1261 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.14 |
Pemasangan lantai kayu gymfloor |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
183.190,00 |
| 2020 | 24.1.8.14 | Pemasangan lantai kayu gymfloor | M1 | 183.190,00 | Tidak Dipakai | |
1262 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.15 |
Dinding Keramik 20x20 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.045 |
OH |
236.200,00 |
10.629,00 |
123.1.1.1.1.6 |
Mandor |
0.045 |
OH |
206.800,00 |
9.306,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.9 |
OH |
150.800,00 |
135.720,00 |
123.1.1.1.1.23 |
Tukang |
0.45 |
OH |
177.500,00 |
79.875,00 |
|
|
|
|
Jumlah |
235.530,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
9.3 |
Kg |
2.600,00 |
24.180,00 |
117.1.1.1.2.58 |
Semen Warna |
1.94 |
Zak |
114.800,00 |
222.712,01 |
117.1.1.1.4.4 |
Pasir Pasang |
0.018 |
M3 |
180.100,00 |
3.241,80 |
117.1.1.12.1.67 |
Keramik 20x20 cm |
26.5 |
buah |
3.100,00 |
82.150,00 |
|
|
|
|
Jumlah |
332.283,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
567.813,80 |
| 2020 | 24.1.8.15 | Dinding Keramik 20x20 cm | M2 | 567.813,80 | Tidak Dipakai | |
1263 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.16 |
Dinding Keramik ukuran 20x25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.045 |
OH |
236.200,00 |
10.629,00 |
123.1.1.1.1.6 |
Mandor |
0.045 |
OH |
206.800,00 |
9.306,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.9 |
OH |
150.800,00 |
135.720,00 |
123.1.1.1.1.23 |
Tukang |
0.45 |
OH |
177.500,00 |
79.875,00 |
|
|
|
|
Jumlah |
235.530,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
9.3 |
Kg |
2.600,00 |
24.180,00 |
117.1.1.1.2.58 |
Semen Warna |
1.94 |
Zak |
114.800,00 |
222.712,01 |
117.1.1.1.4.4 |
Pasir Pasang |
0.018 |
M3 |
180.100,00 |
3.241,80 |
117.1.1.12.1.70 |
Keramik 20 x 25 cm |
21 |
buah |
4.700,00 |
98.700,00 |
|
|
|
|
Jumlah |
348.833,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
584.363,80 |
| 2020 | 24.1.8.16 | Dinding Keramik ukuran 20x25 cm | M2 | 584.363,80 | Tidak Dipakai | |
1264 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.17 |
Dinding batu tempel hitam |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
100.250,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
11.75 |
Kg |
2.600,00 |
30.550,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.035 |
M3 |
180.100,00 |
6.303,50 |
117.1.1.1.5.68 |
Batu Alam Paras Jogja |
1.1 |
M2 |
200.100,00 |
220.110,00 |
|
|
|
|
Jumlah |
256.963,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
357.213,50 |
| 2020 | 24.1.8.17 | Dinding batu tempel hitam | M2 | 357.213,50 | Tidak Dipakai | |
1265 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.18 |
Pemasangan wallpaper lebar 50 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.017 |
OH |
236.200,00 |
4.015,40 |
123.1.1.1.1.6 |
Mandor |
0.002 |
OH |
206.800,00 |
413,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
0.175 |
OH |
177.500,00 |
31.062,50 |
|
|
|
|
Jumlah |
88.271,50 |
|
Bahan/Material: |
|
|
|
|
132.5.2.6.1.531 |
Wallpaper Biasa |
2.2 |
meter |
246.800,00 |
542.960,01 |
|
|
|
|
Jumlah |
542.960,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
631.231,51 |
| 2020 | 24.1.8.18 | Pemasangan wallpaper lebar 50 cm | M2 | 631.231,51 | Tidak Dipakai | |
1266 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.19 |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.012 |
OH |
236.200,00 |
2.834,40 |
123.1.1.1.1.6 |
Mandor |
0.006 |
OH |
206.800,00 |
1.240,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.12 |
OH |
150.800,00 |
18.096,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
43.471,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.12.1.51 |
Floor Hardener |
5 |
Kg |
6.500,00 |
32.500,00 |
|
|
|
|
Jumlah |
32.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
75.971,20 |
| 2020 | 24.1.8.19 | Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) | M2 | 75.971,20 | Tidak Dipakai | |
1267 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.20 |
Pemasangan Alumunium Composite Panel (ACP) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.059 |
OH |
236.200,00 |
13.935,80 |
123.1.1.1.1.6 |
Mandor |
0.059 |
OH |
206.800,00 |
12.201,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3539 |
OH |
150.800,00 |
53.368,12 |
123.1.1.1.1.23 |
Tukang |
0.177 |
OH |
177.500,00 |
31.417,50 |
|
|
|
|
Jumlah |
110.922,62 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.111 |
Aluminium Composit Panel (ACP) |
1.05 |
M2 |
889.800,00 |
934.289,96 |
117.1.1.1.22.158 |
Dinaboltn dia. 10mm |
8 |
buah |
3.400,00 |
27.200,00 |
117.1.1.1.22.168 |
Frame Aluminium Hollow |
7.8 |
meter |
116.100,00 |
905.580,02 |
|
|
|
|
Jumlah |
1.867.069,98 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.3 |
Alat Bantu Pemasangan Alumunium Composite Panel (ACP) |
1 |
LS |
33.400,00 |
33.400,00 |
|
|
|
|
Jumlah |
33.400,00 |
|
|
|
|
Nilai HSPK |
2.011.392,60 |
| 2020 | 24.1.8.20 | Pemasangan Alumunium Composite Panel (ACP) | M2 | 2.011.392,60 | Tidak Dipakai | |
1268 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.21 |
Pemasangan Waterproofing Membrane Bakar |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.05 |
OH |
236.200,00 |
11.810,00 |
123.1.1.1.1.6 |
Mandor |
0.0035 |
OH |
206.800,00 |
723,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
127.438,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.43 |
Flinkote |
1.1 |
Kg |
73.400,00 |
80.740,00 |
117.1.1.1.22.304 |
Siku Bitumen |
1.1 |
M2 |
546.000,00 |
600.600,01 |
|
|
|
|
Jumlah |
681.340,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
808.778,81 |
| 2020 | 24.1.8.21 | Pemasangan Waterproofing Membrane Bakar | M2 | 808.778,81 | Tidak Dipakai | |
1269 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.1 |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas I bentang 6 m. |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.2 |
OH |
236.200,00 |
283.440,01 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4 |
OH |
150.800,00 |
603.200,00 |
123.1.1.1.1.23 |
Tukang |
12 |
OH |
177.500,00 |
2.130.000,00 |
|
|
|
|
Jumlah |
3.058.000,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.85 |
Papan/ Kaso Kayu Kelas I |
1.1 |
M3 |
21.864.300,00 |
24.050.730,52 |
117.1.1.1.22.236 |
Paku 4 inchi |
5.6 |
Kg |
24.100,00 |
134.960,00 |
|
|
|
|
Jumlah |
24.185.690,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
27.243.690,53 |
| 2020 | 24.1.9.1 | Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas I bentang 6 m. | M3 | 27.243.690,53 | Tidak Dipakai | |
1270 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.2 |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas II bentang 6 m. |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.2 |
OH |
236.200,00 |
283.440,01 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4 |
OH |
150.800,00 |
603.200,00 |
123.1.1.1.1.23 |
Tukang |
12 |
OH |
177.500,00 |
2.130.000,00 |
|
|
|
|
Jumlah |
3.058.000,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
1.1 |
M3 |
14.567.300,00 |
16.024.030,35 |
117.1.1.1.22.236 |
Paku 4 inchi |
5.6 |
Kg |
24.100,00 |
134.960,00 |
|
|
|
|
Jumlah |
16.158.990,35 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
19.216.990,36 |
| 2020 | 24.1.9.2 | Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas II bentang 6 m. | M3 | 19.216.990,36 | Tidak Dipakai | |
1271 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.3 |
Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas III bentang 6 m. |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
1.2 |
OH |
236.200,00 |
283.440,01 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4 |
OH |
150.800,00 |
603.200,00 |
123.1.1.1.1.23 |
Tukang |
12 |
OH |
177.500,00 |
2.130.000,00 |
|
|
|
|
Jumlah |
3.058.000,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
1.1 |
M3 |
6.403.200,00 |
7.043.520,15 |
117.1.1.1.22.236 |
Paku 4 inchi |
5.6 |
Kg |
24.100,00 |
134.960,00 |
|
|
|
|
Jumlah |
7.178.480,15 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.236.480,16 |
| 2020 | 24.1.9.3 | Pemasangan Konstruksi Kuda-Kuda Konvensional Kayu Kelas III bentang 6 m. | M3 | 10.236.480,16 | Tidak Dipakai | |
1272 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.4 |
Pemasangan konstruksi gordeng kayu kelas II |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
2.01 |
OH |
236.200,00 |
474.762,00 |
123.1.1.1.1.6 |
Mandor |
0.335 |
OH |
206.800,00 |
69.278,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.7 |
OH |
150.800,00 |
1.010.359,97 |
123.1.1.1.1.23 |
Tukang |
20.1 |
OH |
177.500,00 |
3.567.750,07 |
|
|
|
|
Jumlah |
5.122.150,04 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
1.1 |
M3 |
14.567.300,00 |
16.024.030,35 |
117.1.1.1.22.236 |
Paku 4 inchi |
3 |
Kg |
24.100,00 |
72.300,00 |
|
|
|
|
Jumlah |
16.096.330,35 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
21.218.480,39 |
| 2020 | 24.1.9.4 | Pemasangan konstruksi gordeng kayu kelas II | M3 | 21.218.480,39 | Tidak Dipakai | |
1273 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.5 |
Pemasangan rangka Penutup Atap genteng keramik kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.51 |
Kayu Papan/ Broti kelas I |
0.014 |
ton |
6.403.200,00 |
89.644,80 |
117.1.1.1.22.64 |
Kayu Uk 2"x 3" |
0.036 |
batang |
66.700,00 |
2.401,20 |
117.1.1.1.22.236 |
Paku 4 inchi |
0.25 |
Kg |
24.100,00 |
6.025,00 |
|
|
|
|
Jumlah |
98.071,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
134.297,00 |
| 2020 | 24.1.9.5 | Pemasangan rangka Penutup Atap genteng keramik kayu kelas II | M2 | 134.297,00 | Tidak Dipakai | |
1274 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.6 |
Pemasangan rangka Penutup Atap genteng Beton kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.51 |
Kayu Papan/ Broti kelas I |
0.014 |
ton |
6.403.200,00 |
89.644,80 |
117.1.1.1.22.64 |
Kayu Uk 2"x 3" |
0.057 |
batang |
66.700,00 |
3.801,90 |
117.1.1.1.22.236 |
Paku 4 inchi |
0.25 |
Kg |
24.100,00 |
6.025,00 |
|
|
|
|
Jumlah |
99.471,70 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
135.697,70 |
| 2020 | 24.1.9.6 | Pemasangan rangka Penutup Atap genteng Beton kayu kelas II | M2 | 135.697,70 | Tidak Dipakai | |
1275 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.7 |
Pemasangan rangka Penutup Atap Seng BJLS # 0,35 kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.012 |
OH |
236.200,00 |
2.834,40 |
123.1.1.1.1.6 |
Mandor |
0.006 |
OH |
206.800,00 |
1.240,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.12 |
OH |
150.800,00 |
18.096,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
43.471,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0062 |
M3 |
14.567.300,00 |
90.317,26 |
117.1.1.1.22.236 |
Paku 4 inchi |
0.2 |
Kg |
24.100,00 |
4.820,00 |
|
|
|
|
Jumlah |
95.137,26 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
138.608,46 |
| 2020 | 24.1.9.7 | Pemasangan rangka Penutup Atap Seng BJLS # 0,35 kayu kelas II | M2 | 138.608,46 | Tidak Dipakai | |
1276 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.8 |
Pemasangan rangka dan Penutup Atap Sirap Kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.012 |
OH |
236.200,00 |
2.834,40 |
123.1.1.1.1.6 |
Mandor |
0.006 |
OH |
206.800,00 |
1.240,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.12 |
OH |
150.800,00 |
18.096,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
43.471,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.165 |
M3 |
14.567.300,00 |
2.403.604,60 |
117.1.1.1.22.236 |
Paku 4 inchi |
0.2 |
Kg |
24.100,00 |
4.820,00 |
|
|
|
|
Jumlah |
2.408.424,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.451.895,79 |
| 2020 | 24.1.9.8 | Pemasangan rangka dan Penutup Atap Sirap Kayu kelas II | M2 | 2.451.895,79 | Tidak Dipakai | |
1277 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.9 |
Pemasangan lisplank ukuran (3x20) cm kayu kelas II |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
56.338,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.86 |
Papan/ Kaso Kayu Kelas II |
0.0108 |
M3 |
14.567.300,00 |
157.326,84 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.1 |
Kg |
34.700,00 |
3.470,00 |
|
|
|
|
Jumlah |
160.796,84 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
217.134,84 |
| 2020 | 24.1.9.9 | Pemasangan lisplank ukuran (3x20) cm kayu kelas II | M1 | 217.134,84 | Tidak Dipakai | |
1278 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.10 |
Pemasangan lisplank GRC |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.013 |
OH |
236.200,00 |
3.070,60 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.084 |
OH |
150.800,00 |
12.667,20 |
123.1.1.1.1.23 |
Tukang |
0.125 |
OH |
177.500,00 |
22.187,50 |
|
|
|
|
Jumlah |
38.752,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.22 |
Listplank GRC |
1.1 |
meter |
487.000,00 |
535.700,01 |
117.1.1.1.22.249 |
Paku Skrup / buah |
6 |
buah |
900,00 |
5.400,00 |
|
|
|
|
Jumlah |
541.100,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
579.852,51 |
| 2020 | 24.1.9.10 | Pemasangan lisplank GRC | M1 | 579.852,51 | Tidak Dipakai | |
1279 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.11 |
Pemasangan pelapis permukaan kayu - HPL |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.017 |
OH |
236.200,00 |
4.015,40 |
123.1.1.1.1.6 |
Mandor |
0.002 |
OH |
206.800,00 |
413,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
0.175 |
OH |
177.500,00 |
31.062,50 |
|
|
|
|
Jumlah |
88.271,50 |
|
Bahan/Material: |
|
|
|
|
132.3.2.13.1.104 |
High Pressure Laminate (HPL) |
0.4 |
lembar |
293.500,00 |
117.400,00 |
|
|
|
|
Jumlah |
117.400,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
205.671,50 |
| 2020 | 24.1.9.11 | Pemasangan pelapis permukaan kayu - HPL | M2 | 205.671,50 | Tidak Dipakai | |
1280 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.9.12 |
Pemasangan Polycarbonat |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
50.478,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.43 |
Atap Polikarbonat |
1.02 |
M2 |
193.500,00 |
197.370,00 |
117.1.1.1.22.247 |
Paku Sekrup |
0.2 |
kotak |
86.800,00 |
17.360,00 |
|
|
|
|
Jumlah |
214.730,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
265.208,80 |
| 2020 | 24.1.9.12 | Pemasangan Polycarbonat | M2 | 265.208,80 | Tidak Dipakai | |