721 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.35 |
pemasangan 1 m2 alumunium composite panel (acp) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.1 |
Semen PC |
1.01 |
Zak |
60.700,00 |
61.307,00 |
20.1.1.2.1.2 |
Semen Mortar |
8 |
kilogram |
103.251,00 |
826.008,00 |
20.1.1.2.2.1 |
Semen PC |
2.93 |
Zak |
69.100,00 |
202.463,00 |
|
|
|
|
Jumlah |
1.089.778,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.089.778,00 |
| 2019 | 24.5.1.35 | pemasangan 1 m2 alumunium composite panel (acp) | M2 | 1.089.778,00 | Tidak Dipakai | |
722 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.36 |
pembongkaran lantai jembatan kayu |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.3086 |
jam |
69.200,00 |
21.355,12 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0087 |
jam |
608.800,00 |
5.296,56 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
0.1004 |
jam |
196.900,00 |
19.768,76 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
67.720,44 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
67.720,44 |
| 2019 | 24.5.1.36 | pembongkaran lantai jembatan kayu | M2 | 67.720,44 | Tidak Dipakai | |
723 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.37 |
pembongkaran jembatan kayu II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.2915 |
jam |
69.200,00 |
20.171,80 |
23.2.5.11.3.1 |
Sewa Crane |
0.5 |
jam |
146.300,00 |
73.150,00 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
114.621,80 |
|
|
|
|
Nilai HSPK |
114.621,80 |
| 2019 | 24.5.1.37 | pembongkaran jembatan kayu II | M2 | 114.621,80 | Tidak Dipakai | |
724 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.1 |
Pemasangan Kuda-Kuda Kayu Jati (Bentang Max.6 meter) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.1 | Pemasangan Kuda-Kuda Kayu Jati (Bentang Max.6 meter) | 500 Biji | 0,00 | Tidak Dipakai | |
725 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.2 |
Pemasangan Kuda-Kuda Kayu Kamper (Bentang Max 7 m) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.2 | Pemasangan Kuda-Kuda Kayu Kamper (Bentang Max 7 m) | 500 Biji | 0,00 | Tidak Dipakai | |
726 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.3 |
Pemasangan Kuda-Kuda Kayu Meranti (Bentang Max.7 meter) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.3 | Pemasangan Kuda-Kuda Kayu Meranti (Bentang Max.7 meter) | 500 Biji | 0,00 | Tidak Dipakai | |
727 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.4 |
Pekerjaan Rangka Kuda - kuda WF |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.4 | Pekerjaan Rangka Kuda - kuda WF | ikat | 0,00 | Tidak Dipakai | |
728 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.5 |
Pemasangan Reng kamper/Usuk kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.5 | Pemasangan Reng kamper/Usuk kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
729 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.6 |
Pemasangan Reng Meranti/Usuk Kamper |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.6 | Pemasangan Reng Meranti/Usuk Kamper | 10 Pcs | 0,00 | Tidak Dipakai | |
730 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.7 |
Pemasangan Reng Kamper/Usuk Jati |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.7 | Pemasangan Reng Kamper/Usuk Jati | 10 Pcs | 0,00 | Tidak Dipakai | |
731 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.8 |
Pemasangan Gording Kamper |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.8 | Pemasangan Gording Kamper | 500 Biji | 0,00 | Tidak Dipakai | |
732 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.9 |
Pemasang rangka atap Galvalume Uk 0.8 mm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.9 | Pemasang rangka atap Galvalume Uk 0.8 mm | 10 Pcs | 0,00 | Tidak Dipakai | |
733 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.10 |
Pemasang rangka atap Galvalume Tebal 0.5 mm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.10 | Pemasang rangka atap Galvalume Tebal 0.5 mm | 10 Pcs | 0,00 | Tidak Dipakai | |
734 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.11 |
Pemasang rangka atap Galvalume Campuran |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.6.1.11 | Pemasang rangka atap Galvalume Campuran | 10 Pcs | 0,00 | Tidak Dipakai | |
735 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.12 |
pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas 1 (damar) bentang 6m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.2 |
Orang Hari |
28.000,00 |
5.600,00 |
23.2.4.1.2.1 |
Kepala Tukang |
1.2 |
Orang Hari |
32.000,00 |
38.400,00 |
23.2.4.1.3.1 |
Tukang |
12 |
Orang Hari |
24.000,00 |
288.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
4000 |
Orang Hari |
110.000,00 |
440.000.000,00 |
|
|
|
|
Jumlah |
440.332.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
1.1 |
Lonjor |
471.100,00 |
518.210,01 |
20.1.1.28.4.1 |
Paku Klem |
15 |
Doz |
19.800,00 |
297.000,00 |
20.1.1.43.1.1 |
Kayu Jati |
5.6 |
M3 |
19.282.800,00 |
107.983.678,16 |
|
|
|
|
Jumlah |
108.798.888,17 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
549.130.888,17 |
| 2019 | 24.6.1.12 | pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas 1 (damar) bentang 6m | M3 | 549.130.888,17 | Tidak Dipakai | |
736 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.13 |
pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas II (damar) bentang 6m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.2 |
Orang Hari |
28.000,00 |
5.600,00 |
23.2.4.1.2.1 |
Kepala Tukang |
1.2 |
Orang Hari |
32.000,00 |
38.400,00 |
23.2.4.1.3.1 |
Tukang |
12 |
Orang Hari |
24.000,00 |
288.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
4 |
Orang Hari |
110.000,00 |
440.000,00 |
|
|
|
|
Jumlah |
772.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
1.1 |
Lonjor |
471.100,00 |
518.210,01 |
20.1.1.28.4.1 |
Paku Klem |
15 |
Doz |
19.800,00 |
297.000,00 |
20.1.1.43.3.1 |
Kayu Kamper |
5.6 |
M3 |
7.219.000,00 |
40.426.399,31 |
|
|
|
|
Jumlah |
41.241.609,32 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
42.013.609,32 |
| 2019 | 24.6.1.13 | pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas II (damar) bentang 6m | M3 | 42.013.609,32 | Tidak Dipakai | |
737 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.14 |
pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas III (damar) bentang 6m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.2 |
Orang Hari |
28.000,00 |
5.600,00 |
23.2.4.1.2.1 |
Kepala Tukang |
1.2 |
Orang Hari |
32.000,00 |
38.400,00 |
23.2.4.1.3.1 |
Tukang |
12 |
Orang Hari |
24.000,00 |
288.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
4 |
Orang Hari |
110.000,00 |
440.000,00 |
|
|
|
|
Jumlah |
772.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
1.1 |
Lonjor |
471.100,00 |
518.210,01 |
20.1.1.28.4.1 |
Paku Klem |
15 |
Doz |
19.800,00 |
297.000,00 |
20.1.1.43.3.1 |
Kayu Kamper |
5.6 |
M3 |
7.219.000,00 |
40.426.399,31 |
|
|
|
|
Jumlah |
41.241.609,32 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
42.013.609,32 |
| 2019 | 24.6.1.14 | pemasangan 1 m3 kontruksi kuda-kuda konvensional kayu kelas III (damar) bentang 6m | M3 | 42.013.609,32 | Tidak Dipakai | |
738 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.15 |
pemasanagn 1 m3 konstruksi gordeng kayu kelas II |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.335 |
Orang Hari |
28.000,00 |
9.380,00 |
23.2.4.1.2.1 |
Kepala Tukang |
2.01 |
Orang Hari |
32.000,00 |
64.320,00 |
23.2.4.1.3.1 |
Tukang |
20.1 |
Orang Hari |
24.000,00 |
482.400,01 |
23.2.4.1.4.1 |
Pembantu Tukang |
6.7 |
Orang Hari |
110.000,00 |
736.999,98 |
|
|
|
|
Jumlah |
1.293.099,99 |
|
Bahan/Material: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
1.1 |
Lonjor |
471.100,00 |
518.210,01 |
20.1.1.28.4.2 |
Paku Reng |
15 |
Kg |
15.700,00 |
235.500,00 |
20.1.1.43.3.1 |
Kayu Kamper |
3 |
M3 |
7.219.000,00 |
21.657.000,00 |
|
|
|
|
Jumlah |
22.410.710,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
23.703.810,00 |
| 2019 | 24.6.1.15 | pemasanagn 1 m3 konstruksi gordeng kayu kelas II | M3 | 23.703.810,00 | Tidak Dipakai | |
739 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.16 |
pemasangan 1 m2 rangka atap genteng keramik kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.014 |
Lonjor |
471.100,00 |
6.595,40 |
20.1.1.28.4.2 |
Paku Reng |
0.036 |
Kg |
15.700,00 |
565,20 |
20.1.1.43.3.1 |
Kayu Kamper |
0.25 |
M3 |
7.219.000,00 |
1.804.750,00 |
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.01 |
Orang Hari |
32.000,00 |
320,00 |
23.2.4.1.3.1 |
Tukang |
0.1 |
Orang Hari |
24.000,00 |
2.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
1.825.770,60 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.825.770,60 |
| 2019 | 24.6.1.16 | pemasangan 1 m2 rangka atap genteng keramik kayu kelas II | M2 | 1.825.770,60 | Tidak Dipakai | |
740 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.6.1.17 |
pemasangan 1 m2 rangka atap genteng beton kayu kelas II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
20.1.1.11.1.1 |
Plat Besi/Baja |
0.014 |
Lonjor |
471.100,00 |
6.595,40 |
20.1.1.28.4.2 |
Paku Reng |
0.057 |
Kg |
15.700,00 |
894,90 |
20.1.1.43.3.1 |
Kayu Kamper |
0.25 |
M3 |
7.219.000,00 |
1.804.750,00 |
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.01 |
Orang Hari |
32.000,00 |
320,00 |
23.2.4.1.3.1 |
Tukang |
0.1 |
Orang Hari |
24.000,00 |
2.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
1.826.100,30 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.826.100,30 |
| 2019 | 24.6.1.17 | pemasangan 1 m2 rangka atap genteng beton kayu kelas II | M2 | 1.826.100,30 | Tidak Dipakai | |