1221 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.14 |
Dinding bata ringan tebal 10 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.13 |
OH |
236.200,00 |
30.706,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.671 |
OH |
150.800,00 |
101.186,80 |
123.1.1.1.1.23 |
Tukang |
0.3 |
OH |
177.500,00 |
53.250,00 |
|
|
|
|
Jumlah |
185.763,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.12 |
Semen Mortar |
0.063 |
Kg |
9.000,00 |
567,00 |
117.1.1.1.5.27 |
Batu Beton Ringan uk. 10x20x60 |
8.4 |
buah |
1.133.900,00 |
9.524.759,57 |
|
|
|
|
Jumlah |
9.525.326,57 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
9.711.089,77 |
| 2020 | 24.1.6.14 | Dinding bata ringan tebal 10 cm | M2 | 9.711.089,77 | Tidak Dipakai | |
1222 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.15 |
Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
15.504 |
Kg |
2.600,00 |
40.310,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.016 |
M3 |
180.100,00 |
2.881,60 |
|
|
|
|
Jumlah |
43.192,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
121.702,00 |
| 2020 | 24.1.6.15 | Plesteran Halus 1 Pc : 1 Ps tebal 1.5 cm | M2 | 121.702,00 | Tidak Dipakai | |
1223 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.16 |
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.224 |
Kg |
2.600,00 |
26.582,40 |
117.1.1.1.4.4 |
Pasir Pasang |
0.02 |
M3 |
180.100,00 |
3.602,00 |
|
|
|
|
Jumlah |
30.184,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
108.694,40 |
| 2020 | 24.1.6.16 | Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm | M2 | 108.694,40 | Tidak Dipakai | |
1224 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.17 |
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
7.776 |
Kg |
2.600,00 |
20.217,60 |
117.1.1.1.4.4 |
Pasir Pasang |
0.023 |
M3 |
180.100,00 |
4.142,30 |
|
|
|
|
Jumlah |
24.359,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
102.869,90 |
| 2020 | 24.1.6.17 | Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm | M2 | 102.869,90 | Tidak Dipakai | |
1225 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.18 |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
6.24 |
Kg |
2.600,00 |
16.224,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.026 |
M3 |
180.100,00 |
4.682,60 |
|
|
|
|
Jumlah |
20.906,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
99.416,60 |
| 2020 | 24.1.6.18 | Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm | M2 | 99.416,60 | Tidak Dipakai | |
1226 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.19 |
Plesteran Halus 1 Pc : 1 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
13.632 |
Kg |
2.600,00 |
35.443,20 |
117.1.1.1.4.4 |
Pasir Pasang |
0.0272 |
M3 |
180.100,00 |
4.898,72 |
|
|
|
|
Jumlah |
40.341,92 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
145.435,52 |
| 2020 | 24.1.6.19 | Plesteran Halus 1 Pc : 1 Ps tebal 2.0 cm | M2 | 145.435,52 | Tidak Dipakai | |
1227 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.20 |
Plesteran Halus 1 Pc : 3 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
10.368 |
Kg |
2.600,00 |
26.956,80 |
117.1.1.1.4.4 |
Pasir Pasang |
0.031 |
M3 |
180.100,00 |
5.583,10 |
|
|
|
|
Jumlah |
32.539,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
137.633,50 |
| 2020 | 24.1.6.20 | Plesteran Halus 1 Pc : 3 Ps tebal 2.0 cm | M2 | 137.633,50 | Tidak Dipakai | |
1228 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.21 |
Plesteran Halus 1 Pc : 4 Ps tebal 2.0 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.022 |
OH |
206.800,00 |
4.549,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
105.093,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
8.32 |
Kg |
2.600,00 |
21.632,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.032 |
M3 |
180.100,00 |
5.763,20 |
|
|
|
|
Jumlah |
27.395,20 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
132.488,80 |
| 2020 | 24.1.6.21 | Plesteran Halus 1 Pc : 4 Ps tebal 2.0 cm | M2 | 132.488,80 | Tidak Dipakai | |
1229 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.22 |
Plesteran Ciprat 1 Pc : 2PS |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
68.454,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
4.32 |
Kg |
2.600,00 |
11.232,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.006 |
M3 |
180.100,00 |
1.080,60 |
|
|
|
|
Jumlah |
12.312,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
80.766,60 |
| 2020 | 24.1.6.22 | Plesteran Ciprat 1 Pc : 2PS | M2 | 80.766,60 | Tidak Dipakai | |
1230 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.23 |
Pemasangan finishing siar pasangan bata merah |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.008 |
OH |
236.200,00 |
1.889,60 |
123.1.1.1.1.6 |
Mandor |
0.008 |
OH |
206.800,00 |
1.654,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
39.476,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
3.108 |
Kg |
2.600,00 |
8.080,80 |
|
|
|
|
Jumlah |
8.080,80 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
47.557,30 |
| 2020 | 24.1.6.23 | Pemasangan finishing siar pasangan bata merah | M2 | 47.557,30 | Tidak Dipakai | |
1231 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.24 |
Pemasangan finishing siar pasangan batu kali camp. 1SP : 2PP |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
78.510,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
3.108 |
Kg |
2.600,00 |
8.080,80 |
117.1.1.1.4.4 |
Pasir Pasang |
0.012 |
M3 |
180.100,00 |
2.161,20 |
|
|
|
|
Jumlah |
10.242,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
88.752,00 |
| 2020 | 24.1.6.24 | Pemasangan finishing siar pasangan batu kali camp. 1SP : 2PP | M2 | 88.752,00 | Tidak Dipakai | |
1232 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.25 |
Pemasangan acian |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
52.340,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
3.25 |
Kg |
2.600,00 |
8.450,00 |
|
|
|
|
Jumlah |
8.450,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
60.790,00 |
| 2020 | 24.1.6.25 | Pemasangan acian | M2 | 60.790,00 | Tidak Dipakai | |
1233 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.6.26 |
Pasang Benangan 1 Pc: 2Ps |
|
M |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.04 |
OH |
236.200,00 |
9.448,00 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.08 |
OH |
150.800,00 |
12.064,00 |
123.1.1.1.1.23 |
Tukang |
0.04 |
OH |
177.500,00 |
7.100,00 |
|
|
|
|
Jumlah |
29.439,20 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
3.25 |
Kg |
2.600,00 |
8.450,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.013 |
M3 |
180.100,00 |
2.341,30 |
|
|
|
|
Jumlah |
10.791,30 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
40.230,50 |
| 2020 | 24.1.6.26 | Pasang Benangan 1 Pc: 2Ps | M | 40.230,50 | Tidak Dipakai | |
1234 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.1 |
Pelapisan waterproofing biasa |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0075 |
OH |
236.200,00 |
1.771,50 |
123.1.1.1.1.6 |
Mandor |
0.0025 |
OH |
206.800,00 |
517,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0.075 |
OH |
177.500,00 |
13.312,50 |
|
|
|
|
Jumlah |
23.141,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.60 |
Waterproofing Acian |
0.35 |
Kg |
17.100,00 |
5.985,00 |
117.1.1.12.1.124 |
Atap Plastik Gelbang Fiber |
1 |
lembar |
30.700,00 |
30.700,00 |
|
|
|
|
Jumlah |
36.685,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
59.826,00 |
| 2020 | 24.1.7.1 | Pelapisan waterproofing biasa | M2 | 59.826,00 | Tidak Dipakai | |
1235 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.2 |
Pekerjaan pengikisan/pengerokan permukaan cat lama |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
23.240,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.77 |
Soda Api |
0.05 |
Kg |
37.400,00 |
1.870,00 |
|
|
|
|
Jumlah |
1.870,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
25.110,40 |
| 2020 | 24.1.7.2 | Pekerjaan pengikisan/pengerokan permukaan cat lama | M2 | 25.110,40 | Tidak Dipakai | |
1236 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.3 |
Pekerjaan pengikisan/pengerokan karat pada permukaan baja cara manual |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
23.240,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.77 |
Soda Api |
0.05 |
Kg |
37.400,00 |
1.870,00 |
|
|
|
|
Jumlah |
1.870,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
25.110,40 |
| 2020 | 24.1.7.3 | Pekerjaan pengikisan/pengerokan karat pada permukaan baja cara manual | M2 | 25.110,40 | Tidak Dipakai | |
1237 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.4 |
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.07 |
OH |
150.800,00 |
10.556,00 |
123.1.1.1.1.23 |
Tukang |
0.009 |
OH |
177.500,00 |
1.597,50 |
|
|
|
|
Jumlah |
14.191,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.7 |
Cat Dasar |
0.17 |
Kg |
40.100,00 |
6.817,00 |
117.1.1.1.6.14 |
Cat Kilat lcl |
0.26 |
Kg |
73.400,00 |
19.084,00 |
117.1.1.1.6.20 |
Cat Meni Kayu |
0.2 |
Kg |
50.700,00 |
10.140,00 |
117.1.1.1.6.44 |
Galon Tinner Sikkens @ 5 liter |
0.03 |
Galon |
33.400,00 |
1.002,00 |
117.1.1.1.6.49 |
Kertas Amplas |
0.2 |
lembar |
6.700,00 |
1.340,00 |
117.1.1.1.6.60 |
kuas 1 1/2 inchi |
0.01 |
buah |
13.400,00 |
134,00 |
117.1.1.1.6.71 |
Plamur |
0.15 |
20kg |
200.100,00 |
30.015,00 |
|
|
|
|
Jumlah |
68.532,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
82.723,10 |
| 2020 | 24.1.7.4 | Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) | M2 | 82.723,10 | Tidak Dipakai | |
1238 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.5 |
Pengecatan bidang kayu dengan cat vernis |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.016 |
OH |
236.200,00 |
3.779,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.16 |
OH |
150.800,00 |
24.128,00 |
123.1.1.1.1.23 |
Tukang |
0.16 |
OH |
177.500,00 |
28.400,00 |
|
|
|
|
Jumlah |
56.927,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.35 |
Cat Vernis Jadi |
0.15 |
Ltr |
92.100,00 |
13.815,00 |
117.1.1.1.6.40 |
Dempul Jadi |
0.05 |
Kg |
61.400,00 |
3.070,00 |
117.1.1.1.6.49 |
Kertas Amplas |
0.1 |
lembar |
6.700,00 |
670,00 |
|
|
|
|
Jumlah |
17.555,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
74.482,60 |
| 2020 | 24.1.7.5 | Pengecatan bidang kayu dengan cat vernis | M2 | 74.482,60 | Tidak Dipakai | |
1239 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.6 |
Pengecatan Bidang Kayu Lama (2 lapis cat penutup) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.016 |
OH |
236.200,00 |
3.779,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.16 |
OH |
150.800,00 |
24.128,00 |
123.1.1.1.1.23 |
Tukang |
0.16 |
OH |
177.500,00 |
28.400,00 |
|
|
|
|
Jumlah |
56.927,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.7 |
Cat Dasar |
0.17 |
Kg |
40.100,00 |
6.817,00 |
117.1.1.1.6.15 |
Cat Kilat Setara Bee Brand |
0.17 |
Kg |
93.400,00 |
15.878,00 |
117.1.1.1.6.60 |
kuas 1 1/2 inchi |
0.01 |
buah |
13.400,00 |
134,00 |
117.1.1.1.6.71 |
Plamur |
0.15 |
20kg |
200.100,00 |
30.015,00 |
|
|
|
|
Jumlah |
52.844,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
109.771,60 |
| 2020 | 24.1.7.6 | Pengecatan Bidang Kayu Lama (2 lapis cat penutup) | M2 | 109.771,60 | Tidak Dipakai | |
1240 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.7.7 |
Pengecatan Dinding Dalam Baru |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.063 |
OH |
236.200,00 |
14.880,60 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.0025 |
OH |
150.800,00 |
377,00 |
123.1.1.1.1.23 |
Tukang |
0.0063 |
OH |
177.500,00 |
1.118,25 |
|
|
|
|
Jumlah |
21.545,85 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.6.31 |
Cat Tembok Setara Paragon |
0.1 |
5kg |
166.800,00 |
16.680,00 |
117.1.1.1.6.40 |
Dempul Jadi |
0.1 |
Kg |
61.400,00 |
6.140,00 |
132.3.2.13.1.108 |
Kertas Pasir Halus |
0.1 |
lembar |
14.700,00 |
1.470,00 |
|
|
|
|
Jumlah |
24.290,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
45.835,85 |
| 2020 | 24.1.7.7 | Pengecatan Dinding Dalam Baru | M2 | 45.835,85 | Tidak Dipakai | |