741 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.18 |
pemasangan 1 m2 rangka atap seng BJLS # 0.35 kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.006 |
Orang Hari |
28.000,00 |
168,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.012 |
Orang Hari |
32.000,00 |
384,00 |
23.2.4.1.3.1 |
Tukang |
0.12 |
Orang Hari |
24.000,00 |
2.880,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.12 |
Orang Hari |
110.000,00 |
13.200,00 |
|
|
|
|
Jumlah |
16.632,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.006 |
Lonjor |
471.100,00 |
2.826,60 |
20.1.1.43.3.1 |
Kayu Kamper |
0.2 |
M3 |
7.219.000,00 |
1.443.800,02 |
|
|
|
|
Jumlah |
1.446.626,62 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.463.258,62 |
| 2019 | 24.6.1.18 | pemasangan 1 m2 rangka atap seng BJLS # 0.35 kayu kelas II | M2 | 1.463.258,62 | Tidak Dipakai | |
742 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.19 |
pemasangan 1 m2 rangka atap sirap kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.006 |
Orang Hari |
28.000,00 |
168,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.012 |
Orang Hari |
32.000,00 |
384,00 |
23.2.4.1.3.1 |
Tukang |
0.12 |
Orang Hari |
24.000,00 |
2.880,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.12 |
Orang Hari |
110.000,00 |
13.200,00 |
|
|
|
|
Jumlah |
16.632,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.014 |
Lonjor |
471.100,00 |
6.595,40 |
20.1.1.43.3.1 |
Kayu Kamper |
0.057 |
M3 |
7.219.000,00 |
411.483,00 |
|
|
|
|
Jumlah |
418.078,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
434.710,40 |
| 2019 | 24.6.1.19 | pemasangan 1 m2 rangka atap sirap kayu kelas II | M2 | 434.710,40 | Tidak Dipakai | |
743 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.20 |
pemasangan 1 m' lisplank ukuran (3x20) cm kayu kelas II |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.02 |
Orang Hari |
32.000,00 |
640,00 |
23.2.4.1.3.1 |
Tukang |
0.2 |
Orang Hari |
24.000,00 |
4.800,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
16.580,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.011 |
Lonjor |
471.100,00 |
5.182,10 |
20.1.1.43.3.1 |
Kayu Kamper |
0.1 |
M3 |
7.219.000,00 |
721.900,01 |
|
|
|
|
Jumlah |
727.082,11 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
743.662,11 |
| 2019 | 24.6.1.20 | pemasangan 1 m' lisplank ukuran (3x20) cm kayu kelas II | M | 743.662,11 | Tidak Dipakai | |
744 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.21 |
pemasangan 1 m' lisplank GRC |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.004 |
Orang Hari |
28.000,00 |
112,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.013 |
Orang Hari |
32.000,00 |
416,00 |
23.2.4.1.3.1 |
Tukang |
0.125 |
Orang Hari |
24.000,00 |
3.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.084 |
Orang Hari |
110.000,00 |
9.240,00 |
|
|
|
|
Jumlah |
12.768,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
1.1 |
Lonjor |
471.100,00 |
518.210,01 |
20.1.1.43.3.1 |
Kayu Kamper |
6 |
M3 |
7.219.000,00 |
43.314.000,00 |
|
|
|
|
Jumlah |
43.832.210,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
43.844.978,01 |
| 2019 | 24.6.1.21 | pemasangan 1 m' lisplank GRC | M | 43.844.978,01 | Tidak Dipakai | |
745 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.22 |
pemasangan 1 m2 HPL |
|
M2 |
|
|
|
Upah: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.4 |
Lonjor |
471.100,00 |
188.440,00 |
20.1.1.43.3.1 |
Kayu Kamper |
0.25 |
M3 |
7.219.000,00 |
1.804.750,00 |
23.2.4.1.1.1 |
Mandor |
0.002 |
Orang Hari |
28.000,00 |
56,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.017 |
Orang Hari |
32.000,00 |
544,00 |
23.2.4.1.3.1 |
Tukang |
0.175 |
Orang Hari |
24.000,00 |
4.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.35 |
Orang Hari |
110.000,00 |
38.500,00 |
|
|
|
|
Jumlah |
2.036.490,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.036.490,00 |
| 2019 | 24.6.1.22 | pemasangan 1 m2 HPL | M2 | 2.036.490,00 | Tidak Dipakai | |
746 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.24 |
pekerjaan rangka kuda-kuda WF |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.003 |
Orang Hari |
28.000,00 |
84,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.006 |
Orang Hari |
32.000,00 |
192,00 |
23.2.4.1.3.1 |
Tukang |
0.06 |
Orang Hari |
24.000,00 |
1.440,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.06 |
Orang Hari |
110.000,00 |
6.600,00 |
|
|
|
|
Jumlah |
8.316,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.8.1.1 |
Besi Profil WF |
1.15 |
Kg |
21.900,00 |
25.185,00 |
|
|
|
|
Jumlah |
25.185,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
33.501,00 |
| 2019 | 24.6.1.24 | pekerjaan rangka kuda-kuda WF | Kg | 33.501,00 | Tidak Dipakai | |
747 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.1 |
Pemasangan Genteng Jawa (Soka) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.1 | Pemasangan Genteng Jawa (Soka) | 10 Pcs | 0,00 | Tidak Dipakai | |
748 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.2 |
Pemasangan Genteng Kaca |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.2 | Pemasangan Genteng Kaca | 10 Pcs | 0,00 | Tidak Dipakai | |
749 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.3 |
Pemasangan Genteng Karang Pilang / Wisma |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.3 | Pemasangan Genteng Karang Pilang / Wisma | 10 Pcs | 0,00 | Tidak Dipakai | |
750 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.4 |
Pemasangan Atap Sirap Asbes Tebal 4 mm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.4 | Pemasangan Atap Sirap Asbes Tebal 4 mm | 10 Pcs | 0,00 | Tidak Dipakai | |
751 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.5 |
Pemasangan Atap Seng Gelombang BJLS 30 |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.5 | Pemasangan Atap Seng Gelombang BJLS 30 | 10 Pcs | 0,00 | Tidak Dipakai | |
752 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.6 |
Pemasangan Atap Seng Gelombang BJLS 40 |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.6 | Pemasangan Atap Seng Gelombang BJLS 40 | 10 Pcs | 0,00 | Tidak Dipakai | |
753 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.7 |
Pemasangan Atap Fiber Glass |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.7 | Pemasangan Atap Fiber Glass | 10 Pcs | 0,00 | Tidak Dipakai | |
754 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.8 |
Pemasangan Atap Genteng Galvalume (m2) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.8 | Pemasangan Atap Genteng Galvalume (m2) | 10 Pcs | 0,00 | Tidak Dipakai | |
755 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.9 |
Pemasangan Wuwung Genteng Jawa |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.9 | Pemasangan Wuwung Genteng Jawa | lembar | 0,00 | Tidak Dipakai | |
756 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.10 |
Pemasangan Wuwung Genteng Karang Pilang |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.10 | Pemasangan Wuwung Genteng Karang Pilang | lembar | 0,00 | Tidak Dipakai | |
757 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.11 |
Pemasangan Wuwung/Jurai Genteng Galvalume Tebal 4 mm (m) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.11 | Pemasangan Wuwung/Jurai Genteng Galvalume Tebal 4 mm (m) | lembar | 0,00 | Tidak Dipakai | |
758 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.12 |
Pemasangan Listplank Kayu Meranti 2/20 |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.12 | Pemasangan Listplank Kayu Meranti 2/20 | lembar | 0,00 | Tidak Dipakai | |
759 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.13 |
Pemasangan Listplank Kayu Kamper 2 / 20 cm |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.13 | Pemasangan Listplank Kayu Kamper 2 / 20 cm | lembar | 0,00 | Tidak Dipakai | |
760 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.2.14 |
Pemasangan Listplank Kayu Meranti 3 / 30 cm |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.2.14 | Pemasangan Listplank Kayu Meranti 3 / 30 cm | lembar | 0,00 | Tidak Dipakai | |