601 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.100 |
laston lapis aus peratra (AC-WC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
62.83 |
Kg |
13.500,00 |
848.205,02 |
20.1.1.2.1.2 |
Semen Mortar |
9.87 |
kilogram |
103.251,00 |
1.019.087,36 |
|
|
|
|
Jumlah |
1.867.292,38 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0139 |
jam |
1.112.200,00 |
15.459,58 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0059 |
jam |
234.200,00 |
1.381,78 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0354 |
jam |
281.000,00 |
9.947,40 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
123.100,47 |
|
|
|
|
Nilai HSPK |
1.990.392,85 |
| 2019 | 24.3.1.100 | laston lapis aus peratra (AC-WC(L)) | ton | 1.990.392,85 | Tidak Dipakai | |
602 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.101 |
beton mutu rendah fc=10 Mpa untuk tutup drainase |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
311.06 |
kilogram |
103.251,00 |
32.117.255,81 |
20.1.1.4.4.1 |
Pasir Cor |
0.5113 |
M3 |
243.000,00 |
124.245,91 |
20.1.1.5.1.4 |
Agregat Kasar |
0.9053 |
M3 |
261.700,00 |
236.917,02 |
20.1.1.28.4.3 |
Paku Triplek/Eternit |
1.152 |
Kg |
23.000,00 |
26.496,00 |
20.1.1.43.3.1 |
Kayu Kamper |
0.144 |
M3 |
7.219.000,00 |
1.039.535,96 |
|
|
|
|
Jumlah |
33.544.450,68 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.0382 |
jam |
69.200,00 |
2.643,44 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.6849 |
jam |
69.200,00 |
47.395,08 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
71.338,52 |
|
|
|
|
Nilai HSPK |
33.615.789,20 |
| 2019 | 24.3.1.101 | beton mutu rendah fc=10 Mpa untuk tutup drainase | M3 | 33.615.789,20 | Tidak Dipakai | |
603 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.102 |
laston lapis aus modifikasi (AC-WC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.765 |
kilogram |
4.002,00 |
39.079,53 |
20.1.1.1.5.11 |
Aspal |
74.263 |
Kg |
13.750,00 |
1.021.116,26 |
|
|
|
|
Jumlah |
1.060.195,79 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.02 |
unit |
2.750.000,00 |
55.000,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0139 |
jam |
1.112.200,00 |
15.459,58 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0059 |
jam |
234.200,00 |
1.381,78 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0136 |
jam |
281.000,00 |
3.821,60 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
116.699,67 |
|
|
|
|
Nilai HSPK |
1.176.895,46 |
| 2019 | 24.3.1.102 | laston lapis aus modifikasi (AC-WC(L)) | ton | 1.176.895,46 | Tidak Dipakai | |
604 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.103 |
penyediaan unit pracetak gelagar tipe bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.103 | penyediaan unit pracetak gelagar tipe bentang 16 meter | buah | 229.858,35 | Tidak Dipakai | |
605 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.104 |
penyediaan unit percetakan gelagar 1 bentang 25 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.104 | penyediaan unit percetakan gelagar 1 bentang 25 meter | buah | 229.858,35 | Tidak Dipakai | |
606 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.105 |
laston lapis antara midifikasi(AC-BC mod) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.345 |
kilogram |
4.002,00 |
37.398,69 |
20.1.1.1.5.11 |
Aspal |
68.289 |
Kg |
13.750,00 |
938.973,77 |
|
|
|
|
Jumlah |
976.372,46 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0039 |
jam |
234.200,00 |
913,38 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.014,43 |
|
|
|
|
Nilai HSPK |
1.086.386,89 |
| 2019 | 24.3.1.105 | laston lapis antara midifikasi(AC-BC mod) | ton | 1.086.386,89 | Tidak Dipakai | |
607 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.106 |
pemasangan unit percetakan gelagar tipe u bentang 16 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.106 | pemasangan unit percetakan gelagar tipe u bentang 16 meter | buah | 229.858,35 | Tidak Dipakai | |
608 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.107 |
pemasangan unit percetakan gelagar tipe u bentang 11 meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.9009 |
jam |
146.300,00 |
131.801,67 |
23.2.5.11.3.2 |
Sewa Bucket dan Crane / Draglin Scraper |
0.9009 |
jam |
85.200,00 |
76.756,68 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
229.858,35 |
|
|
|
|
Nilai HSPK |
229.858,35 |
| 2019 | 24.3.1.107 | pemasangan unit percetakan gelagar tipe u bentang 11 meter | buah | 229.858,35 | Tidak Dipakai | |
609 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.108 |
laston lapis antaraperata (AC-BC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
57.68 |
Kg |
13.500,00 |
778.680,00 |
20.1.1.2.1.2 |
Semen Mortar |
9.45 |
kilogram |
103.251,00 |
975.721,93 |
|
|
|
|
Jumlah |
1.754.401,93 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.02 |
unit |
2.750.000,00 |
55.000,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0039 |
jam |
234.200,00 |
913,38 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
109.739,43 |
|
|
|
|
Nilai HSPK |
1.864.141,36 |
| 2019 | 24.3.1.108 | laston lapis antaraperata (AC-BC(L)) | ton | 1.864.141,36 | Tidak Dipakai | |
610 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.109 |
laston lapis antara modifikasi (AC-BC(L)) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.345 |
kilogram |
4.002,00 |
37.398,69 |
20.1.1.1.5.11 |
Aspal |
66.289 |
Kg |
13.750,00 |
911.473,77 |
|
|
|
|
Jumlah |
948.872,46 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0039 |
jam |
234.200,00 |
913,38 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.014,43 |
|
|
|
|
Nilai HSPK |
1.058.886,89 |
| 2019 | 24.3.1.109 | laston lapis antara modifikasi (AC-BC(L)) | ton | 1.058.886,89 | Tidak Dipakai | |
611 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.110 |
beton diafragma tepi125x124x20 |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.3.1 |
Sewa Crane |
0.7042 |
jam |
146.300,00 |
103.024,46 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
124.324,46 |
|
|
|
|
Nilai HSPK |
124.324,46 |
| 2019 | 24.3.1.110 | beton diafragma tepi125x124x20 | buah | 124.324,46 | Tidak Dipakai | |
612 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.111 |
laston lapis pondasi (AC.base) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.2 |
Aspal Panas |
49.44 |
Kg |
13.750,00 |
679.799,98 |
|
|
|
|
Jumlah |
679.799,98 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
790.118,87 |
| 2019 | 24.3.1.111 | laston lapis pondasi (AC.base) | ton | 790.118,87 | Tidak Dipakai | |
613 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.112 |
laston lapis pondasi modifikasi (AC base mod total harga (rp) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.1.2 |
Filler |
9.87 |
kilogram |
4.002,00 |
39.499,74 |
20.1.1.1.5.11 |
Aspal |
58.71 |
Kg |
13.750,00 |
807.262,49 |
|
|
|
|
Jumlah |
846.762,23 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
957.081,12 |
| 2019 | 24.3.1.112 | laston lapis pondasi modifikasi (AC base mod total harga (rp) | ton | 957.081,12 | Tidak Dipakai | |
614 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.113 |
laston lapis pondasi perata (ac base(l) |
|
ton |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
49.44 |
Kg |
13.500,00 |
667.439,98 |
20.1.1.2.1.2 |
Semen Mortar |
9.975 |
kilogram |
103.251,00 |
1.029.928,76 |
|
|
|
|
Jumlah |
1.697.368,75 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.1205 |
jam |
69.200,00 |
8.338,60 |
23.2.5.11.5.2 |
Sewa Genset |
0.0201 |
unit |
2.750.000,00 |
55.275,00 |
23.2.5.11.6.2 |
Sewa Ashpalt Finisher |
0.0092 |
jam |
1.112.200,00 |
10.232,24 |
23.2.5.11.6.3 |
Sewa Pneumatic Tire Roller |
0.0052 |
jam |
234.200,00 |
1.217,84 |
23.2.5.11.6.4 |
Sewa Tandem Roller |
0.0091 |
jam |
281.000,00 |
2.557,10 |
23.2.5.11.6.6 |
Sewa Amp 10 T |
0.0201 |
jam |
276.300,00 |
5.553,63 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0096 |
jam |
608.800,00 |
5.844,48 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
110.318,89 |
|
|
|
|
Nilai HSPK |
1.807.687,63 |
| 2019 | 24.3.1.113 | laston lapis pondasi perata (ac base(l) | ton | 1.807.687,63 | Tidak Dipakai | |
615 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.114 |
campuran aspal dingin untuk pelapisan I |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.1.6.1 |
Aspal Panas |
153.3 |
Kg |
13.500,00 |
2.069.550,04 |
|
|
|
|
Jumlah |
2.069.550,04 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.3058 |
jam |
69.200,00 |
21.161,36 |
23.2.5.11.8.1 |
Sewa Vibrator Roller |
0.0241 |
jam |
143.700,00 |
3.463,17 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.0803 |
jam |
69.200,00 |
5.556,76 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
51.481,29 |
|
|
|
|
Nilai HSPK |
2.121.031,33 |
| 2019 | 24.3.1.114 | campuran aspal dingin untuk pelapisan I | M3 | 2.121.031,33 | Tidak Dipakai | |
616 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.1 |
Pekerjaan Pemasangan Besi Profil |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.1 | Pekerjaan Pemasangan Besi Profil | ikat | 0,00 | Tidak Dipakai | |
617 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.2 |
Pekerjaan Pengelasan dengan las listrik |
|
set m |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.2 | Pekerjaan Pengelasan dengan las listrik | set m | 0,00 | Tidak Dipakai | |
618 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.4 |
Perbaikan Sambungan (Baut, Cincin, Pasak, dll) |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.4 | Perbaikan Sambungan (Baut, Cincin, Pasak, dll) | ikat | 0,00 | Tidak Dipakai | |
619 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.7 |
Pekerjaan Pemasangan Baut Mur Baja |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.7 | Pekerjaan Pemasangan Baut Mur Baja | ikat | 0,00 | Tidak Dipakai | |
620 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.2.8 |
Pekerjaan Fabrikasi dan Elektroda Besi Siku |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.2.8 | Pekerjaan Fabrikasi dan Elektroda Besi Siku | ikat | 0,00 | Tidak Dipakai | |