1161 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.44 |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.23 |
Beton Cor K 350 |
1.02 |
M3 |
1.580.800,00 |
1.612.415,97 |
|
|
|
|
Jumlah |
1.612.415,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.834.175,97 |
| 2020 | 24.1.4.44 | Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, Ready Mix | M3 | 1.834.175,97 | Tidak Dipakai | |
1162 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.45 |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.23 |
Beton Cor K 350 |
1.02 |
M3 |
1.580.800,00 |
1.612.415,97 |
|
|
|
|
Jumlah |
1.612.415,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.302.643,96 |
| 2020 | 24.1.4.45 | Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, Ready Mix dan Pompa Beton | M3 | 2.302.643,96 | Tidak Dipakai | |
1163 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.46 |
Tulangan Beton dengan besi polos |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.007 |
OH |
150.800,00 |
1.055,60 |
123.1.1.1.1.23 |
Tukang |
0.007 |
OH |
177.500,00 |
1.242,50 |
|
|
|
|
Jumlah |
4.778,70 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.05 |
Kg |
16.900,00 |
17.745,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.015 |
Kg |
34.882,00 |
523,23 |
|
|
|
|
Jumlah |
18.268,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
23.046,93 |
| 2020 | 24.1.4.46 | Tulangan Beton dengan besi polos | kilogram | 23.046,93 | Tidak Dipakai | |
1164 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.47 |
Tulangan Beton dengan besi ulir |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.007 |
OH |
236.200,00 |
1.653,40 |
123.1.1.1.1.6 |
Mandor |
0.004 |
OH |
206.800,00 |
827,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.007 |
OH |
150.800,00 |
1.055,60 |
123.1.1.1.1.23 |
Tukang |
0.007 |
OH |
177.500,00 |
1.242,50 |
|
|
|
|
Jumlah |
4.778,70 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.12.24 |
Besi Beton Ulir |
1.05 |
Kg |
17.700,00 |
18.585,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.015 |
Kg |
34.882,00 |
523,23 |
|
|
|
|
Jumlah |
19.108,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
23.886,93 |
| 2020 | 24.1.4.47 | Tulangan Beton dengan besi ulir | kilogram | 23.886,93 | Tidak Dipakai | |
1165 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.48 |
Tulangan Beton dengan Wiremesh |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.001 |
OH |
206.800,00 |
206,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.025 |
OH |
150.800,00 |
3.770,00 |
123.1.1.1.1.23 |
Tukang |
0.025 |
OH |
177.500,00 |
4.437,50 |
|
|
|
|
Jumlah |
14.319,30 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.147 |
Besi Wire Mess |
1.02 |
M2 |
137.500,00 |
140.250,00 |
117.1.1.1.22.542 |
Kawat Beton |
1.05 |
Kg |
34.882,00 |
36.626,10 |
|
|
|
|
Jumlah |
176.876,10 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
191.195,40 |
| 2020 | 24.1.4.48 | Tulangan Beton dengan Wiremesh | M2 | 191.195,40 | Tidak Dipakai | |
1166 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.49 |
Tulangan Beton dengan Kabel prestressed polos/strand |
|
kilogram |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0005 |
OH |
236.200,00 |
118,10 |
123.1.1.1.1.6 |
Mandor |
0.0003 |
OH |
206.800,00 |
62,04 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.005 |
OH |
150.800,00 |
754,00 |
123.1.1.1.1.23 |
Tukang |
0.005 |
OH |
177.500,00 |
887,50 |
|
|
|
|
Jumlah |
1.821,64 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.14.32 |
Besi Beton Polos |
1.05 |
Kg |
16.900,00 |
17.745,00 |
117.1.1.1.22.542 |
Kawat Beton |
0.01 |
Kg |
34.882,00 |
348,82 |
|
|
|
|
Jumlah |
18.093,82 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
19.915,46 |
| 2020 | 24.1.4.49 | Tulangan Beton dengan Kabel prestressed polos/strand | kilogram | 19.915,46 | Tidak Dipakai | |
1167 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.50 |
Bekisting untuk Pondasi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.026 |
OH |
236.200,00 |
6.141,20 |
123.1.1.1.1.6 |
Mandor |
0.026 |
OH |
206.800,00 |
5.376,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.52 |
OH |
150.800,00 |
78.416,00 |
123.1.1.1.1.23 |
Tukang |
0.26 |
OH |
177.500,00 |
46.150,00 |
|
|
|
|
Jumlah |
136.084,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.04 |
M3 |
6.403.200,00 |
256.127,99 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.3 |
Kg |
34.700,00 |
10.410,00 |
|
|
|
|
Jumlah |
266.537,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
402.621,99 |
| 2020 | 24.1.4.50 | Bekisting untuk Pondasi | M2 | 402.621,99 | Tidak Dipakai | |
1168 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.51 |
Bekisting untuk Sloof |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.026 |
OH |
236.200,00 |
6.141,20 |
123.1.1.1.1.6 |
Mandor |
0.026 |
OH |
206.800,00 |
5.376,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.52 |
OH |
150.800,00 |
78.416,00 |
123.1.1.1.1.23 |
Tukang |
0.26 |
OH |
177.500,00 |
46.150,00 |
|
|
|
|
Jumlah |
136.084,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.1 |
Kg |
14.700,00 |
1.470,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.045 |
M3 |
6.403.200,00 |
288.144,01 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.3 |
Kg |
34.700,00 |
10.410,00 |
|
|
|
|
Jumlah |
300.024,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
436.108,01 |
| 2020 | 24.1.4.51 | Bekisting untuk Sloof | M2 | 436.108,01 | Tidak Dipakai | |
1169 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.52 |
Bekisting untuk Kolom |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.033 |
OH |
206.800,00 |
6.824,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.66 |
OH |
150.800,00 |
99.528,00 |
123.1.1.1.1.23 |
Tukang |
0.33 |
OH |
177.500,00 |
58.575,00 |
|
|
|
|
Jumlah |
172.722,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.2 |
Kg |
14.700,00 |
2.940,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
2 |
batang |
26.700,00 |
53.400,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.055 |
M3 |
6.403.200,00 |
352.176,00 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
0.35 |
lembar |
133.400,00 |
46.690,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.4 |
Kg |
34.700,00 |
13.880,00 |
|
|
|
|
Jumlah |
469.086,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
641.808,00 |
| 2020 | 24.1.4.52 | Bekisting untuk Kolom | M2 | 641.808,00 | Tidak Dipakai | |
1170 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.53 |
Bekisting untuk Balok |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.033 |
OH |
206.800,00 |
6.824,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.66 |
OH |
150.800,00 |
99.528,00 |
123.1.1.1.1.23 |
Tukang |
0.33 |
OH |
177.500,00 |
58.575,00 |
|
|
|
|
Jumlah |
172.722,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.2 |
Kg |
14.700,00 |
2.940,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
2 |
batang |
26.700,00 |
53.400,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.058 |
M3 |
6.403.200,00 |
371.385,59 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
0.35 |
lembar |
133.400,00 |
46.690,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.4 |
Kg |
34.700,00 |
13.880,00 |
|
|
|
|
Jumlah |
488.295,59 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
661.017,59 |
| 2020 | 24.1.4.53 | Bekisting untuk Balok | M2 | 661.017,59 | Tidak Dipakai | |
1171 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.54 |
Bekisting untuk Lantai |
|
M2 |
|
|
|
Upah: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.2 |
Kg |
14.700,00 |
2.940,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
6 |
batang |
26.700,00 |
160.200,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.055 |
M3 |
6.403.200,00 |
352.176,00 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
0.35 |
lembar |
133.400,00 |
46.690,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.4 |
Kg |
34.700,00 |
13.880,00 |
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.033 |
OH |
206.800,00 |
6.824,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.66 |
OH |
150.800,00 |
99.528,00 |
123.1.1.1.1.23 |
Tukang |
0.33 |
OH |
177.500,00 |
58.575,00 |
|
|
|
|
Jumlah |
748.608,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
748.608,00 |
| 2020 | 24.1.4.54 | Bekisting untuk Lantai | M2 | 748.608,00 | Tidak Dipakai | |
1172 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.55 |
Bekisting untuk Dinding |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.033 |
OH |
206.800,00 |
6.824,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.66 |
OH |
150.800,00 |
99.528,00 |
123.1.1.1.1.23 |
Tukang |
0.33 |
OH |
177.500,00 |
58.575,00 |
|
|
|
|
Jumlah |
172.722,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.2 |
Kg |
14.700,00 |
2.940,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
3 |
batang |
26.700,00 |
80.100,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.05 |
M3 |
6.403.200,00 |
320.160,00 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
0.35 |
lembar |
133.400,00 |
46.690,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.4 |
Kg |
34.700,00 |
13.880,00 |
|
|
|
|
Jumlah |
463.770,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
636.492,01 |
| 2020 | 24.1.4.55 | Bekisting untuk Dinding | M2 | 636.492,01 | Tidak Dipakai | |
1173 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.56 |
Bekisting untuk Tangga |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.033 |
OH |
236.200,00 |
7.794,60 |
123.1.1.1.1.6 |
Mandor |
0.033 |
OH |
206.800,00 |
6.824,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.66 |
OH |
150.800,00 |
99.528,00 |
123.1.1.1.1.23 |
Tukang |
0.33 |
OH |
177.500,00 |
58.575,00 |
|
|
|
|
Jumlah |
172.722,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.21.3 |
Minyak Bekesting |
0.15 |
Kg |
14.700,00 |
2.205,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
2 |
batang |
26.700,00 |
53.400,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.045 |
M3 |
6.403.200,00 |
288.144,01 |
117.1.1.1.22.95 |
Polywood # 9 ukuran 120 x 240 |
0.35 |
lembar |
133.400,00 |
46.690,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.4 |
Kg |
34.700,00 |
13.880,00 |
|
|
|
|
Jumlah |
404.319,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
577.041,02 |
| 2020 | 24.1.4.56 | Bekisting untuk Tangga | M2 | 577.041,02 | Tidak Dipakai | |
1174 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.57 |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.4 |
Kg |
14.700,00 |
5.880,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.2 |
M3 |
6.403.200,00 |
1.280.640,02 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
1.5 |
Kg |
34.700,00 |
52.050,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
5.001.940,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.383.804,41 |
| 2020 | 24.1.4.57 | Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) | M3 | 6.383.804,41 | Tidak Dipakai | |
1175 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.58 |
Pekerjaan Pondasi Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.4 |
Kg |
14.700,00 |
5.880,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.2 |
M3 |
6.403.200,00 |
1.280.640,02 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
1.5 |
Kg |
34.700,00 |
52.050,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
4.558.315,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.940.179,41 |
| 2020 | 24.1.4.58 | Pekerjaan Pondasi Beton Bertulang (125 kg besi + Bekisting) | M3 | 5.940.179,41 | Tidak Dipakai | |
1176 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.59 |
Pekerjaan Pondasi Beton Bertulang (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.262 |
OH |
236.200,00 |
61.884,40 |
123.1.1.1.1.6 |
Mandor |
0.265 |
OH |
206.800,00 |
54.802,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.3 |
OH |
150.800,00 |
799.240,03 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.05 |
OH |
177.500,00 |
186.374,99 |
123.1.1.1.1.28 |
Tukang Kayu |
1.3 |
OH |
177.500,00 |
230.749,99 |
|
|
|
|
Jumlah |
1.381.863,91 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.4 |
Kg |
14.700,00 |
5.880,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.2 |
M3 |
6.403.200,00 |
1.280.640,02 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
1.5 |
Kg |
34.700,00 |
52.050,00 |
117.1.1.1.22.542 |
Kawat Beton |
2.25 |
Kg |
34.882,00 |
78.484,50 |
|
|
|
|
Jumlah |
4.114.690,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.496.554,41 |
| 2020 | 24.1.4.59 | Pekerjaan Pondasi Beton Bertulang (100 kg besi + Bekisting) | M3 | 5.496.554,41 | Tidak Dipakai | |
1177 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.60 |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.323 |
OH |
236.200,00 |
76.292,60 |
123.1.1.1.1.6 |
Mandor |
0.283 |
OH |
206.800,00 |
58.524,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.65 |
OH |
150.800,00 |
852.020,01 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.56 |
OH |
177.500,00 |
276.899,99 |
|
|
|
|
Jumlah |
1.561.049,50 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
210 |
Kg |
16.900,00 |
3.549.000,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.6 |
Kg |
14.700,00 |
8.820,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.27 |
M3 |
6.403.200,00 |
1.728.864,07 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
2 |
Kg |
34.700,00 |
69.400,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
6.383.866,05 |
|
|
|
|
Nilai HSPK |
7.944.915,55 |
| 2020 | 24.1.4.60 | Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) | M3 | 7.944.915,55 | Tidak Dipakai | |
1178 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.61 |
Pekerjaan Sloof Beton Bertulang (150 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.323 |
OH |
236.200,00 |
76.292,60 |
123.1.1.1.1.6 |
Mandor |
0.283 |
OH |
206.800,00 |
58.524,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.65 |
OH |
150.800,00 |
852.020,01 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.56 |
OH |
177.500,00 |
276.899,99 |
|
|
|
|
Jumlah |
1.561.049,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
157.5 |
Kg |
16.900,00 |
2.661.750,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.6 |
Kg |
14.700,00 |
8.820,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.27 |
M3 |
6.403.200,00 |
1.728.864,07 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
2 |
Kg |
34.700,00 |
69.400,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
5.496.616,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
7.057.665,55 |
| 2020 | 24.1.4.61 | Pekerjaan Sloof Beton Bertulang (150 kg besi + Bekisting) | M3 | 7.057.665,55 | Tidak Dipakai | |
1179 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.62 |
Pekerjaan Sloof Beton Bertulang (125 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.323 |
OH |
236.200,00 |
76.292,60 |
123.1.1.1.1.6 |
Mandor |
0.283 |
OH |
206.800,00 |
58.524,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.65 |
OH |
150.800,00 |
852.020,01 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.56 |
OH |
177.500,00 |
276.899,99 |
|
|
|
|
Jumlah |
1.561.049,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
131.25 |
Kg |
16.900,00 |
2.218.125,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.6 |
Kg |
14.700,00 |
8.820,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.27 |
M3 |
6.403.200,00 |
1.728.864,07 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
2 |
Kg |
34.700,00 |
69.400,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
5.052.991,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.614.040,55 |
| 2020 | 24.1.4.62 | Pekerjaan Sloof Beton Bertulang (125 kg besi + Bekisting) | M3 | 6.614.040,55 | Tidak Dipakai | |
1180 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.63 |
Pekerjaan Sloof Beton Bertulang (100 kg besi + Bekisting) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.323 |
OH |
236.200,00 |
76.292,60 |
123.1.1.1.1.6 |
Mandor |
0.283 |
OH |
206.800,00 |
58.524,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
5.65 |
OH |
150.800,00 |
852.020,01 |
123.1.1.1.1.24 |
Tukang Batu |
0.275 |
OH |
177.500,00 |
48.812,50 |
123.1.1.1.1.25 |
Tukang Besi |
1.4 |
OH |
177.500,00 |
248.500,00 |
123.1.1.1.1.28 |
Tukang Kayu |
1.56 |
OH |
177.500,00 |
276.899,99 |
|
|
|
|
Jumlah |
1.561.049,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.53 |
Semen (Pc) |
8.4 |
Zak |
71.300,00 |
598.919,97 |
117.1.1.1.4.4 |
Pasir Pasang |
0.54 |
M3 |
180.100,00 |
97.254,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.81 |
M3 |
280.200,00 |
226.962,00 |
117.1.1.1.14.32 |
Besi Beton Polos |
105 |
Kg |
16.900,00 |
1.774.500,00 |
117.1.1.1.21.3 |
Minyak Bekesting |
0.6 |
Kg |
14.700,00 |
8.820,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.27 |
M3 |
6.403.200,00 |
1.728.864,07 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
2 |
Kg |
34.700,00 |
69.400,00 |
117.1.1.1.22.542 |
Kawat Beton |
3 |
Kg |
34.882,00 |
104.646,00 |
|
|
|
|
Jumlah |
4.609.366,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
6.170.415,55 |
| 2020 | 24.1.4.63 | Pekerjaan Sloof Beton Bertulang (100 kg besi + Bekisting) | M3 | 6.170.415,55 | Tidak Dipakai | |