1061 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.8 |
Pembersihan Lapangan "Berat" dan Perataan |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
25.420,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
25.420,00 |
| 2020 | 24.1.1.8 | Pembersihan Lapangan "Berat" dan Perataan | M2 | 25.420,00 | Tidak Dipakai | |
1062 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.9 |
Uitzet Dengan WaterPass / Theodolit |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.3 |
Juru Ukur |
0.0067 |
OH |
236.200,00 |
1.582,54 |
123.1.1.1.1.4 |
Juru Ukur Pembantu |
0.0133 |
OH |
177.500,00 |
2.360,75 |
|
|
|
|
Jumlah |
3.943,29 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.52 |
Theodolit/Waterpass |
0.0067 |
Hari |
751.100,00 |
5.032,37 |
|
|
|
|
Jumlah |
5.032,37 |
|
|
|
|
Nilai HSPK |
8.975,66 |
| 2020 | 24.1.1.9 | Uitzet Dengan WaterPass / Theodolit | M2 | 8.975,66 | Tidak Dipakai | |
1063 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.10 |
Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
16.114,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
16.114,00 |
| 2020 | 24.1.1.10 | Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali | M2 | 16.114,00 | Tidak Dipakai | |
1064 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.11 |
Pembongkaran Rangka Atap dan Penutup Dipakai Kembali |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
32.228,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
32.228,00 |
| 2020 | 24.1.1.11 | Pembongkaran Rangka Atap dan Penutup Dipakai Kembali | M2 | 32.228,00 | Tidak Dipakai | |
1065 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.12 |
Pekerjaan Pembongkaran Beton / Beton Bertulang |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.2 |
OH |
206.800,00 |
41.360,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
4 |
OH |
150.800,00 |
603.200,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
644.560,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
644.560,00 |
| 2020 | 24.1.1.12 | Pekerjaan Pembongkaran Beton / Beton Bertulang | M3 | 644.560,00 | Tidak Dipakai | |
1066 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.13 |
Pekerjaan Pembongkaran Dinding Tembok Bata |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.333 |
OH |
206.800,00 |
68.864,40 |
123.1.1.1.1.14 |
Pekerja Terlatih |
6.667 |
OH |
150.800,00 |
1.005.383,57 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
1.074.247,97 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.074.247,97 |
| 2020 | 24.1.1.13 | Pekerjaan Pembongkaran Dinding Tembok Bata | M3 | 1.074.247,97 | Tidak Dipakai | |
1067 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.14 |
Pemasangan Pagar Kawat Jaring Galvanis |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.002 |
OH |
236.200,00 |
472,40 |
123.1.1.1.1.6 |
Mandor |
0.042 |
OH |
206.800,00 |
8.685,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.042 |
OH |
150.800,00 |
6.333,60 |
123.1.1.1.1.23 |
Tukang |
0.004 |
OH |
177.500,00 |
710,00 |
|
|
|
|
Jumlah |
16.201,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.200 |
Kawat Jaringan Galvanis (Harmonika) |
0.1434 |
lembar |
242.800,00 |
34.817,52 |
|
|
|
|
Jumlah |
34.817,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
51.019,12 |
| 2020 | 24.1.1.14 | Pemasangan Pagar Kawat Jaring Galvanis | M2 | 51.019,12 | Tidak Dipakai | |
1068 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.15 |
Pemasangan Panel Beton Pra Cetak 40x50x25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.012 |
OH |
236.200,00 |
2.834,40 |
123.1.1.1.1.6 |
Mandor |
0.019 |
OH |
206.800,00 |
3.929,20 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.37 |
OH |
150.800,00 |
55.796,00 |
123.1.1.1.1.23 |
Tukang |
0.12 |
OH |
177.500,00 |
21.300,00 |
|
|
|
|
Jumlah |
83.859,60 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.27 |
Beton panel Pra Cetak |
0.98 |
M3 |
213.500,00 |
209.230,00 |
117.1.1.1.2.34 |
Beton Tiang Pra Cetak |
0.52 |
batang |
400.200,00 |
208.103,99 |
117.1.1.1.2.54 |
Semen PC / Kg |
45 |
Kg |
2.600,00 |
117.000,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.07 |
M3 |
180.100,00 |
12.607,00 |
117.1.1.1.5.88 |
Batu Koral |
0.14 |
M3 |
400.200,00 |
56.028,00 |
|
|
|
|
Jumlah |
602.969,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
686.828,60 |
| 2020 | 24.1.1.15 | Pemasangan Panel Beton Pra Cetak 40x50x25 cm | M2 | 686.828,60 | Tidak Dipakai | |
1069 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.1 |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.75 |
OH |
150.800,00 |
113.100,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
118.270,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
118.270,00 |
| 2020 | 24.1.2.1 | Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi | M3 | 118.270,00 | Tidak Dipakai | |
1070 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.2 |
Penggalian Tanah Biasa sedalam s.d. 2 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.045 |
OH |
206.800,00 |
9.306,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.9 |
OH |
150.800,00 |
135.720,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
145.026,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
145.026,00 |
| 2020 | 24.1.2.2 | Penggalian Tanah Biasa sedalam s.d. 2 m untuk Konstruksi | M3 | 145.026,00 | Tidak Dipakai | |
1071 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.3 |
Penggalian Tanah Keras sedalam s.d. 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.032 |
OH |
206.800,00 |
6.617,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
157.417,60 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
157.417,60 |
| 2020 | 24.1.2.3 | Penggalian Tanah Keras sedalam s.d. 1 m | M3 | 157.417,60 | Tidak Dipakai | |
1072 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.4 |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.06 |
OH |
206.800,00 |
12.408,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.5 |
OH |
150.800,00 |
226.200,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
238.608,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
238.608,00 |
| 2020 | 24.1.2.4 | Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m | M3 | 238.608,00 | Tidak Dipakai | |
1073 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.5 |
Penggalian Tanah Lumpur |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.045 |
OH |
206.800,00 |
9.306,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1.2 |
OH |
150.800,00 |
180.960,01 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
190.266,01 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
190.266,01 |
| 2020 | 24.1.2.5 | Penggalian Tanah Lumpur | M3 | 190.266,01 | Tidak Dipakai | |
1074 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.6 |
Penggalian Lumpur dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.226 |
OH |
150.800,00 |
34.080,80 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
35.528,40 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.074 |
jam |
513.600,00 |
38.006,40 |
123.2.2.1.2.27 |
Excavator |
0.0528 |
jam |
1.063.200,00 |
56.136,96 |
|
|
|
|
Jumlah |
94.143,36 |
|
|
|
|
Nilai HSPK |
129.671,76 |
| 2020 | 24.1.2.6 | Penggalian Lumpur dengan Alat Berat | M3 | 129.671,76 | Tidak Dipakai | |
1075 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.7 |
Penggalian Tanah dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.007 |
OH |
206.800,00 |
1.447,60 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.226 |
OH |
150.800,00 |
34.080,80 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
35.528,40 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.24 |
Dump Truck |
0.067 |
jam |
513.600,00 |
34.411,20 |
123.2.2.1.2.28 |
Excavator 6 M3 |
0.067 |
jam |
584.300,00 |
39.148,10 |
|
|
|
|
Jumlah |
73.559,30 |
|
|
|
|
Nilai HSPK |
109.087,70 |
| 2020 | 24.1.2.7 | Penggalian Tanah dengan Alat Berat | M3 | 109.087,70 | Tidak Dipakai | |
1076 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.8 |
Pengerjaan striping tanah tebing setinggi 1 meter |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
8.574,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
8.574,00 |
| 2020 | 24.1.2.8 | Pengerjaan striping tanah tebing setinggi 1 meter | M3 | 8.574,00 | Tidak Dipakai | |
1077 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.9 |
Penimbunan kembali Tanah Galian |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.5 |
OH |
150.800,00 |
75.400,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
85.740,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
85.740,00 |
| 2020 | 24.1.2.9 | Penimbunan kembali Tanah Galian | M3 | 85.740,00 | Tidak Dipakai | |
1078 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.10 |
Penimbunan dengan Tanah urug |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
47.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.16 |
Tanah Urug |
1.2 |
M3 |
230.800,00 |
276.960,01 |
|
|
|
|
Jumlah |
276.960,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
324.268,01 |
| 2020 | 24.1.2.10 | Penimbunan dengan Tanah urug | M3 | 324.268,01 | Tidak Dipakai | |
1079 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.11 |
Penimbunan dengan Pasir urug |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
47.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.6 |
Pasir Urug |
1.2 |
M3 |
353.600,00 |
424.320,02 |
|
|
|
|
Jumlah |
424.320,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
471.628,02 |
| 2020 | 24.1.2.11 | Penimbunan dengan Pasir urug | M3 | 471.628,02 | Tidak Dipakai | |
1080 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.12 |
Penimbunan tanah dan pemadatan menggunakan Alat Ringan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.01 |
OH |
206.800,00 |
2.068,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.3 |
OH |
150.800,00 |
45.240,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
47.308,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.4.16 |
Tanah Urug |
1.2 |
M3 |
230.800,00 |
276.960,01 |
|
|
|
|
Jumlah |
276.960,01 |
|
Sewa Peralatan: |
|
|
|
|
123.2.2.1.2.48 |
Tamper |
0.266 |
jam |
68.100,00 |
18.114,60 |
|
|
|
|
Jumlah |
18.114,60 |
|
|
|
|
Nilai HSPK |
342.382,61 |
| 2020 | 24.1.2.12 | Penimbunan tanah dan pemadatan menggunakan Alat Ringan | M3 | 342.382,61 | Tidak Dipakai | |