621 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.9 |
pekerjaan 1kg pemasangan besi profil |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.003 |
Orang Hari |
28.000,00 |
84,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.006 |
Orang Hari |
32.000,00 |
192,00 |
23.2.4.1.3.1 |
Tukang |
0.06 |
Orang Hari |
24.000,00 |
1.440,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.06 |
Orang Hari |
110.000,00 |
6.600,00 |
|
|
|
|
Jumlah |
8.316,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.8.1.1 |
Besi Profil WF |
1.15 |
Kg |
21.900,00 |
25.185,00 |
|
|
|
|
Jumlah |
25.185,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
33.501,00 |
| 2019 | 24.3.2.9 | pekerjaan 1kg pemasangan besi profil | Kg | 33.501,00 | Tidak Dipakai | |
622 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.10 |
pekerjaan 1 kg pemasangan kuda-kuda 1wf |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.003 |
Orang Hari |
28.000,00 |
84,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.006 |
Orang Hari |
32.000,00 |
192,00 |
23.2.4.1.3.1 |
Tukang |
0.06 |
Orang Hari |
24.000,00 |
1.440,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.06 |
Orang Hari |
110.000,00 |
6.600,00 |
|
|
|
|
Jumlah |
8.316,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.8.1.1 |
Besi Profil WF |
1.15 |
Kg |
21.900,00 |
25.185,00 |
|
|
|
|
Jumlah |
25.185,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
33.501,00 |
| 2019 | 24.3.2.10 | pekerjaan 1 kg pemasangan kuda-kuda 1wf | Kg | 33.501,00 | Tidak Dipakai | |
623 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.11 |
pekerjaan perakitan besi |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.001 |
Orang Hari |
32.000,00 |
32,00 |
23.2.4.1.3.1 |
Tukang |
0.1 |
Orang Hari |
24.000,00 |
2.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
13.572,00 |
|
Bahan/Material: |
|
|
|
|
20.1.2.1.1.1 |
Solar |
1 |
liter |
7.800,00 |
7.800,00 |
20.1.2.1.4.38 |
Pelumas Gerdang |
0.1 |
liter |
84.564,00 |
8.456,40 |
|
|
|
|
Jumlah |
16.256,40 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.6 |
Sewa Alat Bantu |
0.17 |
M3 |
1.100,00 |
187,00 |
|
|
|
|
Jumlah |
187,00 |
|
|
|
|
Nilai HSPK |
30.015,40 |
| 2019 | 24.3.2.11 | pekerjaan perakitan besi | Kg | 30.015,40 | Tidak Dipakai | |
624 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.12 |
pekerjaan 10cm pengelasan dengan las listrik |
|
cm |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.04 |
Orang Hari |
28.000,00 |
1.120,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.02 |
Orang Hari |
32.000,00 |
640,00 |
23.2.4.1.3.1 |
Tukang |
0.002 |
Orang Hari |
24.000,00 |
48,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.002 |
Orang Hari |
110.000,00 |
220,00 |
|
|
|
|
Jumlah |
2.028,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
0.4 |
Kg |
57.500,00 |
23.000,00 |
20.1.2.1.1.1 |
Solar |
0.03 |
liter |
7.800,00 |
234,00 |
20.1.2.1.4.38 |
Pelumas Gerdang |
0.04 |
liter |
84.564,00 |
3.382,56 |
|
|
|
|
Jumlah |
26.616,56 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.6 |
Sewa Alat Bantu |
0.17 |
M3 |
1.100,00 |
187,00 |
|
|
|
|
Jumlah |
187,00 |
|
|
|
|
Nilai HSPK |
28.831,56 |
| 2019 | 24.3.2.12 | pekerjaan 10cm pengelasan dengan las listrik | cm | 28.831,56 | Tidak Dipakai | |
625 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.13 |
pekerjaan 1 m2 pemasangan kawat nyamuk |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.01 |
Orang Hari |
32.000,00 |
320,00 |
23.2.4.1.3.1 |
Tukang |
0.1 |
Orang Hari |
24.000,00 |
2.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.1 |
Orang Hari |
110.000,00 |
11.000,00 |
|
|
|
|
Jumlah |
13.860,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
1.1 |
Kg |
57.500,00 |
63.250,00 |
20.1.2.1.1.1 |
Solar |
11.11 |
liter |
7.800,00 |
86.658,00 |
20.1.2.1.4.1 |
Minyak Pelumas |
1.176 |
liter |
26.100,00 |
30.693,60 |
|
|
|
|
Jumlah |
180.601,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
194.461,60 |
| 2019 | 24.3.2.13 | pekerjaan 1 m2 pemasangan kawat nyamuk | M2 | 194.461,60 | Tidak Dipakai | |
626 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.14 |
pekerjaan1 m2 atap pelana rangka atap baja ringan canal c 75 bahan atap seng/spandek/zincalum |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.02 |
Orang Hari |
28.000,00 |
560,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.06 |
Orang Hari |
32.000,00 |
1.920,00 |
23.2.4.1.3.1 |
Tukang |
0.6 |
Orang Hari |
24.000,00 |
14.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.6 |
Orang Hari |
110.000,00 |
66.000,00 |
|
|
|
|
Jumlah |
82.880,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
3.065 |
Kg |
57.500,00 |
176.237,50 |
20.1.2.1.1.1 |
Solar |
1.67 |
liter |
7.800,00 |
13.026,00 |
|
|
|
|
Jumlah |
189.263,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
272.143,51 |
| 2019 | 24.3.2.14 | pekerjaan1 m2 atap pelana rangka atap baja ringan canal c 75 bahan atap seng/spandek/zincalum | M2 | 272.143,51 | Tidak Dipakai | |
627 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.15 |
pekerjaan1 m2 atap pelana rangka atap baja ringan profil c 75 bahan atap genteng |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.02 |
Orang Hari |
28.000,00 |
560,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.06 |
Orang Hari |
32.000,00 |
1.920,00 |
23.2.4.1.3.1 |
Tukang |
0.06 |
Orang Hari |
24.000,00 |
1.440,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.6 |
Orang Hari |
110.000,00 |
66.000,00 |
|
|
|
|
Jumlah |
69.920,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
3.525 |
Kg |
57.500,00 |
202.687,51 |
20.1.2.1.1.1 |
Solar |
3.3 |
liter |
7.800,00 |
25.740,00 |
20.1.2.1.4.1 |
Minyak Pelumas |
10 |
liter |
26.100,00 |
261.000,00 |
|
|
|
|
Jumlah |
489.427,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
559.347,51 |
| 2019 | 24.3.2.15 | pekerjaan1 m2 atap pelana rangka atap baja ringan profil c 75 bahan atap genteng | M2 | 559.347,51 | Tidak Dipakai | |
628 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.16 |
pekerjaan1 m2 atap jurai rangka atap baja ringan canal c 75 bahan atap seng/spandek/zincalum |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.02 |
Orang Hari |
28.000,00 |
560,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.06 |
Orang Hari |
32.000,00 |
1.920,00 |
23.2.4.1.3.1 |
Tukang |
0.6 |
Orang Hari |
24.000,00 |
14.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.6 |
Orang Hari |
110.000,00 |
66.000,00 |
|
|
|
|
Jumlah |
82.880,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
3.372 |
Kg |
57.500,00 |
193.890,00 |
20.1.2.1.1.1 |
Solar |
1.67 |
liter |
7.800,00 |
13.026,00 |
|
|
|
|
Jumlah |
206.916,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
289.796,00 |
| 2019 | 24.3.2.16 | pekerjaan1 m2 atap jurai rangka atap baja ringan canal c 75 bahan atap seng/spandek/zincalum | M2 | 289.796,00 | Tidak Dipakai | |
629 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.17 |
pekerjaan1 m2 atap jural rangka atap baja ringan profil c 75 bahan atap genteng |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.02 |
Orang Hari |
28.000,00 |
560,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.06 |
Orang Hari |
32.000,00 |
1.920,00 |
23.2.4.1.3.1 |
Tukang |
0.06 |
Orang Hari |
24.000,00 |
1.440,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.6 |
Orang Hari |
110.000,00 |
66.000,00 |
|
|
|
|
Jumlah |
69.920,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.14.1.1 |
Electrode Las |
3.877 |
Kg |
57.500,00 |
222.927,51 |
20.1.2.1.1.1 |
Solar |
3.3 |
liter |
7.800,00 |
25.740,00 |
20.1.2.1.4.1 |
Minyak Pelumas |
12 |
liter |
26.100,00 |
313.200,00 |
|
|
|
|
Jumlah |
561.867,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
631.787,51 |
| 2019 | 24.3.2.17 | pekerjaan1 m2 atap jural rangka atap baja ringan profil c 75 bahan atap genteng | M2 | 631.787,51 | Tidak Dipakai | |
630 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.18 |
perbaikan sambungan (baut,cincin,pasak,dll) |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.2.1 |
Kepala Tukang |
0.03 |
Orang Hari |
32.000,00 |
960,00 |
23.2.4.1.3.1 |
Tukang |
0.09 |
Orang Hari |
24.000,00 |
2.160,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.09 |
Orang Hari |
110.000,00 |
9.900,00 |
|
|
|
|
Jumlah |
13.020,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
13.020,00 |
| 2019 | 24.3.2.18 | perbaikan sambungan (baut,cincin,pasak,dll) | Kg | 13.020,00 | Tidak Dipakai | |
631 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.19 |
perbaikan dan penggantian baja struktural |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.02 |
Orang Hari |
28.000,00 |
560,00 |
23.2.4.1.3.1 |
Tukang |
0.011 |
Orang Hari |
24.000,00 |
264,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.028 |
Orang Hari |
110.000,00 |
3.080,00 |
|
|
|
|
Jumlah |
3.904,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.6.2 |
Sewa Welding Set |
0.2 |
Hari |
31.900,00 |
6.380,00 |
|
|
|
|
Jumlah |
6.380,00 |
|
|
|
|
Nilai HSPK |
10.284,00 |
| 2019 | 24.3.2.19 | perbaikan dan penggantian baja struktural | Kg | 10.284,00 | Tidak Dipakai | |
632 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.20 |
ongkos pasang gelagar profil |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.05 |
Orang Hari |
28.000,00 |
1.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.001 |
Orang Hari |
110.000,00 |
110,00 |
|
|
|
|
Jumlah |
1.510,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.510,00 |
| 2019 | 24.3.2.20 | ongkos pasang gelagar profil | Kg | 1.510,00 | Tidak Dipakai | |
633 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.21 |
pemancangan tiang pancang baja diameter 600mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.1506 |
Orang Hari |
28.000,00 |
4.216,80 |
23.2.4.1.3.1 |
Tukang |
0.3012 |
Orang Hari |
24.000,00 |
7.228,80 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.2048 |
Orang Hari |
110.000,00 |
132.528,00 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
165.273,60 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.1506 |
jam |
85.200,00 |
12.831,12 |
|
|
|
|
Jumlah |
12.831,12 |
|
|
|
|
Nilai HSPK |
178.104,72 |
| 2019 | 24.3.2.21 | pemancangan tiang pancang baja diameter 600mm | M1 | 178.104,72 | Tidak Dipakai | |
634 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.22 |
pemancangan tiang panca baja diameter 600mm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
2.2.3.12.1.8 |
Pengadaan Alat Bantu Kegiatan Pemeliharaan |
1 |
unit |
200.000.000,00 |
200.000.000,00 |
|
|
|
|
Jumlah |
200.000.000,00 |
|
|
|
|
Nilai HSPK |
200.000.000,00 |
| 2019 | 24.3.2.22 | pemancangan tiang panca baja diameter 600mm | M1 | 200.000.000,00 | Tidak Dipakai | |
635 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.23 |
brojong dengan kawat yang dilapisi galvanis |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.5.4.1 |
Batu Pecah Mesin |
1.1 |
M3 |
487.900,00 |
536.690,01 |
20.1.1.35.2.7 |
kawat bronjong galvanis |
15 |
M2 |
266.800,00 |
4.002.000,00 |
|
|
|
|
Jumlah |
4.538.690,01 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
4.559.990,01 |
| 2019 | 24.3.2.23 | brojong dengan kawat yang dilapisi galvanis | M3 | 4.559.990,01 | Tidak Dipakai | |
636 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.24 |
expansion joint tipe baja bersudut |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.8.4.13 |
Pabrikasi/Elektroda Baja (20%) |
1 |
M2 |
35.100,00 |
35.100,00 |
|
|
|
|
Jumlah |
35.100,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
23.2.5.12.6.1 |
Sewa Alat Las |
1 |
Hari |
16.000,00 |
16.000,00 |
23.2.5.12.6.3 |
Sewa Las Potong |
1 |
Unit Hari |
800.000,00 |
800.000,00 |
|
|
|
|
Jumlah |
837.300,00 |
|
|
|
|
Nilai HSPK |
872.400,00 |
| 2019 | 24.3.2.24 | expansion joint tipe baja bersudut | M1 | 872.400,00 | Tidak Dipakai | |
637 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.25 |
perletakan elastomerik jenis2(400x450x48 |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
21.300,00 |
| 2019 | 24.3.2.25 | perletakan elastomerik jenis2(400x450x48 | buah | 21.300,00 | Tidak Dipakai | |
638 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.26 |
perletakan estomerik jenis 2(400x450) x48 |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
21.300,00 |
| 2019 | 24.3.2.26 | perletakan estomerik jenis 2(400x450) x48 | buah | 21.300,00 | Tidak Dipakai | |
639 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.27 |
pembongkaran rangka baja II |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1486 |
jam |
69.200,00 |
10.283,12 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.3333 |
jam |
608.800,00 |
202.913,04 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
0.3333 |
jam |
196.900,00 |
65.626,77 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
23.2.5.12.5.1 |
Sewa Compresor 250 CFM (Min 5 jam) |
0.3333 |
jam |
37.200,00 |
12.398,76 |
|
|
|
|
Jumlah |
312.521,69 |
|
|
|
|
Nilai HSPK |
312.521,69 |
| 2019 | 24.3.2.27 | pembongkaran rangka baja II | M2 | 312.521,69 | Tidak Dipakai | |
640 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.28 |
pembongkaran balok baja |
|
M |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.5.2 |
Sewa Trailer |
0.2 |
Hari |
4.863.636,00 |
972.727,21 |
23.2.5.11.3.1 |
Sewa Crane |
0.2 |
jam |
146.300,00 |
29.260,00 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
1.023.287,21 |
|
|
|
|
Nilai HSPK |
1.023.287,21 |
| 2019 | 24.3.2.28 | pembongkaran balok baja | M | 1.023.287,21 | Tidak Dipakai | |