1281 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.13 |
Pekerjaan Konstruksi Atap Kuda-Kuda/Gording Baja WF |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
123.1.1.1.1.23 |
Tukang |
0.06 |
OH |
177.500,00 |
10.650,00 |
|
|
|
|
Jumlah |
21.735,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.504 |
Besi Profil |
1.15 |
Kg |
20.100,00 |
23.115,00 |
|
|
|
|
Jumlah |
23.115,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
44.850,60 |
| 2020 | 24.1.9.13 | Pekerjaan Konstruksi Atap Kuda-Kuda/Gording Baja WF | kilogram | 44.850,60 | Tidak Dipakai | |
1282 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.14 |
Pemasangan Reng /Usuk kayu Kelas I |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.028 |
M3 |
21.864.300,00 |
612.200,42 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.25 |
Kg |
34.700,00 |
8.675,00 |
|
|
|
|
Jumlah |
620.875,42 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
657.101,42 |
| 2020 | 24.1.9.14 | Pemasangan Reng /Usuk kayu Kelas I | M2 | 657.101,42 | Tidak Dipakai | |
1283 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.15 |
Pemasangan Reng /Usuk Kayu Kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.028 |
M3 |
14.567.300,00 |
407.884,41 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.25 |
Kg |
34.700,00 |
8.675,00 |
|
|
|
|
Jumlah |
416.559,41 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
452.785,41 |
| 2020 | 24.1.9.15 | Pemasangan Reng /Usuk Kayu Kelas II | M2 | 452.785,41 | Tidak Dipakai | |
1284 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.16 |
Pemasangan Reng /Usuk Kayu Kelas III |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.028 |
M3 |
6.403.200,00 |
179.289,61 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.25 |
Kg |
34.700,00 |
8.675,00 |
|
|
|
|
Jumlah |
187.964,61 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
224.190,61 |
| 2020 | 24.1.9.16 | Pemasangan Reng /Usuk Kayu Kelas III | M2 | 224.190,61 | Tidak Dipakai | |
1285 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.17 |
Pemasang rangka atap Galvalume 0.75 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
81.466,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
81.466,00 |
| 2020 | 24.1.9.17 | Pemasang rangka atap Galvalume 0.75 | M2 | 81.466,00 | Tidak Dipakai | |
1286 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.18 |
Pemasang rangka atap Galvalume Tebal 0.6 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
81.466,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
81.466,00 |
| 2020 | 24.1.9.18 | Pemasang rangka atap Galvalume Tebal 0.6 mm | M2 | 81.466,00 | Tidak Dipakai | |
1287 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.19 |
Pemasangan Genteng Keramik |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.008 |
OH |
236.200,00 |
1.889,60 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
39.476,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.16 |
Genteng Keramik |
15 |
buah |
20.100,00 |
301.500,00 |
|
|
|
|
Jumlah |
301.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
340.976,50 |
| 2020 | 24.1.9.19 | Pemasangan Genteng Keramik | M2 | 340.976,50 | Tidak Dipakai | |
1288 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.20 |
Pemasangan Genteng Kaca |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.008 |
OH |
236.200,00 |
1.889,60 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
39.476,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.15 |
Genteng Kaca Beton |
25 |
buah |
533.600,00 |
13.340.000,00 |
|
|
|
|
Jumlah |
13.340.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
13.379.476,50 |
| 2020 | 24.1.9.20 | Pemasangan Genteng Kaca | M2 | 13.379.476,50 | Tidak Dipakai | |
1289 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.21 |
Pemasangan Genteng Beton |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.008 |
OH |
236.200,00 |
1.889,60 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
39.476,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.13 |
Genteng Beton Warna |
25 |
Keping |
9.400,00 |
235.000,00 |
|
|
|
|
Jumlah |
235.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
274.476,50 |
| 2020 | 24.1.9.21 | Pemasangan Genteng Beton | M2 | 274.476,50 | Tidak Dipakai | |
1290 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.22 |
Pemasangan Atap Sirap Asbes Tebal 4 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
77.222,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.33 |
Asbes Datar/ Eternit |
3.3 |
lembar |
40.100,00 |
132.330,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
3 |
buah |
133.400,00 |
400.200,00 |
|
|
|
|
Jumlah |
532.530,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
609.752,40 |
| 2020 | 24.1.9.22 | Pemasangan Atap Sirap Asbes Tebal 4 mm | M2 | 609.752,40 | Tidak Dipakai | |
1291 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.23 |
Pemasangan Penutup Atap Seng Gelombang BJLS 30 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.006 |
OH |
150.800,00 |
904,80 |
123.1.1.1.1.23 |
Tukang |
0.07 |
OH |
177.500,00 |
12.425,00 |
|
|
|
|
Jumlah |
16.017,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.13 |
Seng Gelombang BJLS 30 |
1 |
M2 |
133.400,00 |
133.400,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
4 |
buah |
133.400,00 |
533.600,00 |
|
|
|
|
Jumlah |
667.000,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
683.017,20 |
| 2020 | 24.1.9.23 | Pemasangan Penutup Atap Seng Gelombang BJLS 30 | M2 | 683.017,20 | Tidak Dipakai | |
1292 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.24 |
Pemasangan Penutup Atap Seng Gelombang BJLS 40 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.006 |
OH |
150.800,00 |
904,80 |
123.1.1.1.1.23 |
Tukang |
0.07 |
OH |
177.500,00 |
12.425,00 |
|
|
|
|
Jumlah |
16.017,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.7.13 |
Seng Gelombang BJLS 30 |
1.1 |
M2 |
133.400,00 |
146.740,00 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
4 |
buah |
133.400,00 |
533.600,00 |
|
|
|
|
Jumlah |
680.340,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
696.357,20 |
| 2020 | 24.1.9.24 | Pemasangan Penutup Atap Seng Gelombang BJLS 40 | M2 | 696.357,20 | Tidak Dipakai | |
1293 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.25 |
Pemasangan Penutup Atap Fiber Glass |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.14 |
OH |
150.800,00 |
21.112,00 |
123.1.1.1.1.23 |
Tukang |
0.067 |
OH |
177.500,00 |
11.892,50 |
|
|
|
|
Jumlah |
36.105,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.256 |
Paku seng payung |
0.05 |
Kg |
133.400,00 |
6.670,00 |
|
|
|
|
Jumlah |
6.670,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
42.775,50 |
| 2020 | 24.1.9.25 | Pemasangan Penutup Atap Fiber Glass | M2 | 42.775,50 | Tidak Dipakai | |
1294 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.26 |
Pemasangan Penutup Atap Galvalume |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.008 |
OH |
236.200,00 |
1.889,60 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
39.476,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
5.3 |
buah |
133.400,00 |
707.020,03 |
|
|
|
|
Jumlah |
707.020,03 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
746.496,53 |
| 2020 | 24.1.9.26 | Pemasangan Penutup Atap Galvalume | M2 | 746.496,53 | Tidak Dipakai | |
1295 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.27 |
Pemasangan Penutup Atap Rabung Genteng Keramik |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.002 |
OH |
206.800,00 |
413,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
100.957,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.56 |
Semen Portaland PC @ 50 Kg |
0.16 |
50kg/zak |
130.800,00 |
20.928,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0323 |
M3 |
180.100,00 |
5.817,23 |
117.1.1.1.14.20 |
Genteng Wuwung Jawa |
5 |
buah |
133.400,00 |
667.000,00 |
|
|
|
|
Jumlah |
693.745,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
794.702,83 |
| 2020 | 24.1.9.27 | Pemasangan Penutup Atap Rabung Genteng Keramik | M1 | 794.702,83 | Tidak Dipakai | |
1296 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.28 |
Pemasangan Penutup Atap Rabung Genteng Beton |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.002 |
OH |
206.800,00 |
413,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
100.957,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.0323 |
M3 |
180.100,00 |
5.817,23 |
117.1.1.1.14.24 |
Rabung Genteng Beton |
5 |
Keping |
193.500,00 |
967.500,00 |
|
|
|
|
Jumlah |
973.317,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.074.274,83 |
| 2020 | 24.1.9.28 | Pemasangan Penutup Atap Rabung Genteng Beton | M1 | 1.074.274,83 | Tidak Dipakai | |
1297 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.29 |
Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.013 |
OH |
236.200,00 |
3.070,60 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.084 |
OH |
150.800,00 |
12.667,20 |
123.1.1.1.1.23 |
Tukang |
0.125 |
OH |
177.500,00 |
22.187,50 |
|
|
|
|
Jumlah |
38.752,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.19 |
Genteng Wuwung Galvalume |
2.4 |
buah |
133.400,00 |
320.160,01 |
117.1.1.1.22.237 |
Paku Asbes skrup 4 inchi |
6 |
buah |
133.400,00 |
800.400,00 |
|
|
|
|
Jumlah |
1.120.560,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.159.312,51 |
| 2020 | 24.1.9.29 | Pemasangan Jurai Genteng Galvalume Tebal 4 mm (m) | M1 | 1.159.312,51 | Tidak Dipakai | |
1298 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.30 |
Pemasangan Listplank Kayu Kelas I |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
56.338,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
0.0108 |
M3 |
21.864.300,00 |
236.134,45 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
238.234,45 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
294.572,45 |
| 2020 | 24.1.9.30 | Pemasangan Listplank Kayu Kelas I | M1 | 294.572,45 | Tidak Dipakai | |
1299 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.31 |
Pemasangan Listplank Kayu Kelas II |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
56.338,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0108 |
M3 |
14.567.300,00 |
157.326,84 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
159.426,84 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
215.764,84 |
| 2020 | 24.1.9.31 | Pemasangan Listplank Kayu Kelas II | M1 | 215.764,84 | Tidak Dipakai | |
1300 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.32 |
Pemasangan Listplank Kayu Kelas III |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
56.338,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.011 |
M3 |
6.403.200,00 |
70.435,20 |
117.1.1.1.22.246 |
Paku Reng |
0.1 |
Kg |
21.000,00 |
2.100,00 |
|
|
|
|
Jumlah |
72.535,20 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
128.873,20 |
| 2020 | 24.1.9.32 | Pemasangan Listplank Kayu Kelas III | M1 | 128.873,20 | Tidak Dipakai | |