1181 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.64 |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.333 |
OH |
236.200,00 |
78.654,60 |
123.1.1.1.1.6 |
Mandor |
0.318 |
OH |
206.800,00 |
65.762,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.35 |
OH |
150.800,00 |
957.579,99 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.692.184,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
210 |
Kg |
16.900,00 |
3.549.000,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
16 |
batang |
26.700,00 |
427.200,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.46 |
M3 |
6.403.200,00 |
2.945.472,05 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
8.457.534,03 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.149.718,50 |
| 2020 | 24.1.4.64 | Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) | M3 | 10.149.718,50 | Tidak Dipakai | |
1182 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.65 |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.333 |
OH |
236.200,00 |
78.654,60 |
123.1.1.1.1.6 |
Mandor |
0.318 |
OH |
206.800,00 |
65.762,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.35 |
OH |
150.800,00 |
957.579,99 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.692.184,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
16 |
batang |
26.700,00 |
427.200,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.46 |
M3 |
6.403.200,00 |
2.945.472,05 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
7.570.284,03 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
9.262.468,50 |
| 2020 | 24.1.4.65 | Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) | M3 | 9.262.468,50 | Tidak Dipakai | |
1183 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.66 |
Pekerjaan Balok Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.333 |
OH |
236.200,00 |
78.654,60 |
123.1.1.1.1.6 |
Mandor |
0.318 |
OH |
206.800,00 |
65.762,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.35 |
OH |
150.800,00 |
957.579,99 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.692.184,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
16 |
batang |
26.700,00 |
427.200,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.46 |
M3 |
6.403.200,00 |
2.945.472,05 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
7.126.659,03 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.818.843,50 |
| 2020 | 24.1.4.66 | Pekerjaan Balok Beton Bertulang (125 kg besi + Bekisting) | M3 | 8.818.843,50 | Tidak Dipakai | |
1184 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.67 |
Pekerjaan Balok Beton Bertulang (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.333 |
OH |
236.200,00 |
78.654,60 |
123.1.1.1.1.6 |
Mandor |
0.318 |
OH |
206.800,00 |
65.762,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.35 |
OH |
150.800,00 |
957.579,99 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.692.184,48 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
16 |
batang |
26.700,00 |
427.200,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.46 |
M3 |
6.403.200,00 |
2.945.472,05 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
6.683.034,03 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.375.218,50 |
| 2020 | 24.1.4.67 | Pekerjaan Balok Beton Bertulang (100 kg besi + Bekisting) | M3 | 8.375.218,50 | Tidak Dipakai | |
1185 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.68 |
Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.403 |
OH |
236.200,00 |
95.188,60 |
123.1.1.1.1.6 |
Mandor |
0.353 |
OH |
206.800,00 |
73.000,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
7.05 |
OH |
150.800,00 |
1.063.140,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
2.1 |
OH |
177.500,00 |
372.749,98 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.945.766,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
315 |
Kg |
16.900,00 |
5.323.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
2 |
Kg |
14.700,00 |
29.400,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.55 |
M3 |
6.403.200,00 |
3.521.760,08 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
3.5 |
lembar |
133.400,00 |
466.900,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
4 |
Kg |
34.700,00 |
138.800,00 |
117.1.1.1.22.542 |
Kawat Beton |
4.5 |
Kg |
34.882,00 |
156.969,00 |
|
|
|
|
Jumlah |
11.094.465,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
13.040.231,56 |
| 2020 | 24.1.4.68 | Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) | M3 | 13.040.231,56 | Tidak Dipakai | |
1186 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.69 |
Pekerjaan Kolom Beton Bekisting (200 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.403 |
OH |
236.200,00 |
95.188,60 |
123.1.1.1.1.6 |
Mandor |
0.353 |
OH |
206.800,00 |
73.000,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
7.05 |
OH |
150.800,00 |
1.063.140,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
2.1 |
OH |
177.500,00 |
372.749,98 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.945.766,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
210 |
Kg |
16.900,00 |
3.549.000,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
2 |
Kg |
14.700,00 |
29.400,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.55 |
M3 |
6.403.200,00 |
3.521.760,08 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
3.5 |
lembar |
133.400,00 |
466.900,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
4 |
Kg |
34.700,00 |
138.800,00 |
117.1.1.1.22.542 |
Kawat Beton |
4.5 |
Kg |
34.882,00 |
156.969,00 |
|
|
|
|
Jumlah |
9.319.965,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
11.265.731,56 |
| 2020 | 24.1.4.69 | Pekerjaan Kolom Beton Bekisting (200 kg besi + Bekisting) | M3 | 11.265.731,56 | Tidak Dipakai | |
1187 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.70 |
Pekerjaan Kolom Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.403 |
OH |
236.200,00 |
95.188,60 |
123.1.1.1.1.6 |
Mandor |
0.353 |
OH |
206.800,00 |
73.000,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
7.05 |
OH |
150.800,00 |
1.063.140,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
2.1 |
OH |
177.500,00 |
372.749,98 |
123.1.1.1.1.28 |
Tukang Kayu |
1.65 |
OH |
177.500,00 |
292.875,00 |
|
|
|
|
Jumlah |
1.945.766,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
2 |
Kg |
14.700,00 |
29.400,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.55 |
M3 |
6.403.200,00 |
3.521.760,08 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
3.5 |
lembar |
133.400,00 |
466.900,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
4 |
Kg |
34.700,00 |
138.800,00 |
117.1.1.1.22.542 |
Kawat Beton |
4.5 |
Kg |
34.882,00 |
156.969,00 |
|
|
|
|
Jumlah |
8.432.715,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
10.378.481,56 |
| 2020 | 24.1.4.70 | Pekerjaan Kolom Beton Bertulang (150 kg besi + Bekisting) | M3 | 10.378.481,56 | Tidak Dipakai | |
1188 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.71 |
Pekerjaan Kolom Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.265 |
OH |
236.200,00 |
62.593,00 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.382.572,51 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.44 |
M3 |
6.403.200,00 |
2.817.407,98 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
7.079.233,46 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.461.805,96 |
| 2020 | 24.1.4.71 | Pekerjaan Kolom Beton Bertulang (125 kg besi + Bekisting) | M3 | 8.461.805,96 | Tidak Dipakai | |
1189 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.72 |
Pekerjaan Kolom Beton Bertulang (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.265 |
OH |
236.200,00 |
62.593,00 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.382.572,51 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.44 |
M3 |
6.403.200,00 |
2.817.407,98 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.635.608,46 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.018.180,96 |
| 2020 | 24.1.4.72 | Pekerjaan Kolom Beton Bertulang (100 kg besi + Bekisting) | M3 | 8.018.180,96 | Tidak Dipakai | |
1190 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.73 |
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
210 |
Kg |
16.900,00 |
3.549.000,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
8.153.980,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
9.535.844,42 |
| 2020 | 24.1.4.73 | Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) | M3 | 9.535.844,42 | Tidak Dipakai | |
1191 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.74 |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
7.266.730,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.648.594,42 |
| 2020 | 24.1.4.74 | Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) | M3 | 8.648.594,42 | Tidak Dipakai | |
1192 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.75 |
Pekerjaan Dinding Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.823.105,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.204.969,42 |
| 2020 | 24.1.4.75 | Pekerjaan Dinding Beton Bertulang (125 kg besi + Bekisting) | M3 | 8.204.969,42 | Tidak Dipakai | |
1193 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.76 |
Pekerjaan Dinding Beton Bekisting (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
1.6 |
Kg |
14.700,00 |
23.520,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
20 |
batang |
26.700,00 |
534.000,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.4 |
M3 |
6.403.200,00 |
2.561.280,04 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
2.8 |
lembar |
133.400,00 |
373.519,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
3.2 |
Kg |
34.700,00 |
111.040,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
6.379.480,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
7.761.344,42 |
| 2020 | 24.1.4.76 | Pekerjaan Dinding Beton Bekisting (100 kg besi + Bekisting) | M3 | 7.761.344,42 | Tidak Dipakai | |
1194 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.77 |
Pekerjaan Kolom Praktis (11 x 11 cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.009 |
OH |
206.800,00 |
1.861,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.18 |
OH |
150.800,00 |
27.144,00 |
123.1.1.1.1.24 |
Tukang Batu |
0.02 |
OH |
177.500,00 |
3.550,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.02 |
OH |
177.500,00 |
3.550,00 |
123.1.1.1.1.28 |
Tukang Kayu |
0.02 |
OH |
177.500,00 |
3.550,00 |
|
|
|
|
Jumlah |
41.072,40 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
4 |
Kg |
2.600,00 |
10.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.006 |
M3 |
180.100,00 |
1.080,60 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.009 |
M3 |
280.200,00 |
2.521,80 |
117.1.1.1.14.32 |
Besi Beton Polos |
3 |
Kg |
16.900,00 |
50.700,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.002 |
M3 |
6.403.200,00 |
12.806,40 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.01 |
Kg |
34.700,00 |
347,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.45 |
Kg |
34.882,00 |
15.696,90 |
|
|
|
|
Jumlah |
93.552,70 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
134.625,10 |
| 2020 | 24.1.4.77 | Pekerjaan Kolom Praktis (11 x 11 cm) | M1 | 134.625,10 | Tidak Dipakai | |
1195 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.78 |
Pekerjaan Ring Balok (10x15) cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.297 |
OH |
150.800,00 |
44.787,60 |
123.1.1.1.1.24 |
Tukang Batu |
0.033 |
OH |
177.500,00 |
5.857,50 |
123.1.1.1.1.25 |
Tukang Besi |
0.033 |
OH |
177.500,00 |
5.857,50 |
123.1.1.1.1.28 |
Tukang Kayu |
0.033 |
OH |
177.500,00 |
5.857,50 |
|
|
|
|
Jumlah |
67.824,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
5.5 |
Kg |
2.600,00 |
14.300,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.009 |
M3 |
180.100,00 |
1.620,90 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.015 |
M3 |
280.200,00 |
4.203,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.003 |
M3 |
6.403.200,00 |
19.209,60 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.02 |
Kg |
34.700,00 |
694,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.05 |
Kg |
34.882,00 |
1.744,10 |
|
|
|
|
Jumlah |
41.771,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
109.595,70 |
| 2020 | 24.1.4.78 | Pekerjaan Ring Balok (10x15) cm | M1 | 109.595,70 | Tidak Dipakai | |
1196 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.1 |
Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.006 |
OH |
236.200,00 |
1.417,20 |
123.1.1.1.1.6 |
Mandor |
0.003 |
OH |
206.800,00 |
620,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.06 |
OH |
150.800,00 |
9.048,00 |
|
|
|
|
Jumlah |
11.085,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.504 |
Besi Profil |
1.15 |
Kg |
20.100,00 |
23.115,00 |
117.1.1.4.6.6 |
Minyak Solar |
0.01 |
Ltr |
15.700,00 |
157,00 |
117.1.1.4.6.21 |
Pelumas Gerdang |
0.001 |
Ltr |
80.100,00 |
80,10 |
|
|
|
|
Jumlah |
23.352,10 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.37 |
Mesin Perakitan Besi/Baja lengkap |
0.008 |
jam |
751.100,00 |
6.008,80 |
|
|
|
|
Jumlah |
6.008,80 |
|
|
|
|
Nilai HSPK |
40.446,50 |
| 2020 | 24.1.5.1 | Pekerjaan Perakitan dan Pemasangan Struktur Besi/Baja Profil | kilogram | 40.446,50 | Tidak Dipakai | |
1197 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.2 |
Pekerjaan Pengelasan dengan las listrik |
|
cm |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0002 |
OH |
236.200,00 |
47,24 |
123.1.1.1.1.6 |
Mandor |
0.0002 |
OH |
206.800,00 |
41,36 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.004 |
OH |
150.800,00 |
603,20 |
123.1.1.1.1.25 |
Tukang Besi |
0.002 |
OH |
177.500,00 |
355,00 |
|
|
|
|
Jumlah |
1.046,80 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.204 |
Kawat Las RB 26 2,6 mm |
0.04 |
unit |
867.100,00 |
34.684,00 |
117.1.1.4.6.6 |
Minyak Solar |
0.003 |
Ltr |
15.700,00 |
47,10 |
117.1.1.4.6.21 |
Pelumas Gerdang |
0.004 |
Ltr |
80.100,00 |
320,40 |
|
|
|
|
Jumlah |
35.051,50 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.36 |
Mesin Las |
0.017 |
jam |
58.700,00 |
997,90 |
|
|
|
|
Jumlah |
997,90 |
|
|
|
|
Nilai HSPK |
37.096,20 |
| 2020 | 24.1.5.2 | Pekerjaan Pengelasan dengan las listrik | cm | 37.096,20 | Tidak Dipakai | |
1198 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.3 |
Pekerjaan Pemasangan Kawat Nyamuk |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.142 |
Besi Strip 12,2 mm |
1.716 |
batang |
98.800,00 |
169.540,80 |
117.1.1.1.22.211 |
Kawat Nyamuk |
1.1 |
M2 |
45.800,00 |
50.380,00 |
117.1.1.1.22.264 |
Pekerjaan Pengelasan dengan las listrik |
11.11 |
cm |
3.500,00 |
38.885,00 |
|
|
|
|
Jumlah |
258.805,80 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
295.031,80 |
| 2020 | 24.1.5.3 | Pekerjaan Pemasangan Kawat Nyamuk | M2 | 295.031,80 | Tidak Dipakai | |
1199 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.4 |
Pekerjaan atap pelana rangkap atap Besi Baja Ringan Canal C 75 bahan atap seng/spandek/zincalum |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
215.288,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.5 |
Baja Ringan Canal C75 |
3.065 |
batang |
81.200,00 |
248.878,00 |
|
|
|
|
Jumlah |
248.878,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
464.166,01 |
| 2020 | 24.1.5.4 | Pekerjaan atap pelana rangkap atap Besi Baja Ringan Canal C 75 bahan atap seng/spandek/zincalum | M2 | 464.166,01 | Tidak Dipakai | |
1200 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.5.5 |
Pekerjaan atap pelana rangkap atap baja ringan profil C 75 bahan atap genteng |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.6 |
OH |
150.800,00 |
90.480,00 |
123.1.1.1.1.25 |
Tukang Besi |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
215.288,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.8.5 |
Baja Ringan Canal C75 |
3.5248 |
batang |
81.200,00 |
286.213,77 |
|
|
|
|
Jumlah |
286.213,77 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
501.501,77 |
| 2020 | 24.1.5.5 | Pekerjaan atap pelana rangkap atap baja ringan profil C 75 bahan atap genteng | M2 | 501.501,77 | Tidak Dipakai | |