921 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.5 |
Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.5 | Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang | 10 Pcs | 0,00 | Tidak Dipakai | |
922 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.6 |
Kanstin BDCM 21.5 |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.6 | Kanstin BDCM 21.5 | lembar | 0,00 | Tidak Dipakai | |
923 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.7 |
Kanstin Trap uk. 15.25.40 ; K-175 |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.7 | Kanstin Trap uk. 15.25.40 ; K-175 | lembar | 0,00 | Tidak Dipakai | |
924 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.8 |
Stopper/Uskup tebal 6 cm abu -abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.8 | Stopper/Uskup tebal 6 cm abu -abu | lembar | 0,00 | Tidak Dipakai | |
925 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.9 |
Stopper/Uskup tebal 8 cm abu - abu |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.9 | Stopper/Uskup tebal 8 cm abu - abu | lembar | 0,00 | Tidak Dipakai | |
926 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.10 |
Stopper/Uskup tebal 6 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.10 | Stopper/Uskup tebal 6 cm warna | lembar | 0,00 | Tidak Dipakai | |
927 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.11 |
Stopper/Uskup tebal 8 cm warna |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.11 | Stopper/Uskup tebal 8 cm warna | lembar | 0,00 | Tidak Dipakai | |
928 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.12 |
Pembongkaran Paving Dipakai Kembali |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.12 | Pembongkaran Paving Dipakai Kembali | 10 Pcs | 0,00 | Tidak Dipakai | |
929 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.13 |
Pembongkaran Paving Tidak Dipakai Kembali |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.13 | Pembongkaran Paving Tidak Dipakai Kembali | 10 Pcs | 0,00 | Tidak Dipakai | |
930 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.1.14 |
Pemasangan Grass Block |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.1.14 | Pemasangan Grass Block | 10 Pcs | 0,00 | Tidak Dipakai | |
931 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.1 |
Perkerasan Jalan raya |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.1 | Perkerasan Jalan raya | Pohon | 0,00 | Tidak Dipakai | |
932 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.2 |
Biaya Menghampar dengan Finisher |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.2 | Biaya Menghampar dengan Finisher | Pohon | 0,00 | Tidak Dipakai | |
933 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.3 |
Biaya Gilas dengan Pneumatic Tire Roller |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.3 | Biaya Gilas dengan Pneumatic Tire Roller | Pohon | 0,00 | Tidak Dipakai | |
934 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.4 |
Biaya Menggilas dengan Mesin Gilas (Tandem) |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.4 | Biaya Menggilas dengan Mesin Gilas (Tandem) | Pohon | 0,00 | Tidak Dipakai | |
935 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.5 |
Lapis Resap Ikat/Prime Coat |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.5 | Lapis Resap Ikat/Prime Coat | Pohon | 0,00 | Tidak Dipakai | |
936 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.6 |
Lapis Perekat/Tack Coat |
|
Pohon |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.6 | Lapis Perekat/Tack Coat | Pohon | 0,00 | Tidak Dipakai | |
937 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.7 |
Hot Rolled Sheet |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.8.2.7 | Hot Rolled Sheet | 10 Pcs | 0,00 | Tidak Dipakai | |
938 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.8 |
Agregat Lapis Pondasi Atas (LPA) Klas A |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0085 |
Orang Jam |
28.000,00 |
238,00 |
23.2.4.1.4.2 |
Pembantu Tukang |
0.595 |
Orang Jam |
15.700,00 |
9.341,50 |
|
|
|
|
Jumlah |
9.579,50 |
|
Bahan/Material: |
|
|
|
|
20.1.1.5.1.5 |
Agregat Base Course Klas A |
1.2586 |
M3 |
433.273,00 |
545.317,40 |
|
|
|
|
Jumlah |
545.317,40 |
|
Sewa Peralatan: |
|
|
|
|
2.2.1.12.5.6 |
Dump Truck |
0.2364 |
jam |
583.200,00 |
137.868,48 |
2.2.1.12.5.12 |
Tandem Roller 6 - 8 Ton |
0.0134 |
jam |
583.200,00 |
7.814,88 |
2.2.1.12.5.16 |
Water Tank Truck |
0.0141 |
jam |
583.200,00 |
8.223,12 |
23.2.5.11.6.7 |
Sewa Motor Grader 125 - 140 pk |
0.0043 |
jam |
292.700,00 |
1.258,61 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0085 |
jam |
608.800,00 |
5.174,80 |
|
|
|
|
Jumlah |
160.339,89 |
|
|
|
|
Nilai HSPK |
715.236,78 |
| 2019 | 24.8.2.8 | Agregat Lapis Pondasi Atas (LPA) Klas A | M3 | 715.236,78 | Tidak Dipakai | |
939 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.9 |
Agregat Lapis Pondasi Bawah (LPB) Klas B |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0085 |
Orang Jam |
28.000,00 |
238,00 |
23.2.4.1.4.2 |
Pembantu Tukang |
0.0595 |
Orang Jam |
15.700,00 |
934,15 |
|
|
|
|
Jumlah |
1.172,15 |
|
Bahan/Material: |
|
|
|
|
20.1.1.5.1.6 |
Agregat Base Course Klas B |
1.2586 |
M3 |
411.954,00 |
518.485,30 |
|
|
|
|
Jumlah |
518.485,30 |
|
Sewa Peralatan: |
|
|
|
|
2.2.1.12.5.6 |
Dump Truck |
0.2364 |
jam |
583.200,00 |
137.868,48 |
2.2.1.12.5.12 |
Tandem Roller 6 - 8 Ton |
0.0054 |
jam |
583.200,00 |
3.149,28 |
2.2.1.12.5.16 |
Water Tank Truck |
0.0141 |
jam |
583.200,00 |
8.223,12 |
23.2.5.11.6.7 |
Sewa Motor Grader 125 - 140 pk |
0.0043 |
jam |
292.700,00 |
1.258,61 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0085 |
jam |
608.800,00 |
5.174,80 |
|
|
|
|
Jumlah |
155.674,29 |
|
|
|
|
Nilai HSPK |
675.331,74 |
| 2019 | 24.8.2.9 | Agregat Lapis Pondasi Bawah (LPB) Klas B | M3 | 675.331,74 | Tidak Dipakai | |
940 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.10 |
Agregat Lapis Pondasi Bawah (LPB) Klas C |
|
M3 |
|
|
|
Upah: |
|
|
|
|
20.1.1.5.1.7 |
Agregat Base Course Klas C |
1.2586 |
M3 |
389.945,00 |
490.784,78 |
23.2.4.1.1.1 |
Mandor |
0.0085 |
Orang Jam |
28.000,00 |
238,00 |
23.2.4.1.4.2 |
Pembantu Tukang |
0.0595 |
Orang Jam |
15.700,00 |
934,15 |
|
|
|
|
Jumlah |
491.956,93 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
2.2.1.12.5.6 |
Dump Truck |
0.2342 |
jam |
583.200,00 |
136.585,44 |
2.2.1.12.5.12 |
Tandem Roller 6 - 8 Ton |
0.0107 |
jam |
583.200,00 |
6.240,24 |
2.2.1.12.5.16 |
Water Tank Truck |
0.0141 |
jam |
583.200,00 |
8.223,12 |
23.2.5.11.6.7 |
Sewa Motor Grader 125 - 140 pk |
0.0043 |
jam |
292.700,00 |
1.258,61 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0085 |
jam |
608.800,00 |
5.174,80 |
|
|
|
|
Jumlah |
157.482,21 |
|
|
|
|
Nilai HSPK |
649.439,14 |
| 2019 | 24.8.2.10 | Agregat Lapis Pondasi Bawah (LPB) Klas C | M3 | 649.439,14 | Tidak Dipakai | |