24.5.1.15 |
pemasangan 1 m2 lantai keramik 20X20 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.7 |
Orang Hari |
110.000,00 |
77.000,00 |
|
|
|
|
Jumlah |
87.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.62 |
Kg |
12.500,00 |
20.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
26.5 |
M2 |
84.800,00 |
2.247.200,00 |
|
|
|
|
Jumlah |
2.996.219,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.083.719,47 |
| 2019 | 24.5.1.15 | pemasangan 1 m2 lantai keramik 20X20 cm | M2 | 3.083.719,47 | Tidak Dipakai | |
702 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.16 |
pemasangan 1 m2 lantai keramik ukuranya 20X25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.7 |
Orang Hari |
28.000,00 |
19.600,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.35 |
Orang Hari |
32.000,00 |
11.200,00 |
23.2.4.1.3.1 |
Tukang |
0.035 |
Orang Hari |
24.000,00 |
840,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.035 |
Orang Hari |
110.000,00 |
3.850,00 |
|
|
|
|
Jumlah |
35.490,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.26 |
Kg |
12.500,00 |
15.750,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
20 |
M2 |
84.800,00 |
1.696.000,00 |
|
|
|
|
Jumlah |
2.440.519,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.476.009,47 |
| 2019 | 24.5.1.16 | pemasangan 1 m2 lantai keramik ukuranya 20X25 cm | M2 | 2.476.009,47 | Tidak Dipakai | |
703 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.17 |
pemasangan 1 m2 lantai keramik ukuranya 60X60 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.7 |
Orang Hari |
110.000,00 |
77.000,00 |
|
|
|
|
Jumlah |
86.380,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.62 |
Kg |
12.500,00 |
20.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
3 |
M2 |
84.800,00 |
254.400,00 |
|
|
|
|
Jumlah |
1.003.419,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.089.799,47 |
| 2019 | 24.5.1.17 | pemasangan 1 m2 lantai keramik ukuranya 60X60 cm | M2 | 1.089.799,47 | Tidak Dipakai | |
704 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.18 |
pemasangan 1 m2 lantai keramik ukuranya 40X40 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.7 |
Orang Hari |
110.000,00 |
77.000,00 |
|
|
|
|
Jumlah |
87.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.62 |
Kg |
12.500,00 |
20.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
6.5 |
M2 |
84.800,00 |
551.200,00 |
|
|
|
|
Jumlah |
1.300.219,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.387.719,47 |
| 2019 | 24.5.1.18 | pemasangan 1 m2 lantai keramik ukuranya 40X40 cm | M2 | 1.387.719,47 | Tidak Dipakai | |
705 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.19 |
pemasangan 1 m2 lantai keramik ukuranya 40X40 cm setara granito |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
|
|
|
|
Jumlah |
10.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.62 |
Kg |
12.500,00 |
20.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
6.5 |
M2 |
84.800,00 |
551.200,00 |
|
|
|
|
Jumlah |
1.300.219,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.310.719,47 |
| 2019 | 24.5.1.19 | pemasangan 1 m2 lantai keramik ukuranya 40X40 cm setara granito | M2 | 1.310.719,47 | Tidak Dipakai | |
706 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.20 |
pemasangan 1 m2 lantai keramik ukuranya 40X40 cm setara essenza |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.7 |
Orang Hari |
110.000,00 |
77.000,00 |
|
|
|
|
Jumlah |
87.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
10.4 |
Zak |
69.100,00 |
718.639,97 |
20.1.1.2.3.1 |
Semen Berwarna |
1.62 |
Kg |
12.500,00 |
20.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.045 |
M3 |
225.100,00 |
10.129,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
6.5 |
M2 |
84.800,00 |
551.200,00 |
|
|
|
|
Jumlah |
1.300.219,47 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.387.719,47 |
| 2019 | 24.5.1.20 | pemasangan 1 m2 lantai keramik ukuranya 40X40 cm setara essenza | M2 | 1.387.719,47 | Tidak Dipakai | |
707 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.21 |
pemasangan 1 m' plint keramik ukuran 10cmX20cm |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.09 |
Orang Hari |
24.000,00 |
2.160,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.09 |
Orang Hari |
110.000,00 |
9.900,00 |
|
|
|
|
Jumlah |
13.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
1.14 |
Zak |
69.100,00 |
78.774,00 |
20.1.1.2.3.1 |
Semen Berwarna |
0.025 |
Kg |
12.500,00 |
312,50 |
20.1.1.4.3.1 |
Pasir Pasang |
0.003 |
M3 |
225.100,00 |
675,30 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
5.3 |
M2 |
84.800,00 |
449.440,02 |
|
|
|
|
Jumlah |
529.201,82 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
542.521,82 |
| 2019 | 24.5.1.21 | pemasangan 1 m' plint keramik ukuran 10cmX20cm | M | 542.521,82 | Tidak Dipakai | |
708 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.22 |
pemasangan 1 m' plint keramik ukuran 10cmX30cm |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.09 |
Orang Hari |
24.000,00 |
2.160,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.09 |
Orang Hari |
110.000,00 |
9.900,00 |
|
|
|
|
Jumlah |
13.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
0.57 |
Zak |
69.100,00 |
39.387,00 |
20.1.1.2.3.1 |
Semen Berwarna |
0.013 |
Kg |
12.500,00 |
162,50 |
20.1.1.4.3.1 |
Pasir Pasang |
0.002 |
M3 |
225.100,00 |
450,20 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
5.3 |
M2 |
84.800,00 |
449.440,02 |
|
|
|
|
Jumlah |
489.439,72 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
502.759,72 |
| 2019 | 24.5.1.22 | pemasangan 1 m' plint keramik ukuran 10cmX30cm | M | 502.759,72 | Tidak Dipakai | |
709 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.23 |
pemasangan 1 m' plint keramik ukuran 10cmX40cm |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.09 |
Orang Hari |
24.000,00 |
2.160,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.09 |
Orang Hari |
110.000,00 |
9.900,00 |
|
|
|
|
Jumlah |
13.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
0.57 |
Zak |
69.100,00 |
39.387,00 |
20.1.1.2.3.1 |
Semen Berwarna |
0.013 |
Kg |
12.500,00 |
162,50 |
20.1.1.4.3.1 |
Pasir Pasang |
0.002 |
M3 |
225.100,00 |
450,20 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
5.3 |
M2 |
84.800,00 |
449.440,02 |
|
|
|
|
Jumlah |
489.439,72 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
502.759,72 |
| 2019 | 24.5.1.23 | pemasangan 1 m' plint keramik ukuran 10cmX40cm | M | 502.759,72 | Tidak Dipakai | |
710 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.24 |
pemasangan 1 m' plint keramik ukuran 10cmX60cm |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.09 |
Orang Hari |
24.000,00 |
2.160,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.09 |
Orang Hari |
110.000,00 |
9.900,00 |
|
|
|
|
Jumlah |
13.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
0.57 |
Zak |
69.100,00 |
39.387,00 |
20.1.1.2.3.1 |
Semen Berwarna |
0.013 |
Kg |
12.500,00 |
162,50 |
20.1.1.4.3.1 |
Pasir Pasang |
0.002 |
M3 |
225.100,00 |
450,20 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
5.3 |
M2 |
84.800,00 |
449.440,02 |
|
|
|
|
Jumlah |
489.439,72 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
502.759,72 |
| 2019 | 24.5.1.24 | pemasangan 1 m' plint keramik ukuran 10cmX60cm | M | 502.759,72 | Tidak Dipakai | |
711 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.25 |
pemasangan 1 m2 lantai karpet |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.009 |
Orang Hari |
28.000,00 |
252,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.017 |
Orang Hari |
32.000,00 |
544,00 |
23.2.4.1.3.1 |
Tukang |
0.17 |
Orang Hari |
24.000,00 |
4.080,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.17 |
Orang Hari |
110.000,00 |
18.700,00 |
|
|
|
|
Jumlah |
23.576,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.3.1 |
Semen Berwarna |
0.35 |
Kg |
12.500,00 |
4.375,00 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
1.05 |
M2 |
84.800,00 |
89.040,00 |
|
|
|
|
Jumlah |
93.415,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
116.991,00 |
| 2019 | 24.5.1.25 | pemasangan 1 m2 lantai karpet | M | 116.991,00 | Tidak Dipakai | |
712 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.26 |
pemasangan 1 m2 lantai kayu gymfloor |
|
M |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.053 |
Orang Hari |
28.000,00 |
1.484,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.7 |
Orang Hari |
110.000,00 |
77.000,00 |
|
|
|
|
Jumlah |
88.004,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.3.1 |
Semen Berwarna |
0.6 |
Kg |
12.500,00 |
7.500,00 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
1.05 |
M2 |
84.800,00 |
89.040,00 |
|
|
|
|
Jumlah |
96.540,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
184.543,99 |
| 2019 | 24.5.1.26 | pemasangan 1 m2 lantai kayu gymfloor | M | 184.543,99 | Tidak Dipakai | |
713 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.27 |
pemasangan 1 m2 dinding keramik 20x20 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.045 |
Orang Hari |
28.000,00 |
1.260,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.045 |
Orang Hari |
32.000,00 |
1.440,00 |
23.2.4.1.3.1 |
Tukang |
0.45 |
Orang Hari |
24.000,00 |
10.800,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.9 |
Orang Hari |
110.000,00 |
99.000,00 |
|
|
|
|
Jumlah |
112.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
9.3 |
Zak |
69.100,00 |
642.630,01 |
20.1.1.2.3.1 |
Semen Berwarna |
1.94 |
Kg |
12.500,00 |
24.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.018 |
M3 |
225.100,00 |
4.051,80 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
26.5 |
M2 |
84.800,00 |
2.247.200,00 |
|
|
|
|
Jumlah |
2.918.131,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
3.030.631,81 |
| 2019 | 24.5.1.27 | pemasangan 1 m2 dinding keramik 20x20 cm | M2 | 3.030.631,81 | Tidak Dipakai | |
714 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.28 |
pemasangan 1 m2 dinding keramik ukuran 20 x 25 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.045 |
Orang Hari |
28.000,00 |
1.260,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.045 |
Orang Hari |
32.000,00 |
1.440,00 |
23.2.4.1.3.1 |
Tukang |
0.45 |
Orang Hari |
24.000,00 |
10.800,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.9 |
Orang Hari |
110.000,00 |
99.000,00 |
|
|
|
|
Jumlah |
112.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
9.3 |
Zak |
69.100,00 |
642.630,01 |
20.1.1.2.3.1 |
Semen Berwarna |
1.94 |
Kg |
12.500,00 |
24.250,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.018 |
M3 |
225.100,00 |
4.051,80 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
21 |
M2 |
84.800,00 |
1.780.800,00 |
|
|
|
|
Jumlah |
2.451.731,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
2.564.231,81 |
| 2019 | 24.5.1.28 | pemasangan 1 m2 dinding keramik ukuran 20 x 25 cm | M2 | 2.564.231,81 | Tidak Dipakai | |
715 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.29 |
pemasangan 1 m2 dinding batu tempel hitam |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.035 |
Orang Hari |
28.000,00 |
980,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.15 |
Orang Hari |
110.000,00 |
16.500,00 |
|
|
|
|
Jumlah |
27.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
11.75 |
Zak |
69.100,00 |
811.925,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.035 |
M3 |
225.100,00 |
7.878,50 |
20.1.1.22.2.2 |
Keramik Lantai Bermotif |
1.1 |
M2 |
84.800,00 |
93.280,00 |
|
|
|
|
Jumlah |
913.083,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
940.083,50 |
| 2019 | 24.5.1.29 | pemasangan 1 m2 dinding batu tempel hitam | M2 | 940.083,50 | Tidak Dipakai | |
716 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.30 |
pemasangan 1 m2 wallpaper lebar 50 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.002 |
Orang Hari |
28.000,00 |
56,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.017 |
Orang Hari |
32.000,00 |
544,00 |
23.2.4.1.3.1 |
Tukang |
0.175 |
Orang Hari |
24.000,00 |
4.200,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.35 |
Orang Hari |
110.000,00 |
38.500,00 |
|
|
|
|
Jumlah |
43.300,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.3.1 |
Semen Berwarna |
0.25 |
Kg |
12.500,00 |
3.125,00 |
20.1.1.22.2.1 |
Keramik (Dinding) |
2.2 |
M2 |
62.800,00 |
138.160,00 |
|
|
|
|
Jumlah |
141.285,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
184.585,00 |
| 2019 | 24.5.1.30 | pemasangan 1 m2 wallpaper lebar 50 cm | M2 | 184.585,00 | Tidak Dipakai | |
717 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.31 |
pembuatan / pemasangan hardener floor (granit trase corak) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.006 |
Orang Hari |
28.000,00 |
168,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.012 |
Orang Hari |
32.000,00 |
384,00 |
23.2.4.1.3.1 |
Tukang |
0.12 |
Orang Hari |
24.000,00 |
2.880,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.12 |
Orang Hari |
110.000,00 |
13.200,00 |
|
|
|
|
Jumlah |
16.632,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
5 |
Zak |
69.100,00 |
345.500,00 |
|
|
|
|
Jumlah |
345.500,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
362.132,00 |
| 2019 | 24.5.1.31 | pembuatan / pemasangan hardener floor (granit trase corak) | M2 | 362.132,00 | Tidak Dipakai | |
718 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.32 |
pemasangan 1 m2 paving block tebal 6 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0013 |
Orang Hari |
28.000,00 |
36,40 |
23.2.4.1.2.1 |
Kepala Tukang |
0.05 |
Orang Hari |
32.000,00 |
1.600,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.25 |
Orang Hari |
110.000,00 |
27.500,00 |
|
|
|
|
Jumlah |
37.536,40 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
1.01 |
Zak |
69.100,00 |
69.791,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.05 |
M3 |
225.100,00 |
11.255,00 |
|
|
|
|
Jumlah |
81.046,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
118.582,40 |
| 2019 | 24.5.1.32 | pemasangan 1 m2 paving block tebal 6 cm | M2 | 118.582,40 | Tidak Dipakai | |
719 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.33 |
pemasangan 1 m2 paving block tebal 8 cm |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0013 |
Orang Hari |
28.000,00 |
36,40 |
23.2.4.1.2.1 |
Kepala Tukang |
0.05 |
Orang Hari |
32.000,00 |
1.600,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
43.036,40 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
1.01 |
Zak |
69.100,00 |
69.791,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.05 |
M3 |
225.100,00 |
11.255,00 |
|
|
|
|
Jumlah |
81.046,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
124.082,40 |
| 2019 | 24.5.1.33 | pemasangan 1 m2 paving block tebal 8 cm | M2 | 124.082,40 | Tidak Dipakai | |
720 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.5.1.34 |
pemasangan 1 m2 waterproofing membrane bakar |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0035 |
Orang Hari |
28.000,00 |
98,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.05 |
Orang Hari |
32.000,00 |
1.600,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.35 |
Orang Hari |
110.000,00 |
38.500,00 |
|
|
|
|
Jumlah |
48.598,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
1.1 |
Zak |
69.100,00 |
76.010,00 |
|
|
|
|
Jumlah |
76.010,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
124.608,00 |