1041 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.57 |
Pemasangan Tiang Cabang 1 Biasa 5m |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.57 | Pemasangan Tiang Cabang 1 Biasa 5m | Pad | 0,00 | Tidak Dipakai | |
1042 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.58 |
Pemasangan Tiang Cabang 1 Biasa 7m |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.58 | Pemasangan Tiang Cabang 1 Biasa 7m | Pad | 0,00 | Tidak Dipakai | |
1043 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.59 |
Pemasangan Tiang Cabang 2 Biasa 5m |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.59 | Pemasangan Tiang Cabang 2 Biasa 5m | Pad | 0,00 | Tidak Dipakai | |
1044 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.60 |
Pemasangan Tiang Cabang 2 Biasa 7m |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.60 | Pemasangan Tiang Cabang 2 Biasa 7m | Pad | 0,00 | Tidak Dipakai | |
1045 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.61 |
Pemasangan Tiang Tanam 5 m |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.61 | Pemasangan Tiang Tanam 5 m | Pad | 0,00 | Tidak Dipakai | |
1046 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.62 |
Bongkar Panel Lama |
|
btl |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.62 | Bongkar Panel Lama | btl | 0,00 | Tidak Dipakai | |
1047 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.63 |
Bongkar Instalasi Lama |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.63 | Bongkar Instalasi Lama | lembar | 0,00 | Tidak Dipakai | |
1048 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.64 |
Pembongkaran Ornamen |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.64 | Pembongkaran Ornamen | cup | 0,00 | Tidak Dipakai | |
1049 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.65 |
Pembongkaran Tiang |
|
cup |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.65 | Pembongkaran Tiang | cup | 0,00 | Tidak Dipakai | |
1050 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.66 |
Pindah Panel Lama |
|
Pad |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.66 | Pindah Panel Lama | Pad | 0,00 | Tidak Dipakai | |
1051 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.67 |
Pemasangan Armatur |
|
btl |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.67 | Pemasangan Armatur | btl | 0,00 | Tidak Dipakai | |
1052 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.68 |
Bongkar Armatur |
|
btl |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.68 | Bongkar Armatur | btl | 0,00 | Tidak Dipakai | |
1053 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.3.69 |
Pengecatan dengan Cat Road Line |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.3.69 | Pengecatan dengan Cat Road Line | 10 Pcs | 0,00 | Tidak Dipakai | |
1054 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.1 |
Pembuatan Pagar Sementara dari kayu tinggi 2 m |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
104.680,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
5 |
Kg |
2.600,00 |
13.000,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.005 |
M3 |
180.100,00 |
900,50 |
117.1.1.1.5.88 |
Batu Koral |
0.009 |
M3 |
400.200,00 |
3.601,80 |
117.1.1.1.21.2 |
Minyak Bakar |
0.4 |
Ltr |
14.100,00 |
5.640,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1.25 |
batang |
26.700,00 |
33.375,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.072 |
M3 |
6.403.200,00 |
461.030,38 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
519.629,68 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
624.309,68 |
| 2020 | 24.1.1.1 | Pembuatan Pagar Sementara dari kayu tinggi 2 m | M1 | 624.309,68 | Tidak Dipakai | |
1055 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.2 |
Pembuatan pagar sementara seng gelombang tinggi 2 m |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.4 |
OH |
150.800,00 |
60.320,00 |
123.1.1.1.1.23 |
Tukang |
0.2 |
OH |
177.500,00 |
35.500,00 |
|
|
|
|
Jumlah |
104.680,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
2.5 |
Kg |
2.600,00 |
6.500,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.005 |
M3 |
180.100,00 |
900,50 |
117.1.1.1.5.88 |
Batu Koral |
0.009 |
M3 |
400.200,00 |
3.601,80 |
117.1.1.1.6.18 |
Cat Meni Besi |
0.45 |
Kg |
50.700,00 |
22.815,00 |
117.1.1.1.7.11 |
Seng Gelombang BJLS 020 |
1.2 |
lembar |
96.100,00 |
115.320,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1.25 |
batang |
26.700,00 |
33.375,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.052 |
M3 |
6.403.200,00 |
332.966,41 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
517.560,71 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
622.240,71 |
| 2020 | 24.1.1.2 | Pembuatan pagar sementara seng gelombang tinggi 2 m | M1 | 622.240,71 | Tidak Dipakai | |
1056 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.3 |
Pembuatan pagar sementara kawat duri tinggi 1,8 m |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.02 |
OH |
236.200,00 |
4.724,00 |
123.1.1.1.1.6 |
Mandor |
0.02 |
OH |
206.800,00 |
4.136,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.2 |
OH |
150.800,00 |
30.160,00 |
123.1.1.1.1.23 |
Tukang |
0.3 |
OH |
177.500,00 |
53.250,00 |
|
|
|
|
Jumlah |
92.270,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
2 |
Kg |
2.600,00 |
5.200,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.005 |
M3 |
180.100,00 |
900,50 |
117.1.1.1.5.88 |
Batu Koral |
0.009 |
M3 |
400.200,00 |
3.601,80 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1 |
batang |
26.700,00 |
26.700,00 |
117.1.1.1.22.195 |
Kawat Duri |
25 |
M1 |
24.500,00 |
612.500,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.06 |
Kg |
34.700,00 |
2.082,00 |
|
|
|
|
Jumlah |
650.984,30 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
743.254,30 |
| 2020 | 24.1.1.3 | Pembuatan pagar sementara kawat duri tinggi 1,8 m | M1 | 743.254,30 | Tidak Dipakai | |
1057 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.4 |
Pengukuran dan Pembuatan Bouwplank |
|
M1 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.01 |
OH |
236.200,00 |
2.362,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.1 |
OH |
150.800,00 |
15.080,00 |
123.1.1.1.1.23 |
Tukang |
0.1 |
OH |
177.500,00 |
17.750,00 |
|
|
|
|
Jumlah |
36.226,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.012 |
M3 |
6.403.200,00 |
76.838,40 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.02 |
Kg |
34.700,00 |
694,00 |
|
|
|
|
Jumlah |
77.532,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
113.758,40 |
| 2020 | 24.1.1.4 | Pengukuran dan Pembuatan Bouwplank | M1 | 113.758,40 | Tidak Dipakai | |
1058 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.5 |
Pembuatan kantor sementara lantai plesteran |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.3 |
OH |
236.200,00 |
70.860,00 |
123.1.1.1.1.6 |
Mandor |
0.005 |
OH |
206.800,00 |
1.034,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
2 |
OH |
150.800,00 |
301.600,00 |
123.1.1.1.1.23 |
Tukang |
2 |
OH |
177.500,00 |
355.000,00 |
|
|
|
|
Jumlah |
728.494,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
35 |
Kg |
2.600,00 |
91.000,00 |
117.1.1.1.3.11 |
Kaca Jendela Nako + Rangka |
0.2 |
lembar |
46.700,00 |
9.340,00 |
117.1.1.1.3.17 |
Kaca Ryben 5 mm |
0.08 |
M2 |
205.500,00 |
16.440,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.25 |
M3 |
180.100,00 |
45.025,00 |
117.1.1.1.5.82 |
Batu Bata Besar ( jumbo ) |
30 |
buah |
700,00 |
21.000,00 |
117.1.1.1.5.88 |
Batu Koral |
0.15 |
M3 |
400.200,00 |
60.030,00 |
117.1.1.1.7.3 |
Seng Plat BJLS 20 |
0.25 |
lembar |
181.500,00 |
45.375,00 |
117.1.1.1.7.11 |
Seng Gelombang BJLS 020 |
1.2 |
lembar |
96.100,00 |
115.320,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1.25 |
batang |
26.700,00 |
33.375,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.18 |
M3 |
6.403.200,00 |
1.152.576,05 |
117.1.1.1.22.93 |
Polywood # 4 ukuran 120 x 240 cm |
0.06 |
lembar |
80.100,00 |
4.806,00 |
117.1.1.1.22.225 |
Pagar besi strip |
1.1 |
M2 |
1.667.500,00 |
1.834.250,04 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.08 |
Kg |
34.700,00 |
2.776,00 |
117.1.1.12.1.200 |
Kunci Tanam 4" |
0.15 |
buah |
266.800,00 |
40.020,00 |
|
|
|
|
Jumlah |
3.471.333,09 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
4.199.827,10 |
| 2020 | 24.1.1.5 | Pembuatan kantor sementara lantai plesteran | M2 | 4.199.827,10 | Tidak Dipakai | |
1059 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.6 |
Pembuatan Bedeng Pekerja |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0.2 |
OH |
236.200,00 |
47.240,00 |
123.1.1.1.1.6 |
Mandor |
0.05 |
OH |
206.800,00 |
10.340,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
1 |
OH |
150.800,00 |
150.800,00 |
123.1.1.1.1.28 |
Tukang Kayu |
2 |
OH |
177.500,00 |
355.000,00 |
|
|
|
|
Jumlah |
563.380,00 |
|
Bahan/Material: |
|
|
|
|
117.1.1.1.2.54 |
Semen PC / Kg |
18 |
Kg |
2.600,00 |
46.800,00 |
117.1.1.1.4.4 |
Pasir Pasang |
0.03 |
M3 |
180.100,00 |
5.403,00 |
117.1.1.1.5.88 |
Batu Koral |
0.05 |
M3 |
400.200,00 |
20.010,00 |
117.1.1.1.7.11 |
Seng Gelombang BJLS 020 |
1.5 |
lembar |
96.100,00 |
144.150,00 |
117.1.1.1.22.40 |
Kayu Dolken / Bulat 3"-4" |
1.25 |
batang |
26.700,00 |
33.375,00 |
117.1.1.1.22.87 |
Papan/ Kaso Kayu Kelas III |
0.186 |
M3 |
6.403.200,00 |
1.190.995,23 |
117.1.1.1.22.93 |
Polywood # 4 ukuran 120 x 240 cm |
1.35 |
lembar |
80.100,00 |
108.135,00 |
117.1.1.1.22.233 |
Paku 2-5 inchi |
0.3 |
Kg |
34.700,00 |
10.410,00 |
|
|
|
|
Jumlah |
1.559.278,23 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.122.658,23 |
| 2020 | 24.1.1.6 | Pembuatan Bedeng Pekerja | M2 | 2.122.658,23 | Tidak Dipakai | |
1060 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.1.7 |
Pembersihan Lapangan "Ringan" dan Perataan |
|
M2 |
|
|
|
Upah: |
|
|
|
|
123.1.1.1.1.5 |
Kepala Tukang |
0 |
OH |
236.200,00 |
0,00 |
123.1.1.1.1.6 |
Mandor |
0.025 |
OH |
206.800,00 |
5.170,00 |
123.1.1.1.1.14 |
Pekerja Terlatih |
0.05 |
OH |
150.800,00 |
7.540,00 |
123.1.1.1.1.23 |
Tukang |
0 |
OH |
177.500,00 |
0,00 |
|
|
|
|
Jumlah |
12.710,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
12.710,00 |
| 2020 | 24.1.1.7 | Pembersihan Lapangan "Ringan" dan Perataan | M2 | 12.710,00 | Tidak Dipakai | |