1101 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.11 |
Pekerjaan Pemasangan Batu Kali (1 PC : 3 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.075 |
OH |
236.200,00 |
17.715,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.75 |
OH |
177.500,00 |
133.125,00 |
|
|
|
|
Jumlah |
392.550,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
202 |
Kg |
2.600,00 |
525.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.485 |
M3 |
180.100,00 |
87.348,50 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
1.092.788,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.485.338,52 |
| 2020 | 24.1.3.11 | Pekerjaan Pemasangan Batu Kali (1 PC : 3 Ps) | M3 | 1.485.338,52 | Tidak Dipakai | |
1102 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.12 |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.075 |
OH |
236.200,00 |
17.715,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.75 |
OH |
177.500,00 |
133.125,00 |
|
|
|
|
Jumlah |
392.550,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
163 |
Kg |
2.600,00 |
423.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.52 |
M3 |
180.100,00 |
93.652,00 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
997.692,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.390.242,02 |
| 2020 | 24.1.3.12 | Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) | M3 | 1.390.242,02 | Tidak Dipakai | |
1103 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.13 |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.075 |
OH |
236.200,00 |
17.715,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.75 |
OH |
177.500,00 |
133.125,00 |
|
|
|
|
Jumlah |
392.550,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
136 |
Kg |
2.600,00 |
353.600,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.544 |
M3 |
180.100,00 |
97.974,41 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
931.814,42 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.324.364,43 |
| 2020 | 24.1.3.13 | Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) | M3 | 1.324.364,43 | Tidak Dipakai | |
1104 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.14 |
Pekerjaan Pemasangan Batu Kali (1 Pc : 6 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
362.382,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
117 |
Kg |
2.600,00 |
304.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.56 |
M3 |
180.100,00 |
100.856,00 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
885.296,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.247.678,02 |
| 2020 | 24.1.3.14 | Pekerjaan Pemasangan Batu Kali (1 Pc : 6 Ps) | M3 | 1.247.678,02 | Tidak Dipakai | |
1105 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.15 |
Pemasangan Batu Kali Kosongan (aanstamping) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.039 |
OH |
236.200,00 |
9.211,80 |
123.1.1.1.1.6 |
Mandor |
0.039 |
OH |
206.800,00 |
8.065,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.78 |
OH |
150.800,00 |
117.624,00 |
123.1.1.1.1.23 |
Tukang |
0.39 |
OH |
177.500,00 |
69.225,00 |
|
|
|
|
Jumlah |
204.125,99 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.6 |
Pasir Urug |
0.432 |
M3 |
353.600,00 |
152.755,20 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
632.995,22 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
837.121,22 |
| 2020 | 24.1.3.15 | Pemasangan Batu Kali Kosongan (aanstamping) | M3 | 837.121,22 | Tidak Dipakai | |
1106 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.16 |
Pemasangan Pondasi Sumuran diameter 100 cm |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.08 |
OH |
236.200,00 |
18.896,00 |
123.1.1.1.1.6 |
Mandor |
0.119 |
OH |
206.800,00 |
24.609,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2.4 |
OH |
150.800,00 |
361.920,01 |
123.1.1.1.1.23 |
Tukang |
0.8 |
OH |
177.500,00 |
142.000,00 |
|
|
|
|
Jumlah |
547.425,22 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
194 |
Kg |
2.600,00 |
504.400,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.312 |
M3 |
180.100,00 |
56.191,20 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.468 |
M3 |
280.200,00 |
131.133,60 |
117.1.1.1.5.86 |
Batu Kali |
0.45 |
M3 |
400.200,00 |
180.090,00 |
|
|
|
|
Jumlah |
871.814,79 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.419.240,01 |
| 2020 | 24.1.3.16 | Pemasangan Pondasi Sumuran diameter 100 cm | M3 | 1.419.240,01 | Tidak Dipakai | |
1107 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.17 |
Pasangan Batu Kali Campuran (1Pc : 1Kp : 2Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.075 |
OH |
236.200,00 |
17.715,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.75 |
OH |
177.500,00 |
133.125,00 |
|
|
|
|
Jumlah |
392.550,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.42 |
Kapur Pasang |
0 |
Karung |
85.400,00 |
0,00 |
117.1.1.1.2.54 |
Semen PC / Kg |
0.17 |
Kg |
2.600,00 |
442,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.34 |
M3 |
180.100,00 |
61.234,00 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
541.916,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
934.466,02 |
| 2020 | 24.1.3.17 | Pasangan Batu Kali Campuran (1Pc : 1Kp : 2Ps) | M3 | 934.466,02 | Tidak Dipakai | |
1108 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.18 |
Perbaikan dan Pemadatan Talud |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.021 |
OH |
206.800,00 |
4.342,80 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.254 |
OH |
150.800,00 |
38.303,20 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
42.646,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.088 |
jam |
513.600,00 |
45.196,80 |
123.2.2.1.2.39 |
Motor Grader |
0.008 |
jam |
1.115.300,00 |
8.922,40 |
123.2.2.1.2.59 |
Vibro Roller |
0.012 |
jam |
617.700,00 |
7.412,40 |
|
|
|
|
Jumlah |
61.531,60 |
|
|
|
|
Nilai HSPK |
104.177,60 |
| 2020 | 24.1.3.18 | Perbaikan dan Pemadatan Talud | M3 | 104.177,60 | Tidak Dipakai | |
1109 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.19 |
Perkuatan Talud Pasangan Batu Kali Belah 15/20 cm (1 pc : 1/4 kpr : 5) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
362.382,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.5266 |
M3 |
180.100,00 |
94.840,66 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
575.080,68 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.1 |
Alat Bantu |
0.5 |
LS |
1.400,00 |
700,00 |
|
|
|
|
Jumlah |
700,00 |
|
|
|
|
Nilai HSPK |
938.162,68 |
| 2020 | 24.1.3.19 | Perkuatan Talud Pasangan Batu Kali Belah 15/20 cm (1 pc : 1/4 kpr : 5) | M3 | 938.162,68 | Tidak Dipakai | |
1110 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.20 |
Perkuatan Talud dengan Pasangan Batu Kali 15/20 cm (1 pc : 1 kpr : 2 ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.06 |
OH |
236.200,00 |
14.172,00 |
123.1.1.1.1.6 |
Mandor |
0.075 |
OH |
206.800,00 |
15.510,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0.6 |
OH |
177.500,00 |
106.500,00 |
|
|
|
|
Jumlah |
362.382,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.42 |
Kapur Pasang |
0.1692 |
Karung |
85.400,00 |
14.449,68 |
117.1.1.1.4.4 |
Pasir Pasang |
0.3384 |
M3 |
180.100,00 |
60.945,84 |
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
555.635,54 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
0.65 |
jam |
228.200,00 |
148.329,99 |
|
|
|
|
Jumlah |
148.329,99 |
|
|
|
|
Nilai HSPK |
1.066.347,54 |
| 2020 | 24.1.3.20 | Perkuatan Talud dengan Pasangan Batu Kali 15/20 cm (1 pc : 1 kpr : 2 ps) | M3 | 1.066.347,54 | Tidak Dipakai | |
1111 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.21 |
Pemasangan Batu Kali Kosongan tebal 20 cm |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.015 |
OH |
236.200,00 |
3.543,00 |
123.1.1.1.1.6 |
Mandor |
0.017 |
OH |
206.800,00 |
3.515,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.35 |
OH |
150.800,00 |
52.780,00 |
123.1.1.1.1.23 |
Tukang |
0.15 |
OH |
177.500,00 |
26.625,00 |
|
|
|
|
Jumlah |
86.463,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
480.240,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
566.703,62 |
| 2020 | 24.1.3.21 | Pemasangan Batu Kali Kosongan tebal 20 cm | M3 | 566.703,62 | Tidak Dipakai | |
1112 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.22 |
Pemasangan Batu Kali Belah Kosongan tebal 15 cm |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.0188 |
OH |
236.200,00 |
4.440,56 |
123.1.1.1.1.6 |
Mandor |
0.0213 |
OH |
206.800,00 |
4.404,84 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4375 |
OH |
150.800,00 |
65.975,00 |
123.1.1.1.1.23 |
Tukang |
0.1875 |
OH |
177.500,00 |
33.281,25 |
|
|
|
|
Jumlah |
108.101,65 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.5.86 |
Batu Kali |
1.2 |
M3 |
400.200,00 |
480.240,02 |
|
|
|
|
Jumlah |
480.240,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
588.341,67 |
| 2020 | 24.1.3.22 | Pemasangan Batu Kali Belah Kosongan tebal 15 cm | M3 | 588.341,67 | Tidak Dipakai | |
1113 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.23 |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.06 |
OH |
206.800,00 |
12.408,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
193.368,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.7 |
Alat Bantu Strous Pile |
1.2 |
jam |
14,20 |
17,04 |
|
|
|
|
Jumlah |
17,04 |
|
|
|
|
Nilai HSPK |
193.385,05 |
| 2020 | 24.1.3.23 | Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m | titik | 193.385,05 | Tidak Dipakai | |
1114 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.24 |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
|
titik |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.072 |
OH |
206.800,00 |
14.889,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.44 |
OH |
150.800,00 |
217.152,01 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
232.041,61 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.3.7 |
Alat Bantu Strous Pile |
1.2 |
jam |
14,20 |
17,04 |
|
|
|
|
Jumlah |
17,04 |
|
|
|
|
Nilai HSPK |
232.058,65 |
| 2020 | 24.1.3.24 | Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m | titik | 232.058,65 | Tidak Dipakai | |
1115 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.25 |
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.025 |
OH |
236.200,00 |
5.905,00 |
123.1.1.1.1.6 |
Mandor |
0.08 |
OH |
206.800,00 |
16.544,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.25 |
OH |
177.500,00 |
44.375,00 |
|
|
|
|
Jumlah |
315.644,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.4 |
Pasir Pasang |
0.4882 |
M3 |
180.100,00 |
87.924,82 |
117.1.1.1.5.55 |
Kerikil Beton Guli (2-3 cm) |
0.8137 |
M3 |
800.400,00 |
651.285,50 |
|
|
|
|
Jumlah |
739.210,32 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.054.854,31 |
| 2020 | 24.1.3.25 | Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) | M3 | 1.054.854,31 | Tidak Dipakai | |
1116 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.26 |
Pemancangan Tiang Pancang m1 (≥ 200mm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0 |
OH |
206.800,00 |
0,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0 |
OH |
150.800,00 |
0,00 |
123.1.1.1.1.23 |
Tukang |
0.125 |
OH |
177.500,00 |
22.187,50 |
|
|
|
|
Jumlah |
22.187,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.324 |
Tiang Pancang Mini Pile |
1 |
batang |
199.600,00 |
199.600,00 |
|
|
|
|
Jumlah |
199.600,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.20 |
Crane 20 Ton |
0.218 |
jam |
146.800,00 |
32.002,40 |
123.2.2.1.2.31 |
Hammer Tiang Pancang Min. 8 Jam (Termasuk Mob/Demob Operator Bbm) |
0.218 |
jam |
197.500,00 |
43.055,00 |
|
|
|
|
Jumlah |
75.057,40 |
|
|
|
|
Nilai HSPK |
296.844,90 |
| 2020 | 24.1.3.26 | Pemancangan Tiang Pancang m1 (≥ 200mm) | M1 | 296.844,90 | Tidak Dipakai | |
1117 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.3.27 |
Pemancangan Batu Acak atau Batu Alam |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.015 |
OH |
206.800,00 |
3.102,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.15 |
OH |
150.800,00 |
22.620,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
25.722,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.5.80 |
Batu Alam Candi Rata Mesin |
10.67 |
M2 |
200.100,00 |
2.135.067,02 |
|
|
|
|
Jumlah |
2.135.067,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.160.789,02 |
| 2020 | 24.1.3.27 | Pemancangan Batu Acak atau Batu Alam | M2 | 2.160.789,02 | Tidak Dipakai | |
1118 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.1 |
Beton untuk Lantai Kerja |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.06 |
OH |
206.800,00 |
12.408,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
233.592,01 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
0 |
Kg |
2.600,00 |
0,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.6379 |
M3 |
180.100,00 |
114.885,79 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.7607 |
M3 |
280.200,00 |
213.148,14 |
132.3.2.13.1.96 |
Air Kerja |
200 |
liter |
36,00 |
7.200,00 |
|
|
|
|
Jumlah |
335.233,93 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
568.825,93 |
| 2020 | 24.1.4.1 | Beton untuk Lantai Kerja | M3 | 568.825,93 | Tidak Dipakai | |
1119 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.2 |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Manual |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
247 |
Kg |
2.600,00 |
642.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.6207 |
M3 |
180.100,00 |
111.788,07 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.74 |
M3 |
280.200,00 |
207.348,00 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
969.076,07 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.290.486,57 |
| 2020 | 24.1.4.2 | Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, Manual | M3 | 1.290.486,57 | Tidak Dipakai | |
1120 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.4.3 |
Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.028 |
OH |
236.200,00 |
6.613,60 |
123.1.1.1.1.6 |
Mandor |
0.083 |
OH |
206.800,00 |
17.164,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.65 |
OH |
150.800,00 |
248.820,00 |
123.1.1.1.1.23 |
Tukang |
0.275 |
OH |
177.500,00 |
48.812,50 |
|
|
|
|
Jumlah |
321.410,50 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
247 |
Kg |
2.600,00 |
642.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.6207 |
M3 |
180.100,00 |
111.788,07 |
117.1.1.1.5.38 |
Batu kerikil bersih (kerikil klas A Cor) |
0.74 |
M3 |
280.200,00 |
207.348,00 |
132.3.2.13.1.96 |
Air Kerja |
215 |
liter |
36,00 |
7.740,00 |
|
|
|
|
Jumlah |
969.076,07 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.14 |
Concrete Mixer |
1.75 |
jam |
228.200,00 |
399.350,00 |
|
|
|
|
Jumlah |
399.350,00 |
|
|
|
|
Nilai HSPK |
1.689.836,57 |
| 2020 | 24.1.4.3 | Beton mutu f'c 7,4 Mpa (K-100), slump (12±2) cm. w/c=0,87, dengan Molen | M3 | 1.689.836,57 | Tidak Dipakai | |