1121 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.4 |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.13 |
Beton Cor K 100 |
1.02 |
M3 |
1.327.400,00 |
1.353.947,97 |
|
|
|
|
Jumlah |
1.353.947,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.675.358,47 |
| 2020 | 24.1.4.4 | Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Ready Mix | M3 | 1.675.358,47 | Tidak Dipakai | |
1122 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.5 |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.13 |
Beton Cor K 100 |
1.02 |
M3 |
1.327.400,00 |
1.353.947,97 |
|
|
|
|
Jumlah |
1.353.947,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.143.826,46 |
| 2020 | 24.1.4.5 | Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Ready Mix dan Pompa Beton | M3 | 2.143.826,46 | Tidak Dipakai | |
1123 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.6 |
Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
276 |
Kg |
2.600,00 |
717.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5914 |
M3 |
180.100,00 |
106.511,14 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7496 |
M3 |
280.200,00 |
210.037,92 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.041.889,06 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.380.257,16 |
| 2020 | 24.1.4.6 | Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, manual | M3 | 1.380.257,16 | Tidak Dipakai | |
1124 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.7 |
Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
276 |
Kg |
2.600,00 |
717.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5914 |
M3 |
180.100,00 |
106.511,14 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7496 |
M3 |
280.200,00 |
210.037,92 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.041.889,06 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.706.080,36 |
| 2020 | 24.1.4.7 | Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, dengan Molen | M3 | 1.706.080,36 | Tidak Dipakai | |
1125 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.8 |
Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.14 |
Beton Cor K 125 |
1.02 |
M3 |
1.340.700,00 |
1.367.513,97 |
|
|
|
|
Jumlah |
1.367.513,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.688.924,47 |
| 2020 | 24.1.4.8 | Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, Ready Mix | M3 | 1.688.924,47 | Tidak Dipakai | |
1126 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.9 |
Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.14 |
Beton Cor K 125 |
1.02 |
M3 |
1.340.700,00 |
1.367.513,97 |
|
|
|
|
Jumlah |
1.367.513,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.157.392,46 |
| 2020 | 24.1.4.9 | Beton mutu f'c 9,8 Mpa (K-125), slump (12±2) cm. w/c=0,78, Ready Mix dan Pompa Beton | M3 | 2.157.392,46 | Tidak Dipakai | |
1127 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.10 |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
299 |
Kg |
2.600,00 |
777.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5707 |
M3 |
180.100,00 |
102.783,07 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7533 |
M3 |
280.200,00 |
211.074,66 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.098.997,73 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.437.365,83 |
| 2020 | 24.1.4.10 | Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, manual | M3 | 1.437.365,83 | Tidak Dipakai | |
1128 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.11 |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
299 |
Kg |
2.600,00 |
777.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5707 |
M3 |
180.100,00 |
102.783,07 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7533 |
M3 |
280.200,00 |
211.074,66 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.098.997,73 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.763.189,02 |
| 2020 | 24.1.4.11 | Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, dengan Molen | M3 | 1.763.189,02 | Tidak Dipakai | |
1129 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.12 |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.15 |
Beton Cor K 150 |
1.02 |
M3 |
1.354.100,00 |
1.381.181,97 |
|
|
|
|
Jumlah |
1.381.181,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.602.941,97 |
| 2020 | 24.1.4.12 | Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, Ready Mix | M3 | 1.602.941,97 | Tidak Dipakai | |
1130 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.13 |
Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, Ready Mix dan Pompa Beton |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.15 |
Beton Cor K 150 |
1.02 |
M3 |
1.354.100,00 |
1.381.181,97 |
|
|
|
|
Jumlah |
1.381.181,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.071.409,96 |
| 2020 | 24.1.4.13 | Beton mutu f'c 12,2 Mpa (K-150), slump (12±2) cm. w/c=0,72, Ready Mix dan Pompa Beton | M3 | 2.071.409,96 | Tidak Dipakai | |
1131 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.14 |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
326 |
Kg |
2.600,00 |
847.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5429 |
M3 |
180.100,00 |
97.776,29 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7622 |
M3 |
280.200,00 |
213.568,44 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.166.684,73 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.505.052,83 |
| 2020 | 24.1.4.14 | Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, manual | M3 | 1.505.052,83 | Tidak Dipakai | |
1132 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.15 |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
326 |
Kg |
2.600,00 |
847.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5429 |
M3 |
180.100,00 |
97.776,29 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7622 |
M3 |
280.200,00 |
213.568,44 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.166.684,73 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.830.876,03 |
| 2020 | 24.1.4.15 | Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, dengan Molen | M3 | 1.830.876,03 | Tidak Dipakai | |
1133 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.16 |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
1.02 |
M3 |
1.374.100,00 |
1.401.581,97 |
|
|
|
|
Jumlah |
1.401.581,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.623.341,97 |
| 2020 | 24.1.4.16 | Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix | M3 | 1.623.341,97 | Tidak Dipakai | |
1134 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.17 |
Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix dan Pompa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.16 |
Beton Cor K 175 |
1.02 |
M3 |
1.374.100,00 |
1.401.581,97 |
|
|
|
|
Jumlah |
1.401.581,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.191.460,46 |
| 2020 | 24.1.4.17 | Beton mutu f'c 14,5 Mpa (K-175), slump (12±2) cm. w/c=0,66, Ready Mix dan Pompa | M3 | 2.191.460,46 | Tidak Dipakai | |
1135 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.18 |
Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
338.368,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
352 |
Kg |
2.600,00 |
915.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5221 |
M3 |
180.100,00 |
94.030,20 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7637 |
M3 |
280.200,00 |
213.988,74 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.230.958,95 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.569.327,05 |
| 2020 | 24.1.4.18 | Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, manual | M3 | 1.569.327,05 | Tidak Dipakai | |
1136 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.19 |
Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
352 |
Kg |
2.600,00 |
915.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.5221 |
M3 |
180.100,00 |
94.030,20 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7673 |
M3 |
280.200,00 |
214.997,46 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.231.967,67 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.896.158,96 |
| 2020 | 24.1.4.19 | Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, dengan Molen | M3 | 1.896.158,96 | Tidak Dipakai | |
1137 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.20 |
Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, Ready Mix |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.17 |
Beton Cor K 200 |
1.02 |
M3 |
1.400.700,00 |
1.428.713,97 |
|
|
|
|
Jumlah |
1.428.713,97 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.650.473,97 |
| 2020 | 24.1.4.20 | Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, Ready Mix | M3 | 1.650.473,97 | Tidak Dipakai | |
1138 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.21 |
Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, Ready Mix dan Pompa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.1 |
OH |
206.800,00 |
20.680,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
221.760,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.17 |
Beton Cor K 200 |
1.02 |
M3 |
1.400.700,00 |
1.428.713,97 |
|
|
|
|
Jumlah |
1.428.713,97 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.17 |
Concrete Pump |
0.84 |
jam |
557.700,00 |
468.467,99 |
|
|
|
|
Jumlah |
468.467,99 |
|
|
|
|
Nilai HSPK |
2.118.941,96 |
| 2020 | 24.1.4.21 | Beton mutu f'c 16,9 Mpa (K-200), slump (12±2) cm. w/c=0,61, Ready Mix dan Pompa | M3 | 2.118.941,96 | Tidak Dipakai | |
1139 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.22 |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.165 |
OH |
206.800,00 |
34.122,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.165 |
OH |
150.800,00 |
24.882,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
114.430,10 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
371 |
Kg |
2.600,00 |
964.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4986 |
M3 |
180.100,00 |
89.797,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7756 |
M3 |
280.200,00 |
217.323,12 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.279.460,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.393.891,09 |
| 2020 | 24.1.4.22 | Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, manual | M3 | 1.393.891,09 | Tidak Dipakai | |
1140 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.23 |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.019 |
OH |
236.200,00 |
4.487,80 |
123.1.1.1.1.6 |
Mandor |
0.132 |
OH |
206.800,00 |
27.297,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.323 |
OH |
150.800,00 |
199.508,39 |
123.1.1.1.1.23 |
Tukang |
0.189 |
OH |
177.500,00 |
33.547,50 |
|
|
|
|
Jumlah |
264.841,29 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
371 |
Kg |
2.600,00 |
964.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.4986 |
M3 |
180.100,00 |
89.797,86 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7756 |
M3 |
280.200,00 |
217.323,12 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
1.279.460,99 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.943.652,28 |