangkap. Rangka kayu Kelas II tertutup (lebar 90 cm) | M2 | 980.473,49 | Tidak Dipakai | |
1338 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.6 |
Pembuatan daun pintu plywood rangkap. Rangka kayu tertutup (lebar 90 cm) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.105 |
OH |
236.200,00 |
24.801,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
267.678,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.04 |
M3 |
14.567.300,00 |
582.691,99 |
117.1.1.1.22.259 |
Paku Usuk |
0.05 |
Kg |
26.500,00 |
1.325,00 |
|
|
|
|
Jumlah |
584.016,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
851.695,38 |
| 2020 | 24.1.10.6 | Pembuatan daun pintu plywood rangkap. Rangka kayu tertutup (lebar 90 cm) | M2 | 851.695,38 | Tidak Dipakai | |
1339 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.7 |
Daun Pintu Klam Kayu Kelas I |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.105 |
OH |
236.200,00 |
24.801,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
267.678,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.04 |
M3 |
21.864.300,00 |
874.571,98 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
876.306,98 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.143.985,37 |
| 2020 | 24.1.10.7 | Daun Pintu Klam Kayu Kelas I | M2 | 1.143.985,37 | Tidak Dipakai | |
1340 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.10.8 |
Daun Pintu Klam Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.105 |
OH |
236.200,00 |
24.801,00 |
123.1.1.1.1.6 |
Mandor |
0.018 |
OH |
206.800,00 |
3.722,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
1.05 |
OH |
177.500,00 |
186.374,99 |
|
|
|
|
Jumlah |
267.678,39 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.04 |
M3 |
14.567.300,00 |
582.691,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.05 |
Kg |
34.700,00 |
1.735,00 |
|
|
|
|
Jumlah |
584.426,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
852.105,38 |
| 2020 | 24.1.10.8 | Daun Pintu Klam Kayu Kelas II | M2 | 852.105,38 | Tidak Dipakai | |