1241 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.8 |
Pengecatan Besi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.02 |
OH |
150.800,00 |
3.016,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
45.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.4 |
Cat Besi (Kilat) |
0.1 |
Kg |
76.100,00 |
7.610,00 |
117.1.1.1.6.60 |
kuas 1 1/2 inchi |
0.01 |
buah |
13.400,00 |
134,00 |
|
|
|
|
Jumlah |
7.744,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
53.052,00 |
| 2020 | 24.1.7.8 | Pengecatan Besi | M2 | 53.052,00 | Tidak Dipakai | |
1242 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.9 |
Plamur Tembok |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.003 |
OH |
236.200,00 |
708,60 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.02 |
OH |
150.800,00 |
3.016,00 |
123.1.1.1.1.23 |
Tukang |
0.03 |
OH |
177.500,00 |
5.325,00 |
|
|
|
|
Jumlah |
9.256,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.71 |
Plamur |
0.1 |
20kg |
200.100,00 |
20.010,00 |
132.3.2.13.1.108 |
Kertas Pasir Halus |
0.5 |
lembar |
14.700,00 |
7.350,00 |
|
|
|
|
Jumlah |
27.360,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
36.616,40 |
| 2020 | 24.1.7.9 | Plamur Tembok | M2 | 36.616,40 | Tidak Dipakai | |
1243 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.10 |
Pengecatan Dasar Meni Besi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.02 |
OH |
150.800,00 |
3.016,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
45.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.18 |
Cat Meni Besi |
0.1 |
Kg |
50.700,00 |
5.070,00 |
117.1.1.1.6.60 |
kuas 1 1/2 inchi |
0.01 |
buah |
13.400,00 |
134,00 |
|
|
|
|
Jumlah |
5.204,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
50.512,00 |
| 2020 | 24.1.7.10 | Pengecatan Dasar Meni Besi | M2 | 50.512,00 | Tidak Dipakai | |
1244 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.11 |
Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0042 |
OH |
236.200,00 |
992,04 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.028 |
OH |
150.800,00 |
4.222,40 |
123.1.1.1.1.23 |
Tukang |
0.042 |
OH |
177.500,00 |
7.455,00 |
|
|
|
|
Jumlah |
13.186,44 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.32 |
Cat Tembok Wheatershields |
0.072 |
2,5 liter |
333.500,00 |
24.012,00 |
117.1.1.1.6.40 |
Dempul Jadi |
0.12 |
Kg |
61.400,00 |
7.368,00 |
132.3.2.13.1.108 |
Kertas Pasir Halus |
0.1 |
lembar |
14.700,00 |
1.470,00 |
|
|
|
|
Jumlah |
32.850,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
46.036,44 |
| 2020 | 24.1.7.11 | Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) | M2 | 46.036,44 | Tidak Dipakai | |
1245 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.12 |
Pengecatan Dinding Luar Baru |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0063 |
OH |
236.200,00 |
1.488,06 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.025 |
OH |
150.800,00 |
3.770,00 |
123.1.1.1.1.23 |
Tukang |
0.063 |
OH |
177.500,00 |
11.182,50 |
|
|
|
|
Jumlah |
16.957,56 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.32 |
Cat Tembok Wheatershields |
0.1 |
2,5 liter |
333.500,00 |
33.350,00 |
117.1.1.1.6.40 |
Dempul Jadi |
0.1 |
Kg |
61.400,00 |
6.140,00 |
132.3.2.13.1.108 |
Kertas Pasir Halus |
0.1 |
lembar |
14.700,00 |
1.470,00 |
|
|
|
|
Jumlah |
40.960,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
57.917,56 |
| 2020 | 24.1.7.12 | Pengecatan Dinding Luar Baru | M2 | 57.917,56 | Tidak Dipakai | |
1246 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.13 |
Pekerjaan Teer Kayu |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.006 |
OH |
206.800,00 |
1.240,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
16.320,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.59 |
Kolter |
0.175 |
Kg |
153.500,00 |
26.862,50 |
|
|
|
|
Jumlah |
26.862,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
43.183,30 |
| 2020 | 24.1.7.13 | Pekerjaan Teer Kayu | M2 | 43.183,30 | Tidak Dipakai | |
1247 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.14 |
Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.009 |
OH |
236.200,00 |
2.125,80 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.075 |
OH |
150.800,00 |
11.310,00 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
34.580,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.11 |
Cat Decold/ Shading |
0.2 |
Kg |
109.400,00 |
21.880,00 |
117.1.1.1.6.37 |
Clear Gloss |
0.2 |
Kg |
197.500,00 |
39.500,00 |
117.1.1.1.6.47 |
Kaleng Dempul Plastik |
0.2 |
kaleng |
50.700,00 |
10.140,00 |
117.1.1.1.6.86 |
Tinner Cobra |
0.837 |
liter |
40.100,00 |
33.563,70 |
117.1.1.1.6.89 |
Wood Filler / Cat Pewarna Kayu |
0.2 |
Kg |
126.500,00 |
25.300,00 |
132.3.2.13.1.108 |
Kertas Pasir Halus |
1 |
lembar |
14.700,00 |
14.700,00 |
132.3.2.13.1.109 |
Kertas Pasir Kasar |
1 |
lembar |
46.700,00 |
46.700,00 |
|
|
|
|
Jumlah |
191.783,70 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.13 |
Compressor Kecil |
0.625 |
jam |
100.100,00 |
62.562,50 |
|
|
|
|
Jumlah |
62.562,50 |
|
|
|
|
Nilai HSPK |
288.927,00 |
| 2020 | 24.1.7.14 | Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) | M2 | 288.927,00 | Tidak Dipakai | |
1248 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.1 |
Pemasangan Lantai Keramik 30x30 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10 |
Kg |
2.600,00 |
26.000,00 |
117.1.1.1.2.58 |
Semen Warna |
1.5 |
Zak |
114.800,00 |
172.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.74 |
Keramik 30 x 30 Cm |
11.87 |
buah |
15.900,00 |
188.733,00 |
|
|
|
|
Jumlah |
395.037,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
578.227,50 |
| 2020 | 24.1.8.1 | Pemasangan Lantai Keramik 30x30 cm | M2 | 578.227,50 | Tidak Dipakai | |
1249 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.2 |
Pemasangan Lantai Keramik 20x20 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.67 |
Keramik 20x20 cm |
26.5 |
buah |
3.100,00 |
82.150,00 |
|
|
|
|
Jumlah |
303.270,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
486.460,50 |
| 2020 | 24.1.8.2 | Pemasangan Lantai Keramik 20x20 cm | M2 | 486.460,50 | Tidak Dipakai | |
1250 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.3 |
Pemasangan Lantai Keramik ukurana 20x25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.70 |
Keramik 20 x 25 cm |
20 |
buah |
4.700,00 |
94.000,00 |
|
|
|
|
Jumlah |
315.120,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
498.310,50 |
| 2020 | 24.1.8.3 | Pemasangan Lantai Keramik ukurana 20x25 cm | M2 | 498.310,50 | Tidak Dipakai | |
1251 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.4 |
Pemasangan Lantai Keramik ukuran 60x60 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.77 |
Keramik 60 x 60 cm |
3 |
kotak |
151.900,00 |
455.700,00 |
|
|
|
|
Jumlah |
676.820,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
860.010,50 |
| 2020 | 24.1.8.4 | Pemasangan Lantai Keramik ukuran 60x60 cm | M2 | 860.010,50 | Tidak Dipakai | |
1252 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.5 |
Pemasangan Lantai Keramik ukuran 40x40 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.75 |
Keramik 40 x 40 cm |
6.5 |
kotak |
156.800,00 |
1.019.200,00 |
|
|
|
|
Jumlah |
1.240.320,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.423.510,50 |
| 2020 | 24.1.8.5 | Pemasangan Lantai Keramik ukuran 40x40 cm | M2 | 1.423.510,50 | Tidak Dipakai | |
1253 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.6 |
Pemasangan Lantai Keramik ukuran 40x40 cm setara Granito |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.82 |
Keramik Granito 40 X 40 Cm |
6.5 |
buah |
88.400,00 |
574.600,00 |
|
|
|
|
Jumlah |
795.720,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
978.910,50 |
| 2020 | 24.1.8.6 | Pemasangan Lantai Keramik ukuran 40x40 cm setara Granito | M2 | 978.910,50 | Tidak Dipakai | |
1254 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.7 |
Pemasangan Lantai Keramik ukuran 40x40 cm setara Essenza |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.4 |
Kg |
2.600,00 |
27.040,00 |
117.1.1.1.2.58 |
Semen Warna |
1.62 |
Zak |
114.800,00 |
185.976,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.045 |
M3 |
180.100,00 |
8.104,50 |
117.1.1.12.1.79 |
Keramik EZENZA 40 x 40 Cm |
6.5 |
kotak |
687.100,00 |
4.466.150,00 |
|
|
|
|
Jumlah |
4.687.270,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.870.460,50 |
| 2020 | 24.1.8.7 | Pemasangan Lantai Keramik ukuran 40x40 cm setara Essenza | M2 | 4.870.460,50 | Tidak Dipakai | |
1255 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.8 |
Pemasangan plint keramik ukuran 10cm x 20 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.09 |
OH |
150.800,00 |
13.572,00 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
38.848,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
1.14 |
Kg |
2.600,00 |
2.964,00 |
117.1.1.1.2.58 |
Semen Warna |
0.025 |
Zak |
114.800,00 |
2.870,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.003 |
M3 |
180.100,00 |
540,30 |
117.1.1.12.1.93 |
Plint Keramik 10 x 20 cm |
5.3 |
buah |
2.300,00 |
12.190,00 |
|
|
|
|
Jumlah |
18.564,30 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
57.412,30 |
| 2020 | 24.1.8.8 | Pemasangan plint keramik ukuran 10cm x 20 cm | M1 | 57.412,30 | Tidak Dipakai | |
1256 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.9 |
Pemasangan plint keramik ukuran 10cm x 30 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.09 |
OH |
150.800,00 |
13.572,00 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
38.848,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0.57 |
Kg |
2.600,00 |
1.482,00 |
117.1.1.1.2.58 |
Semen Warna |
0.013 |
Zak |
114.800,00 |
1.492,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0015 |
M3 |
180.100,00 |
270,15 |
117.1.1.12.1.94 |
Plint Keramik 10 x 30 cm |
5.3 |
kotak |
97.400,00 |
516.220,02 |
|
|
|
|
Jumlah |
519.464,57 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
558.312,57 |
| 2020 | 24.1.8.9 | Pemasangan plint keramik ukuran 10cm x 30 cm | M1 | 558.312,57 | Tidak Dipakai | |
1257 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.10 |
Pemasangan plint keramik ukuran 10cm x 40 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.09 |
OH |
150.800,00 |
13.572,00 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
38.848,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0.57 |
Kg |
2.600,00 |
1.482,00 |
117.1.1.1.2.58 |
Semen Warna |
0.013 |
Zak |
114.800,00 |
1.492,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0015 |
M3 |
180.100,00 |
270,15 |
117.1.1.12.1.96 |
Plint Keramik 10 x 40 |
5.3 |
kotak |
107.800,00 |
571.340,02 |
|
|
|
|
Jumlah |
574.584,57 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
613.432,57 |
| 2020 | 24.1.8.10 | Pemasangan plint keramik ukuran 10cm x 40 cm | M1 | 613.432,57 | Tidak Dipakai | |
1258 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.11 |
Pemasangan plint keramik ukuran 10cm x 60 cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.09 |
OH |
150.800,00 |
13.572,00 |
123.1.1.1.1.23 |
Tukang |
0.09 |
OH |
177.500,00 |
15.975,00 |
|
|
|
|
Jumlah |
38.848,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0.57 |
Kg |
2.600,00 |
1.482,00 |
117.1.1.1.2.58 |
Semen Warna |
0.013 |
Zak |
114.800,00 |
1.492,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0015 |
M3 |
180.100,00 |
270,15 |
117.1.1.12.1.98 |
Plint Keramik 10 x 60 cm |
5.3 |
buah |
11.400,00 |
60.420,00 |
|
|
|
|
Jumlah |
63.664,55 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
102.512,55 |
| 2020 | 24.1.8.11 | Pemasangan plint keramik ukuran 10cm x 60 cm | M1 | 102.512,55 | Tidak Dipakai | |
1259 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.12 |
Pemasangan lantai karpet |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.017 |
OH |
236.200,00 |
4.015,40 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.17 |
OH |
150.800,00 |
25.636,00 |
123.1.1.1.1.23 |
Tukang |
0.17 |
OH |
177.500,00 |
30.175,00 |
|
|
|
|
Jumlah |
61.687,60 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
61.687,60 |
| 2020 | 24.1.8.12 | Pemasangan lantai karpet | M1 | 61.687,60 | Tidak Dipakai | |
1260 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.8.13 |
Pemasangan lantai parquet Kayu |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.035 |
OH |
206.800,00 |
7.238,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.7 |
OH |
150.800,00 |
105.560,00 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
183.190,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
183.190,00 |
| 2020 | 24.1.8.13 | Pemasangan lantai parquet Kayu | M1 | 183.190,00 | Tidak Dipakai | |