24.1.9.33 |
Pemasangan Listplank Kayu Kelas IV |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
56.338,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.88 |
Papan/Kaso Kayu Kelas IV |
0.011 |
M3 |
3.348.400,00 |
36.832,40 |
117.1.1.1.22.246 |
Paku Reng |
0.05 |
Kg |
21.000,00 |
1.050,00 |
|
|
|
|
Jumlah |
37.882,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
94.220,40 |
| 2020 | 24.1.9.33 | Pemasangan Listplank Kayu Kelas IV | M1 | 94.220,40 | Tidak Dipakai | |
1302 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.34 |
Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 60 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.8 |
OH |
177.500,00 |
142.000,00 |
|
|
|
|
Jumlah |
241.466,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.18 |
Seng Talang BJLS 30 Lbr 60 |
1 |
M1 |
133.400,00 |
133.400,00 |
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.008 |
M3 |
14.567.300,00 |
116.538,41 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
5 |
buah |
133.400,00 |
667.000,00 |
|
|
|
|
Jumlah |
916.938,41 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.158.404,41 |
| 2020 | 24.1.9.34 | Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 60 cm) | M1 | 1.158.404,41 | Tidak Dipakai | |
1303 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.35 |
Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 90 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.5 |
OH |
177.500,00 |
88.750,00 |
|
|
|
|
Jumlah |
188.216,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.19 |
Seng Talang BJLS 30 Lbr 90 |
1 |
M1 |
133.400,00 |
133.400,00 |
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.016 |
M3 |
14.567.300,00 |
233.076,81 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
5 |
buah |
133.400,00 |
667.000,00 |
|
|
|
|
Jumlah |
1.033.476,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.221.692,81 |
| 2020 | 24.1.9.35 | Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 90 cm) | M1 | 1.221.692,81 | Tidak Dipakai | |
1304 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.36 |
Pemasangan Talang Tritisan dari Seng BJLS 40 (lebar 60 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.8 |
OH |
177.500,00 |
142.000,00 |
|
|
|
|
Jumlah |
241.466,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.20 |
Seng Talang BJLS 40 Lbr 60 |
1 |
M1 |
133.400,00 |
133.400,00 |
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.008 |
M3 |
14.567.300,00 |
116.538,41 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
5 |
buah |
133.400,00 |
667.000,00 |
|
|
|
|
Jumlah |
916.938,41 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.158.404,41 |
| 2020 | 24.1.9.36 | Pemasangan Talang Tritisan dari Seng BJLS 40 (lebar 60 cm) | M1 | 1.158.404,41 | Tidak Dipakai | |
1305 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.37 |
Pemasangan Talang Tritisan dari Seng BJLS 40 (lebar 90 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0.8 |
OH |
177.500,00 |
142.000,00 |
|
|
|
|
Jumlah |
241.466,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.21 |
Seng Talang BJLS 40 Lbr 90 |
1 |
M1 |
133.400,00 |
133.400,00 |
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.016 |
M3 |
14.567.300,00 |
233.076,81 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
5 |
buah |
133.400,00 |
667.000,00 |
|
|
|
|
Jumlah |
1.033.476,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.274.942,81 |
| 2020 | 24.1.9.37 | Pemasangan Talang Tritisan dari Seng BJLS 40 (lebar 90 cm) | M1 | 1.274.942,81 | Tidak Dipakai | |
1306 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.38 |
Pemasangan Talang Cerobong Seng BJLS 40 / 12 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.25 |
OH |
206.800,00 |
51.700,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
124.600,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.1 |
Seng Datar BJLS 40 0,2 60/m |
0.4144 |
lembar |
133.400,00 |
55.280,96 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
22.5 |
buah |
133.400,00 |
3.001.500,00 |
|
|
|
|
Jumlah |
3.056.780,96 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.181.380,96 |
| 2020 | 24.1.9.38 | Pemasangan Talang Cerobong Seng BJLS 40 / 12 cm | M1 | 3.181.380,96 | Tidak Dipakai | |
1307 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.39 |
Pemasangan Talang Polakan Lebar 60 cm Seng BJLS 40 |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
78.070,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.1 |
Seng Datar BJLS 40 0,2 60/m |
1 |
lembar |
133.400,00 |
133.400,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
35 |
buah |
133.400,00 |
4.669.000,00 |
|
|
|
|
Jumlah |
4.802.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.880.470,00 |
| 2020 | 24.1.9.39 | Pemasangan Talang Polakan Lebar 60 cm Seng BJLS 40 | M1 | 4.880.470,00 | Tidak Dipakai | |
1308 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.40 |
Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
36.177,30 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.3 |
Klem PVC 3" |
1 |
buah |
5.400,00 |
5.400,00 |
117.2.2.6.1.34 |
Pipa PVC uk.3 Pj. 4 m |
0.3 |
batang |
154.800,00 |
46.440,00 |
|
|
|
|
Jumlah |
51.840,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
88.017,30 |
| 2020 | 24.1.9.40 | Pemasangan Pipa PVC 3" Type AW utk Talang Pembuluh | M1 | 88.017,30 | Tidak Dipakai | |
1309 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.41 |
Pemasangan Pipa PVC 4" Type AW utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
36.177,30 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.5 |
Klem PVC 4" |
1 |
buah |
8.100,00 |
8.100,00 |
117.2.2.6.1.36 |
Pipa PVC Uk. 4 Pj. 4 m |
0.3 |
batang |
164.100,00 |
49.230,00 |
|
|
|
|
Jumlah |
57.330,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
93.507,30 |
| 2020 | 24.1.9.41 | Pemasangan Pipa PVC 4" Type AW utk Talang Pembuluh | M1 | 93.507,30 | Tidak Dipakai | |
1310 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.42 |
Pemasangan Pipa PVC 5" Type AW utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.081 |
OH |
150.800,00 |
12.214,80 |
123.1.1.1.1.23 |
Tukang |
0.135 |
OH |
177.500,00 |
23.962,50 |
|
|
|
|
Jumlah |
36.177,30 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.7 |
Klem PVC 5" |
1 |
buah |
10.700,00 |
10.700,00 |
117.2.2.6.1.37 |
Pipa PVC Uk. 5 Pj. 4 m |
0.3 |
batang |
176.100,00 |
52.830,00 |
|
|
|
|
Jumlah |
63.530,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
99.707,30 |
| 2020 | 24.1.9.42 | Pemasangan Pipa PVC 5" Type AW utk Talang Pembuluh | M1 | 99.707,30 | Tidak Dipakai | |
1311 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.43 |
Pemasangan Pipa PVC 3" utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0337 |
OH |
150.800,00 |
5.081,96 |
123.1.1.1.1.23 |
Tukang |
0.0675 |
OH |
177.500,00 |
11.981,25 |
|
|
|
|
Jumlah |
17.063,21 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.3 |
Klem PVC 3" |
1 |
buah |
5.400,00 |
5.400,00 |
117.2.2.6.1.18 |
Pipa PVC uk.4 inchi Pj.4 m |
0.25 |
batang |
93.400,00 |
23.350,00 |
|
|
|
|
Jumlah |
28.750,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
45.813,21 |
| 2020 | 24.1.9.43 | Pemasangan Pipa PVC 3" utk Talang Pembuluh | M1 | 45.813,21 | Tidak Dipakai | |
1312 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.44 |
Pemasangan Pipa PVC 4" utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0337 |
OH |
150.800,00 |
5.081,96 |
123.1.1.1.1.23 |
Tukang |
0.0675 |
OH |
177.500,00 |
11.981,25 |
|
|
|
|
Jumlah |
17.063,21 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.5 |
Klem PVC 4" |
1 |
buah |
8.100,00 |
8.100,00 |
117.2.2.6.1.18 |
Pipa PVC uk.4 inchi Pj.4 m |
0.25 |
batang |
93.400,00 |
23.350,00 |
|
|
|
|
Jumlah |
31.450,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
48.513,21 |
| 2020 | 24.1.9.44 | Pemasangan Pipa PVC 4" utk Talang Pembuluh | M1 | 48.513,21 | Tidak Dipakai | |
1313 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.45 |
Pemasangan Pipa PVC 5" utk Talang Pembuluh |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0337 |
OH |
150.800,00 |
5.081,96 |
123.1.1.1.1.23 |
Tukang |
0.0675 |
OH |
177.500,00 |
11.981,25 |
|
|
|
|
Jumlah |
17.063,21 |
|
Bahan/Material: |
|
|
|
|
117.2.2.6.1.7 |
Klem PVC 5" |
1 |
buah |
10.700,00 |
10.700,00 |
117.2.2.6.1.19 |
Pipa PVC uk.5 inchi Pj.6 m |
0.25 |
batang |
386.900,00 |
96.725,00 |
|
|
|
|
Jumlah |
107.425,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
124.488,21 |
| 2020 | 24.1.9.45 | Pemasangan Pipa PVC 5" utk Talang Pembuluh | M1 | 124.488,21 | Tidak Dipakai | |
1314 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.46 |
Pemasangan Atap Asbes Gelombang Besar 150 cm x 108 cm x 0,5 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.34 |
Asbes Gelombang Besar |
0.57 |
lembar |
96.100,00 |
54.777,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
55.749,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
91.854,50 |
| 2020 | 24.1.9.46 | Pemasangan Atap Asbes Gelombang Besar 150 cm x 108 cm x 0,5 cm | M1 | 91.854,50 | Tidak Dipakai | |
1315 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.47 |
Pemasangan Atap Asbes Gelombang Besar 180 cm x 108 cm x 0,5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.35 |
Asbes Gelombang Besar |
0.57 |
lembar |
110.800,00 |
63.156,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
64.128,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
100.233,50 |
| 2020 | 24.1.9.47 | Pemasangan Atap Asbes Gelombang Besar 180 cm x 108 cm x 0,5 cm | M2 | 100.233,50 | Tidak Dipakai | |
1316 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.48 |
Pemasangan Atap Asbes Gelombang Besar 210 cm x 108 cm x 0,5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.36 |
Asbes Gelombang Besar |
0.49 |
lembar |
122.800,00 |
60.172,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
61.144,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
97.249,50 |
| 2020 | 24.1.9.48 | Pemasangan Atap Asbes Gelombang Besar 210 cm x 108 cm x 0,5 cm | M2 | 97.249,50 | Tidak Dipakai | |
1317 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.49 |
Pemasangan Atap Asbes Gelombang Kecil 150 cm x 105 cm x 0,4 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.37 |
Asbes Gelombang Kecil |
0.8 |
lembar |
60.100,00 |
48.080,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
49.052,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
85.157,50 |
| 2020 | 24.1.9.49 | Pemasangan Atap Asbes Gelombang Kecil 150 cm x 105 cm x 0,4 cm | M2 | 85.157,50 | Tidak Dipakai | |
1318 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.50 |
Pemasangan Atap Asbes Gelombang Kecil 180 cm x 105 cm x 0,4 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.39 |
Asbes Gelombang Kecil |
0.8 |
lembar |
66.700,00 |
53.360,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
54.332,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
90.437,50 |
| 2020 | 24.1.9.50 | Pemasangan Atap Asbes Gelombang Kecil 180 cm x 105 cm x 0,4 cm | M2 | 90.437,50 | Tidak Dipakai | |
1319 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.51 |
Pemasangan Atap Asbes Gelombang Kecil 210 cm x 105 cm x 0,4 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.40 |
Asbes Gelombang Kecil |
0.51 |
lembar |
76.100,00 |
38.811,00 |
117.1.1.1.22.258 |
Paku Triplek/ Eternit |
0.12 |
Kg |
8.100,00 |
972,00 |
|
|
|
|
Jumlah |
39.783,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
75.888,50 |
| 2020 | 24.1.9.51 | Pemasangan Atap Asbes Gelombang Kecil 210 cm x 105 cm x 0,4 cm | M2 | 75.888,50 | Tidak Dipakai | |
1320 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.52 |
Pemasangan Plafon Asbes Semen, tebal 4 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.03 |
OH |
150.800,00 |
4.524,00 |
123.1.1.1.1.23 |
Tukang |
0.07 |
OH |
177.500,00 |
12.425,00 |
|
|
|
|
Jumlah |
19.429,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.41 |
Asbes Lokal |
1.1 |
lembar |
24.100,00 |
26.510,00 |
117.1.1.1.22.231 |
Paku 1,5-1 inchi |
0.01 |
Kg |
34.700,00 |
347,00 |
|
|
|
|
Jumlah |
26.857,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
46.286,60 |
| 2020 | 24.1.9.52 | Pemasangan Plafon Asbes Semen, tebal 4 mm | M2 | 46.286,60 | Tidak Dipakai | |