24.3.1.60 |
pemasangan batu |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
151.2 |
kilogram |
103.251,00 |
15.611.550,88 |
20.1.1.4.4.1 |
Pasir Cor |
0.4362 |
M3 |
243.000,00 |
105.996,60 |
20.1.1.5.7.19 |
Batu Kali |
1.26 |
M3 |
254.462,00 |
320.622,12 |
|
|
|
|
Jumlah |
16.038.169,60 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.0014 |
jam |
69.200,00 |
96,88 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.6849 |
jam |
69.200,00 |
47.395,08 |
|
|
|
|
Jumlah |
47.491,96 |
|
|
|
|
Nilai HSPK |
16.085.661,56 |
| 2019 | 24.3.1.60 | pemasangan batu | M3 | 16.085.661,56 | Tidak Dipakai | |
562 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.61 |
pasangan batu |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
121.2 |
kilogram |
103.251,00 |
12.514.020,88 |
20.1.1.4.1.1 |
Pasir Urug |
0.4362 |
M3 |
264.236,00 |
115.259,74 |
20.1.1.5.7.19 |
Batu Kali |
1.26 |
M3 |
254.462,00 |
320.622,12 |
|
|
|
|
Jumlah |
12.949.902,74 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.0014 |
jam |
69.200,00 |
96,88 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.6849 |
jam |
69.200,00 |
47.395,08 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
68.791,96 |
|
|
|
|
Nilai HSPK |
13.018.694,70 |
| 2019 | 24.3.1.61 | pasangan batu | M3 | 13.018.694,70 | Tidak Dipakai | |
563 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.62 |
pasang batu kosong yang diisi adukan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.1 |
Semen PC |
2 |
Zak |
60.700,00 |
121.400,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.2181 |
M3 |
243.000,00 |
52.998,30 |
20.1.1.5.1.4 |
Agregat Kasar |
0.2829 |
M3 |
261.700,00 |
74.034,93 |
20.1.1.5.3.1 |
Batu Kali Belah |
1.32 |
0,6M3 |
448.100,00 |
591.492,02 |
|
|
|
|
Jumlah |
839.925,25 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.0014 |
jam |
69.200,00 |
96,88 |
23.2.5.11.9.1 |
Sewa Concrete Mixer |
0.6849 |
jam |
69.200,00 |
47.395,08 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
68.791,96 |
|
|
|
|
Nilai HSPK |
908.717,21 |
| 2019 | 24.3.1.62 | pasang batu kosong yang diisi adukan | M3 | 908.717,21 | Tidak Dipakai | |
564 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.63 |
pemasangan batu kosong |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.5.3.1 |
Batu Kali Belah |
1.1 |
0,6M3 |
448.100,00 |
492.910,01 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
514.210,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
514.210,01 |
| 2019 | 24.3.1.63 | pemasangan batu kosong | M3 | 514.210,01 | Tidak Dipakai | |
565 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.64 |
sandaran (railing) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.27.5.1 |
Baut |
0.75 |
pc |
23.500,00 |
17.625,00 |
|
|
|
|
Jumlah |
17.625,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
38.925,00 |
| 2019 | 24.3.1.64 | sandaran (railing) | M1 | 38.925,00 | Tidak Dipakai | |
566 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.65 |
papan nama jembatan |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.22.1.2 |
Keramik Lantai putih |
0.75 |
M2 |
82.700,00 |
62.025,00 |
|
|
|
|
Jumlah |
62.025,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
21.300,00 |
|
|
|
|
Nilai HSPK |
83.325,00 |
| 2019 | 24.3.1.65 | papan nama jembatan | buah | 83.325,00 | Tidak Dipakai | |
567 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.66 |
pembongkaran pasangan batu |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.4608 |
jam |
69.200,00 |
31.887,36 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0098 |
jam |
608.800,00 |
5.966,24 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
1.2048 |
jam |
196.900,00 |
237.225,12 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
|
|
|
|
Jumlah |
296.378,72 |
|
|
|
|
Nilai HSPK |
296.378,72 |
| 2019 | 24.3.1.66 | pembongkaran pasangan batu | M3 | 296.378,72 | Tidak Dipakai | |
568 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.67 |
pembongkaran beton II |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.4098 |
jam |
69.200,00 |
28.358,16 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.0098 |
jam |
608.800,00 |
5.966,24 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
0.6024 |
jam |
196.900,00 |
118.612,56 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
23.2.5.12.5.1 |
Sewa Compresor 250 CFM (Min 5 jam) |
0.6024 |
jam |
37.200,00 |
22.409,28 |
|
|
|
|
Jumlah |
196.646,24 |
|
|
|
|
Nilai HSPK |
196.646,24 |
| 2019 | 24.3.1.67 | pembongkaran beton II | M3 | 196.646,24 | Tidak Dipakai | |
569 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.68 |
pembongkaran beton pratekan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.4386 |
jam |
69.200,00 |
30.351,12 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.2 |
jam |
608.800,00 |
121.760,00 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
0.2 |
jam |
196.900,00 |
39.380,00 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
23.2.5.12.5.1 |
Sewa Compresor 250 CFM (Min 5 jam) |
0.2 |
jam |
37.200,00 |
7.440,00 |
|
|
|
|
Jumlah |
220.231,12 |
|
|
|
|
Nilai HSPK |
220.231,12 |
| 2019 | 24.3.1.68 | pembongkaran beton pratekan | M3 | 220.231,12 | Tidak Dipakai | |
570 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.69 |
pembongkaran bangunan gedung |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.2331 |
jam |
69.200,00 |
16.130,52 |
23.2.5.11.7.1 |
Sewa Wheel Loader |
0.05 |
jam |
608.800,00 |
30.440,00 |
23.2.5.11.10.1 |
Sewa Hammer Tiang Pancang |
0.05 |
jam |
196.900,00 |
9.845,00 |
23.2.5.12.1.1 |
Sewa Alat Bantu Pembuatan Aspal Emulsi |
1 |
LS |
21.300,00 |
21.300,00 |
23.2.5.12.5.1 |
Sewa Compresor 250 CFM (Min 5 jam) |
0.05 |
jam |
37.200,00 |
1.860,00 |
|
|
|
|
Jumlah |
79.575,52 |
|
|
|
|
Nilai HSPK |
79.575,52 |
| 2019 | 24.3.1.69 | pembongkaran bangunan gedung | M2 | 79.575,52 | Tidak Dipakai | |
571 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.70 |
Beton Mutu Tinggi Fc 50 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.70 | Beton Mutu Tinggi Fc 50 Mpa | M3 | 0,00 | Tidak Dipakai | |
572 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.71 |
Beton Mutu Tinggi Fc 45 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.71 | Beton Mutu Tinggi Fc 45 Mpa | M3 | 0,00 | Tidak Dipakai | |
573 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.72 |
Beton Bermutu Tinggi Fc 40 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.72 | Beton Bermutu Tinggi Fc 40 Mpa | M3 | 0,00 | Tidak Dipakai | |
574 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.73 |
Beton Mutu Tinggi Fc 35 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.73 | Beton Mutu Tinggi Fc 35 Mpa | M3 | 0,00 | Tidak Dipakai | |
575 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.74 |
Beton Mutu Sedang Fc 30 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.74 | Beton Mutu Sedang Fc 30 Mpa | M3 | 0,00 | Tidak Dipakai | |
576 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.75 |
Beton Mutu Sedang Fc 25 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.75 | Beton Mutu Sedang Fc 25 Mpa | M3 | 0,00 | Tidak Dipakai | |
577 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.76 |
Beton Mutu Sedang Fc 20 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.76 | Beton Mutu Sedang Fc 20 Mpa | M3 | 0,00 | Tidak Dipakai | |
578 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.77 |
Beton Mutu Sedang Fc 20 Mpa (Untuk Box Culvert) |
|
M2 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.77 | Beton Mutu Sedang Fc 20 Mpa (Untuk Box Culvert) | M2 | 0,00 | Tidak Dipakai | |
579 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.78 |
Beton Mutu Rendah Fc 15 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.78 | Beton Mutu Rendah Fc 15 Mpa | M3 | 0,00 | Tidak Dipakai | |
580 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.79 |
Beton Siklop Fc 15Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.79 | Beton Siklop Fc 15Mpa | M3 | 0,00 | Tidak Dipakai | |