NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.24 |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.18 |
Beton Cor K 225 |
1.02 |
M3 |
1.440.800,00 |
1.469.615,97 |
|
|
|
|
Jumlah |
1.469.615,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.691.375,97 |
| 2020 | 24.1.4.24 | Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, Ready Mix | M3 | 1.691.375,97 | Tidak Dipakai | |
1142 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.25 |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.18 |
Beton Cor K 225 |
1.02 |
M3 |
1.440.800,00 |
1.469.615,97 |
|
|
|
|
Jumlah |
1.469.615,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.159.843,96 |
| 2020 | 24.1.4.25 | Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, Ready Mix dan Pompa Beton | M3 | 2.159.843,96 | Tidak Dipakai | |
1143 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.26 |
Beton mutu f'c 21,7 (K-250), slump (12±2) cm. w/c= 0,56, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
384 |
Kg |
2.600,00 |
998.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4943 |
M3 |
180.100,00 |
89.023,43 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7696 |
M3 |
280.200,00 |
215.641,91 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.310.805,34 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.649.173,44 |
| 2020 | 24.1.4.26 | Beton mutu f'c 21,7 (K-250), slump (12±2) cm. w/c= 0,56, manual | M3 | 1.649.173,44 | Tidak Dipakai | |
1144 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.27 |
Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
384 |
Kg |
2.600,00 |
998.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4943 |
M3 |
180.100,00 |
89.023,43 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7696 |
M3 |
280.200,00 |
215.641,91 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.310.805,34 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.974.996,64 |
| 2020 | 24.1.4.27 | Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, dengan Molen | M3 | 1.974.996,64 | Tidak Dipakai | |
1145 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.28 |
Beton mutu f'c 21,7 (K-250), slump (12±2) cm. w/c=0,56, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.19 |
Beton Cor K 250 |
1.02 |
M3 |
1.467.400,00 |
1.496.747,97 |
|
|
|
|
Jumlah |
1.496.747,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.718.507,97 |
| 2020 | 24.1.4.28 | Beton mutu f'c 21,7 (K-250), slump (12±2) cm. w/c=0,56, Ready Mix | M3 | 1.718.507,97 | Tidak Dipakai | |
1146 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.29 |
Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.19 |
Beton Cor K 250 |
1.02 |
M3 |
1.467.400,00 |
1.496.747,97 |
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
1.965.215,96 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.186.975,96 |
| 2020 | 24.1.4.29 | Beton mutu f'c 21,7 Mpa (K-250), slump (12±2) cm. w/c=0,56, Ready Mix dan Pompa Beton | M3 | 2.186.975,96 | Tidak Dipakai | |
1147 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.30 |
Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
406 |
Kg |
2.600,00 |
1.055.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4886 |
M3 |
180.100,00 |
87.996,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.76 |
M3 |
280.200,00 |
212.952,00 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.364.288,85 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.702.656,95 |
| 2020 | 24.1.4.30 | Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, manual | M3 | 1.702.656,95 | Tidak Dipakai | |
1148 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.31 |
Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
406 |
Kg |
2.600,00 |
1.055.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4886 |
M3 |
180.100,00 |
87.996,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.76 |
M3 |
280.200,00 |
212.952,00 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.364.288,85 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
2.028.480,15 |
| 2020 | 24.1.4.31 | Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, dengan Molen | M3 | 2.028.480,15 | Tidak Dipakai | |
1149 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.32 |
Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.20 |
Beton Cor K 275 |
1.02 |
M3 |
1.500.800,00 |
1.530.815,97 |
|
|
|
|
Jumlah |
1.530.815,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.752.575,97 |
| 2020 | 24.1.4.32 | Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, Ready Mix | M3 | 1.752.575,97 | Tidak Dipakai | |
1150 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.33 |
Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.20 |
Beton Cor K 275 |
1.02 |
M3 |
1.500.800,00 |
1.530.815,97 |
|
|
|
|
Jumlah |
1.530.815,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.221.043,96 |
| 2020 | 24.1.4.33 | Beton mutu f'c 24,0 Mpa (K-275), slump (12±2) cm. w/c=0,53, Ready Mix dan Pompa Beton | M3 | 2.221.043,96 | Tidak Dipakai | |
1151 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.34 |
Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
413 |
Kg |
2.600,00 |
1.073.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4864 |
M3 |
180.100,00 |
87.600,64 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7563 |
M3 |
280.200,00 |
211.915,25 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.381.055,89 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.719.423,99 |
| 2020 | 24.1.4.34 | Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, manual | M3 | 1.719.423,99 | Tidak Dipakai | |
1152 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.35 |
Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
413 |
Kg |
2.600,00 |
1.073.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4864 |
M3 |
180.100,00 |
87.600,64 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7565 |
M3 |
280.200,00 |
211.971,30 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.381.111,94 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
2.045.303,24 |
| 2020 | 24.1.4.35 | Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, dengan Molen | M3 | 2.045.303,24 | Tidak Dipakai | |
1153 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.36 |
Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.21 |
Beton Cor K 300 |
1.02 |
M3 |
1.534.100,00 |
1.564.781,97 |
|
|
|
|
Jumlah |
1.564.781,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.786.541,97 |
| 2020 | 24.1.4.36 | Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, Ready Mix | M3 | 1.786.541,97 | Tidak Dipakai | |
1154 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.37 |
Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
1.02 |
Kg |
2.600,00 |
2.652,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0 |
M3 |
180.100,00 |
0,00 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0 |
M3 |
280.200,00 |
0,00 |
132.3.2.13.1.96 |
Air Kerja |
0 |
liter |
36,00 |
0,00 |
|
|
|
|
Jumlah |
2.652,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
692.879,99 |
| 2020 | 24.1.4.37 | Beton mutu f'c 26,4 Mpa (K-300), slump (12±2) cm. w/c=0,52, Ready Mix dan Pompa Beton | M3 | 692.879,99 | Tidak Dipakai | |
1155 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.38 |
Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.21 |
OH |
206.800,00 |
43.428,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.1 |
OH |
150.800,00 |
316.679,99 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
430.499,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
439 |
Kg |
2.600,00 |
1.141.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4786 |
M3 |
180.100,00 |
86.195,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7452 |
M3 |
280.200,00 |
208.805,03 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.444.140,89 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.874.640,88 |
| 2020 | 24.1.4.38 | Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, manual | M3 | 1.874.640,88 | Tidak Dipakai | |
1156 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.39 |
Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49 dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.024 |
OH |
236.200,00 |
5.668,80 |
123.1.1.1.1.6 |
Mandor |
0.168 |
OH |
206.800,00 |
34.742,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.68 |
OH |
150.800,00 |
253.343,99 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
336.355,19 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
439 |
Kg |
2.600,00 |
1.141.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4786 |
M3 |
180.100,00 |
86.195,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7452 |
M3 |
280.200,00 |
208.805,03 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.444.140,89 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
2.179.846,08 |
| 2020 | 24.1.4.39 | Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49 dengan Molen | M3 | 2.179.846,08 | Tidak Dipakai | |
1157 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.40 |
Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.22 |
Beton Cor K 325 |
1.02 |
M3 |
1.554.200,00 |
1.585.283,97 |
|
|
|
|
Jumlah |
1.585.283,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.807.043,97 |
| 2020 | 24.1.4.40 | Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, Ready Mix | M3 | 1.807.043,97 | Tidak Dipakai | |
1158 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.41 |
Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.22 |
Beton Cor K 325 |
1.02 |
M3 |
1.554.200,00 |
1.585.283,97 |
|
|
|
|
Jumlah |
1.585.283,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.275.511,96 |
| 2020 | 24.1.4.41 | Beton mutu f'c 28,8 Mpa (K-325), slump (12±2) cm. w/c=0,49, Ready Mix dan Pompa Beton | M3 | 2.275.511,96 | Tidak Dipakai | |
1159 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.42 |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.035 |
OH |
236.200,00 |
8.267,00 |
123.1.1.1.1.6 |
Mandor |
0.21 |
OH |
206.800,00 |
43.428,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.1 |
OH |
150.800,00 |
316.679,99 |
123.1.1.1.1.23 |
Tukang |
0.35 |
OH |
177.500,00 |
62.125,00 |
|
|
|
|
Jumlah |
430.499,98 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
448 |
Kg |
2.600,00 |
1.164.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4764 |
M3 |
180.100,00 |
85.799,64 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7407 |
M3 |
280.200,00 |
207.544,14 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.465.883,78 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.896.383,76 |
| 2020 | 24.1.4.42 | Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, manual | M3 | 1.896.383,76 | Tidak Dipakai | |
1160 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.43 |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.024 |
OH |
236.200,00 |
5.668,80 |
123.1.1.1.1.6 |
Mandor |
0.168 |
OH |
206.800,00 |
34.742,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.68 |
OH |
150.800,00 |
253.343,99 |
123.1.1.1.1.23 |
Tukang |
0.24 |
OH |
177.500,00 |
42.600,00 |
|
|
|
|
Jumlah |
336.355,19 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
448 |
Kg |
2.600,00 |
1.164.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4764 |
M3 |
180.100,00 |
85.799,64 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7407 |
M3 |
280.200,00 |
207.544,14 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.465.883,78 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
2.201.588,97 |
| 2020 | 24.1.4.43 | Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen | M3 | 2.201.588,97 | Tidak Dipakai | |