Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 63,141-63,160 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
| 63141 | 2020 | 123.2.4.1.1.706 | Honorarium Pengantar Surat | Setwan | 1.300.000,00 | orang | Tidak Dipakai | |
| 63142 | 2020 | 123.2.4.1.1.707 | Jasa Kesenian HPS | | 1.500.000,00 | paket | Dipakai | |
| 63143 | 2020 | 123.2.4.1.1.708 | Operator Komputer | Setwan | 750.000,00 | orang | Dipakai | |
| 63144 | 2020 | 123.2.4.1.1.709 | Sewa Konseksi Internet Dedicated Bandwidth, IIX 50 Mbps | Setwan | 49.000.000,00 | Bulan | Dipakai | |
| 63145 | 2020 | 123.2.4.1.1.710 | Pembicara khusus | Setwan | 100.000.000,00 | paket | Dipakai | |
| 63146 | 2020 | 123.2.4.1.1.711 | Biaya Langganan TV Kabel | Setwan | 491.000,00 | titik | Dipakai | |
| 63147 | 2020 | 123.2.4.1.1.712 | Jasa Kebersihan Kantor, DPRD | Setwan | 2.400.000.000,00 | Tahun | Dipakai | |
| 63148 | 2020 | 123.2.4.1.1.713 | Tim Kesehatan | Setwan | 5.400.000,00 | orang | Tidak Dipakai | |
| 63149 | 2020 | 123.2.4.1.1.714 | Sewa Taman | Setwan | 300.000,00 | meter | Tidak Dipakai | |
| 63150 | 2020 | 123.2.4.1.1.715 | Narasumber/ Tenaga pakar/ Praktisi setingkat eselon II | Setwan | 1.700.000,00 | jam | Dipakai | |
| 63151 | 2020 | 123.2.4.1.1.716 | Narasumber/ Tenaga pakar/ Praktisi eselon III ke bawah | Setwan | 1.100.000,00 | jam | Dipakai | |
| 63152 | 2020 | 123.2.4.1.1.717 | Sewa LED | Setwan | 1.000.000,00 | meter | Tidak Dipakai | |
| 63153 | 2020 | 123.2.4.1.1.718 | Rehabilitasi pusat oleh-oleh kota medan | Rehab bangunan | 0,00 | paket | Tidak Dipakai | |
| 63154 | 2020 | 123.2.4.1.1.719 | Pemberitaan Surat kabar | Setwan | 1.000.000,00 | Kegiatan | Dipakai | |
| 63155 | 2020 | 123.2.4.1.1.720 | Sewa Sound System | Setwan | 1.000.000,00 | unit | Dipakai | |
| 63156 | 2020 | 123.2.4.1.1.721 | Pembicara khusus/ Live Motivator | Setwan | 15.000.000,00 | orang | Tidak Dipakai | |
| 63157 | 2020 | 123.2.4.1.1.722 | Pembuatan/Renovasi Taman Tipe A | DKPKM | 1.500.000.000,00 | Kegiatan | Dipakai | |
| 63158 | 2020 | 123.2.4.1.1.723 | Pembuatan/Renovasi Taman Tipe B | dkpkm | 200.000.000,00 | Kegiatan | Tidak Dipakai | |
| 63159 | 2020 | 123.2.4.1.1.724 | Pembuatan/Renovasi Taman Tipe C | DKPKM | 150.000.000,00 | Kegiatan | Dipakai | |
| 63160 | 2020 | 123.2.4.1.1.725 | Pembuatan/Renovasi Taman Tipe D | DKPKM | 100.000.000,00 | Kegiatan | Dipakai | |