601 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.8 |
Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.0044 |
M1 |
113.758,40 |
500,54 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.0108 |
M3 |
118.270,00 |
1.277,32 |
24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
0.1 |
M3 |
427.689,23 |
42.768,92 |
24.1.2.22 |
- |
Penimbunan dengan Sirtu |
0.3 |
M3 |
281.590,28 |
84.477,09 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
0.0107 |
M3 |
837.121,22 |
8.957,20 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.0035 |
M3 |
1.943.652,28 |
6.802,78 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.062 |
M2 |
99.416,60 |
6.163,83 |
24.1.6.25 |
- |
Pemasangan acian |
0.0621 |
M2 |
60.790,00 |
3.775,06 |
24.1.7.8 |
- |
Pengecatan Besi |
0.002 |
M2 |
53.052,00 |
106,10 |
24.1.7.10 |
- |
Pengecatan Dasar Meni Besi |
0.002 |
M2 |
50.512,00 |
101,02 |
24.2.2.70 |
- |
Pengecatan dengan Cat Road Line |
0.005 |
M2 |
87.985,00 |
439,92 |
24.2.6.9 |
- |
Menanam Rumput Bermuda |
1 |
M2 |
38.618,00 |
38.618,00 |
117.1.1.1.5.48 |
- |
Batu Pecah 5-7 cm |
0.0081 |
M3 |
466.900,00 |
3.781,89 |
117.2.2.6.1.18 |
- |
Pipa PVC uk.4 inchi Pj.4 m |
0.08 |
batang |
93.400,00 |
7.472,00 |
|
|
|
|
|
Nilai ASB |
217.951,68 |
| 2020 | 28.3.1.8.1 | Pembangunan Lapangan Olahraga Sepak Bola Konvensional ukuran 50m x 100m | M2 | 217.951,68 | (belum diset) | |
602 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.9 |
Pembangunan Lapangan Olahraga Tenis dan Pagar |
|
|
Titik |
|
|
24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1 |
M1 |
113.758,40 |
11.375,84 |
24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.002 |
M3 |
85.740,00 |
171,48 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0007 |
M3 |
471.628,02 |
330,14 |
24.1.3.13 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 5 Ps) |
0.06 |
M3 |
1.324.364,43 |
79.461,86 |
24.1.3.15 |
- |
Pemasangan Batu Kali Kosongan (aanstamping) |
0.02 |
M3 |
837.121,22 |
16.742,42 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.0006 |
M3 |
568.825,93 |
341,30 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.1 |
M3 |
1.943.652,28 |
194.365,23 |
24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.005 |
M3 |
6.383.804,41 |
31.919,02 |
24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.28 |
M2 |
99.416,60 |
27.836,65 |
24.1.6.25 |
- |
Pemasangan acian |
0.28 |
M2 |
60.790,00 |
17.021,20 |
24.1.8.19 |
- |
Pembuatan/Pemasangan Hardener Floor (Granit Trase Corak) |
1 |
M2 |
75.971,20 |
75.971,20 |
24.1.10.37 |
- |
Pemasangan Kawat Harmonika |
0.76 |
M2 |
155.487,14 |
118.170,23 |
24.1.11.2 |
- |
Pemasangan Titik Lampu Gedung |
0.01 |
titik |
164.792,00 |
1.647,92 |
117.1.1.1.16.14 |
- |
Plat Strip uk 3x 40 mm |
0.71 |
M |
55.800,00 |
39.618,00 |
|
|
|
|
|
Nilai ASB |
627.682,49 |
| 2020 | 28.3.1.9.1 | Pembangunan Lapangan Olahraga Tenis dan Pagar | M2 | 627.682,49 | (belum diset) | |
603 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.3.1.10 |
Sumur Buis Beton diameter 80 cm |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1 |
M3 |
157.417,60 |
157.417,60 |
24.1.2.17 |
- |
Pengangkutan Tanah dari Lubang Galian yg dalamnya > 1 m |
1 |
M3 |
40.285,00 |
40.285,00 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.01 |
M3 |
1.943.652,28 |
19.436,52 |
117.1.1.1.22.468 |
- |
Riol Beton |
2 |
buah |
748.400,00 |
1.496.800,00 |
|
|
|
|
|
Nilai ASB |
1.713.939,12 |
| 2020 | 28.3.1.10.1 | Sumur Buis Beton diameter 80 cm | titik | 1.713.939,12 | (belum diset) | |
604 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.1 |
Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
|
|
|
|
|
Nilai ASB |
233.238,27 |
| 2020 | 28.4.1.1.1 | Rambu Lalu Lintas (75 cm) Engineering Grade papan tambahan dan umpak beton | unit | 233.238,27 | (belum diset) | |
605 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.2 |
Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.2.1 | Rambu Lalu Lintas (60 cm) Engineering Grade papan tambahan dan umpak beton | unit | 1.319.390,31 | (belum diset) | |
606 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.3 |
Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.892.637,14 |
| 2020 | 28.4.1.3.1 | Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.892.637,14 | (belum diset) | |
607 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.4 |
Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.12 |
M3 |
1.943.652,28 |
233.238,27 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.319.390,31 |
| 2020 | 28.4.1.4.1 | Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan dan Umpak Beton | unit | 1.319.390,31 | (belum diset) | |
608 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.5 |
Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.5.1 | Daun Rambu Lalu Lintas (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
609 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.6 |
Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.6.1 | Daun Rambu Lalu Lintas (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
610 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.7 |
Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.825 |
M2 |
2.011.392,60 |
1.659.398,87 |
|
|
|
|
|
Nilai ASB |
1.659.398,87 |
| 2020 | 28.4.1.7.1 | Daun Rambu Lalu Lintas ACP (75 cm) Engineering Grade + Papan Tambahan | unit | 1.659.398,87 | (belum diset) | |
611 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.54 |
M2 |
2.011.392,60 |
1.086.152,05 |
|
|
|
|
|
Nilai ASB |
1.086.152,05 |
| 2020 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 1.086.152,05 | (belum diset) | |
612 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.36 |
M2 |
2.011.392,60 |
724.101,36 |
|
|
|
|
|
Nilai ASB |
724.101,36 |
| 2020 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 724.101,36 | (belum diset) | |
613 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
24.1.5.2 |
- |
Pekerjaan Pengelasan dengan las listrik |
6.8 |
cm |
37.096,20 |
252.254,16 |
|
|
|
|
|
Nilai ASB |
252.254,16 |
| 2020 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 252.254,16 | (belum diset) | |
614 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
1.47 |
M3 |
157.417,60 |
231.403,88 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.85 |
M3 |
1.943.652,28 |
1.652.104,48 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
68.82 |
kilogram |
23.886,93 |
1.643.898,47 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
24.2.2.53 |
- |
Pemasangan Tiang Oktagonal 7 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
4.389.559,00 |
4.389.559,00 |
|
|
|
|
|
Nilai ASB |
20.217.380,06 |
| 2020 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 20.217.380,06 | (belum diset) | |
615 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
6 |
M2 |
2.011.392,60 |
12.068.355,59 |
|
|
|
|
|
Nilai ASB |
12.068.355,59 |
| 2020 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 12.068.355,59 | (belum diset) | |
616 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
4.32 |
M2 |
2.011.392,60 |
8.689.216,37 |
|
|
|
|
|
Nilai ASB |
12.010.398,39 |
| 2020 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 12.010.398,39 | (belum diset) | |
617 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.945 |
M3 |
157.417,60 |
148.759,63 |
24.1.3.24 |
- |
Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m |
1 |
titik |
232.058,65 |
232.058,65 |
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.8 |
M3 |
1.943.652,28 |
1.554.921,85 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
58 |
kilogram |
23.886,93 |
1.385.441,90 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
2.47 |
M2 |
2.011.392,60 |
4.968.139,77 |
24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
|
|
|
|
|
Nilai ASB |
11.944.380,80 |
| 2020 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 11.944.380,80 | (belum diset) | |
618 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.075 |
M3 |
1.943.652,28 |
145.773,93 |
|
|
|
|
|
Nilai ASB |
145.773,93 |
| 2020 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 145.773,93 | (belum diset) | |
619 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
|
|
|
|
|
Nilai ASB |
680.278,29 |
| 2020 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 680.278,29 | (belum diset) | |
620 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
24.1.4.23 |
- |
Beton mutu f'c 19,3 Mpa (K-225), slump (12±2) cm. w/c=0,58, dengan Molen |
0.35 |
M3 |
1.943.652,28 |
680.278,29 |
24.1.8.20 |
- |
Pemasangan Alumunium Composite Panel (ACP) |
0.72 |
M2 |
2.011.392,60 |
1.448.202,73 |
|
|
|
|
|
Nilai ASB |
2.128.481,01 |
| 2020 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 2.128.481,01 | (belum diset) | |