781 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.2 |
Pemasangan Plafon Eternit Rangka Kayu kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.2 | Pemasangan Plafon Eternit Rangka Kayu kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
782 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.3 |
Pemasangan Plafon Eternit Rangka Kayu Lama |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.3 | Pemasangan Plafon Eternit Rangka Kayu Lama | 10 Pcs | 0,00 | Tidak Dipakai | |
783 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.4 |
Pemasangan Plafon Eternit Rangka Kayu Meranti |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.4 | Pemasangan Plafon Eternit Rangka Kayu Meranti | 10 Pcs | 0,00 | Tidak Dipakai | |
784 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.5 |
Pemasangan Plafon Triplek Rangka Kayu Meranti |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.5 | Pemasangan Plafon Triplek Rangka Kayu Meranti | 10 Pcs | 0,00 | Tidak Dipakai | |
785 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.6 |
Pemasangan List plafond Kayu kamper |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.6 | Pemasangan List plafond Kayu kamper | lembar | 0,00 | Tidak Dipakai | |
786 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.7 |
Pemasangan Rangka Plafon Kayu Kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.7 | Pemasangan Rangka Plafon Kayu Kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
787 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.8 |
Pemasangan Rangka Plafon Kayu Meranti |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.8 | Pemasangan Rangka Plafon Kayu Meranti | 10 Pcs | 0,00 | Tidak Dipakai | |
788 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.9 |
Pemasangan Plafon Gypsum 9 mm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.9 | Pemasangan Plafon Gypsum 9 mm | 10 Pcs | 0,00 | Tidak Dipakai | |
789 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.10 |
Rangka Plafon Luar (Overstek) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.10 | Rangka Plafon Luar (Overstek) | 10 Pcs | 0,00 | Tidak Dipakai | |
790 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.11 |
Pemasangan Listplank Asbes Datar (Kayu Kamper) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.11 | Pemasangan Listplank Asbes Datar (Kayu Kamper) | 10 Pcs | 0,00 | Tidak Dipakai | |
791 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.12 |
Pemasangan Listplank Asbes Datar (Kayu Meranti) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.12 | Pemasangan Listplank Asbes Datar (Kayu Meranti) | 10 Pcs | 0,00 | Tidak Dipakai | |
792 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.13 |
Pemasangan Plafon Kalsiboard Rangka Aluminium |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.13 | Pemasangan Plafon Kalsiboard Rangka Aluminium | 10 Pcs | 0,00 | Tidak Dipakai | |
793 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.14 |
Pemasangan Plafond Kalsiboard Rangka Plafon Metal Furing |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.3.14 | Pemasangan Plafond Kalsiboard Rangka Plafon Metal Furing | 10 Pcs | 0,00 | Tidak Dipakai | |
794 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.15 |
pemasangan plafon asbes semen, tebal 4 mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.004 |
Orang Hari |
28.000,00 |
112,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.007 |
Orang Hari |
32.000,00 |
224,00 |
23.2.4.1.3.1 |
Tukang |
0.07 |
Orang Hari |
24.000,00 |
1.680,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.03 |
Orang Hari |
110.000,00 |
3.300,00 |
|
|
|
|
Jumlah |
5.316,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.13.1.1 |
Asbes Datar/Eternit |
1.1 |
lembar |
23.000,00 |
25.300,00 |
20.1.1.28.4.3 |
Paku Triplek/Eternit |
0.01 |
Kg |
23.000,00 |
230,00 |
|
|
|
|
Jumlah |
25.530,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
30.846,00 |
| 2019 | 24.6.3.15 | pemasangan plafon asbes semen, tebal 4 mm | M2 | 30.846,00 | Tidak Dipakai | |
795 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.16 |
pemasangan 1 m2 langit-langit akustik ukuran (30X30)cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.006 |
Orang Hari |
28.000,00 |
168,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.012 |
Orang Hari |
32.000,00 |
384,00 |
23.2.4.1.3.1 |
Tukang |
0.12 |
Orang Hari |
24.000,00 |
2.880,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.12 |
Orang Hari |
110.000,00 |
13.200,00 |
|
|
|
|
Jumlah |
16.632,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.13.1.2 |
Eternit |
1.1 |
lembar |
64.900,00 |
71.390,00 |
20.1.1.28.4.3 |
Paku Triplek/Eternit |
0.06 |
Kg |
23.000,00 |
1.380,00 |
|
|
|
|
Jumlah |
72.770,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
89.402,00 |
| 2019 | 24.6.3.16 | pemasangan 1 m2 langit-langit akustik ukuran (30X30)cm | M2 | 89.402,00 | Tidak Dipakai | |
796 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.17 |
pemasangan 1 m2 plafon triplek ukuran (120X240)cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.01 |
Orang Hari |
32.000,00 |
320,00 |
23.2.4.1.3.1 |
Tukang |
0.1 |
Orang Hari |
24.000,00 |
2.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
13.860,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.3 |
Paku Triplek/Eternit |
0.03 |
Kg |
23.000,00 |
690,00 |
|
|
|
|
Jumlah |
690,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.550,00 |
| 2019 | 24.6.3.17 | pemasangan 1 m2 plafon triplek ukuran (120X240)cm | M2 | 14.550,00 | Tidak Dipakai | |
797 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.18 |
pemasangan 1 m2 plafon gypsun board (120X240) 9mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.005 |
Orang Hari |
32.000,00 |
160,00 |
23.2.4.1.3.1 |
Tukang |
0.05 |
Orang Hari |
24.000,00 |
1.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
12.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.3 |
Paku Triplek/Eternit |
0.11 |
Kg |
23.000,00 |
2.530,00 |
20.1.1.44.5.1 |
Gypsum Board |
0.11 |
lembar |
70.100,00 |
7.711,00 |
|
|
|
|
Jumlah |
10.241,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
22.741,00 |
| 2019 | 24.6.3.18 | pemasangan 1 m2 plafon gypsun board (120X240) 9mm | M2 | 22.741,00 | Tidak Dipakai | |
798 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.19 |
pemasangan 1 m2 plafon calsium board (120X240) 4mm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.2.1 |
Kepala Tukang |
0.005 |
Orang Hari |
32.000,00 |
160,00 |
23.2.4.1.3.1 |
Tukang |
0.05 |
Orang Hari |
24.000,00 |
1.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
12.360,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.3 |
Paku Triplek/Eternit |
0.364 |
Kg |
23.000,00 |
8.372,00 |
|
|
|
|
Jumlah |
8.372,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
20.732,00 |
| 2019 | 24.6.3.19 | pemasangan 1 m2 plafon calsium board (120X240) 4mm | M2 | 20.732,00 | Tidak Dipakai | |
799 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.20 |
pemasangan 1 m' list plafond gypsum profil 4 |
|
M2 |
|
|
|
Upah: |
|
|
|
|
20.1.1.28.4.3 |
Paku Triplek/Eternit |
1.05 |
Kg |
23.000,00 |
24.150,00 |
20.1.1.43.3.3 |
Kayu Kamper |
0.004 |
M3 |
9.423.000,00 |
37.692,00 |
23.2.4.1.1.1 |
Mandor |
0.003 |
Orang Hari |
28.000,00 |
84,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.005 |
Orang Hari |
32.000,00 |
160,00 |
23.2.4.1.3.1 |
Tukang |
0.05 |
Orang Hari |
24.000,00 |
1.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.05 |
Orang Hari |
110.000,00 |
5.500,00 |
|
|
|
|
Jumlah |
68.786,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
68.786,00 |
| 2019 | 24.6.3.20 | pemasangan 1 m' list plafond gypsum profil 4 | M2 | 68.786,00 | Tidak Dipakai | |
800 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.3.21 |
pemasangan 1 m' list langit-langi tkayu profil |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.003 |
Orang Hari |
28.000,00 |
84,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.005 |
Orang Hari |
32.000,00 |
160,00 |
23.2.4.1.3.1 |
Tukang |
0.05 |
Orang Hari |
24.000,00 |
1.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.05 |
Orang Hari |
110.000,00 |
5.500,00 |
|
|
|
|
Jumlah |
6.944,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.2 |
Paku Reng |
1.05 |
Kg |
15.700,00 |
16.485,00 |
20.1.1.43.4.3 |
Kayu Meranti |
0.01 |
M3 |
4.188.000,00 |
41.880,00 |
|
|
|
|
Jumlah |
58.365,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
65.309,00 |
| 2019 | 24.6.3.21 | pemasangan 1 m' list langit-langi tkayu profil | M | 65.309,00 | Tidak Dipakai | |