| 561 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.146 |
Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Tanam Oktagonal |
|
|
Titik |
|
|
| 24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
| 24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.43 |
- |
Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
2.642.075,00 |
2.642.075,00 |
| 24.2.2.51 |
- |
Pemasangan Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
3.655.059,00 |
3.655.059,00 |
| 117.1.3.8.1.47 |
- |
Kabel NYM 3 x 2,5 mm |
0.14 |
Roll |
858.100,00 |
120.134,00 |
|
|
|
|
|
Nilai ASB |
8.216.074,10 |
| 2020 | 27.1.1.146.1 | Pemasangan Lampu HPS 150 W - 1 Phase - Tiang Tanam Oktagonal | titik | 8.216.074,10 | (belum diset) | |
| 562 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.148 |
Pemasangan Tiang PJU cab 1 |
|
|
Titik |
|
|
| 24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
| 24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
| 24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
18 |
M |
10.550.159,81 |
189.902.876,58 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
1 |
unit |
288.360,00 |
288.360,00 |
| 24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
1 |
unit |
218.975,00 |
218.975,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 24.2.2.55 |
- |
Pemasangan Tiang Oktagonal 9 m Single Hot Dipped Galvanized dengan Flenders |
1 |
unit |
6.994.859,00 |
6.994.859,00 |
|
|
|
|
|
Nilai ASB |
200.275.449,08 |
| 2020 | 27.1.1.148.1 | Pemasangan Tiang PJU cab 1 | titik | 200.275.449,08 | (belum diset) | |
| 563 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.149 |
Pemasangan Tiang PJU cab 2 |
|
|
Titik |
|
|
| 24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
| 24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
| 24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.44 |
- |
Pemasangan Lampu HPS 250 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor |
2 |
unit |
218.975,00 |
437.950,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.149.1 | Pemasangan Tiang PJU cab 2 | titik | 24.557.933,31 | (belum diset) | |
| 564 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.151 |
Pemasangan Tiang Dekoratif Cab 1 |
|
|
Titik |
|
|
| 24.2.2.22 |
- |
Instalasi 1 Titik Lampu PJU (Tarikan Udara) 18 m |
1 |
M |
10.550.159,81 |
10.550.159,81 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
14.313.060,91 |
| 2020 | 27.1.1.151.1 | Pemasangan Tiang Dekoratif Cab 1 | titik | 14.313.060,91 | (belum diset) | |
| 565 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.152 |
Pemasangan Tiang Dekoratif Cab 2 |
|
|
Titik |
|
|
| 24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 117.1.3.8.1.26 |
- |
Kabel NYFGbY 3 x 4 mm |
50 |
meter |
49.400,00 |
2.470.000,00 |
|
|
|
|
|
Nilai ASB |
19.291.510,91 |
| 2020 | 27.1.1.152.1 | Pemasangan Tiang Dekoratif Cab 2 | titik | 19.291.510,91 | (belum diset) | |
| 566 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.154 |
Pemasangan PJU dengan kabel tanah |
|
|
Titik |
|
|
| 24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
| 24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
| 24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.119.983,31 |
| 2020 | 27.1.1.154.1 | Pemasangan PJU dengan kabel tanah | titik | 24.119.983,31 | (belum diset) | |
| 567 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.1.1.155 |
Pemasangan PJU dengan kabel tanah dan Lampu LED |
|
|
Titik |
|
|
| 24.2.2.1 |
- |
Pemasangan Konektor Kabel |
2 |
buah |
1.661,45 |
3.322,90 |
| 24.2.2.14 |
- |
Pemasangan / Penarikan Kabel NFA2X (Twisted) 4 x 16 mm |
50 |
M |
32.059,81 |
1.602.990,50 |
| 24.2.2.23 |
- |
Instalasi 1 Titik Lampu (Tarikan Udara) 26,5 m |
1 |
M |
15.528.609,81 |
15.528.609,81 |
| 24.2.2.28 |
- |
Perakitan dan Pemasangan Panel Lampu PJU - 1 Phase 2200VA |
0.1 |
unit |
1.636.566,95 |
163.656,70 |
| 24.2.2.40 |
- |
Pemasangan Panel Meter 1 Phase |
0.1 |
unit |
288.360,00 |
28.836,00 |
| 24.2.2.47 |
- |
Pemasangan Lampu Jalan Raya LED |
2 |
unit |
218.975,00 |
437.950,00 |
| 24.2.2.49 |
- |
Pondasi Strous PJU |
1 |
titik |
1.100.408,40 |
1.100.408,40 |
| 24.2.2.56 |
- |
Pemasangan Tiang Oktagonal 9 m Double Hot Dipped Galvanized dengan Flenders |
1 |
unit |
5.692.159,00 |
5.692.159,00 |
|
|
|
|
|
Nilai ASB |
24.557.933,31 |
| 2020 | 27.1.1.155.1 | Pemasangan PJU dengan kabel tanah dan Lampu LED | titik | 24.557.933,31 | (belum diset) | |
| 568 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.1 |
Rotonde |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.1.1.1 | Rotonde | M2 | 0,00 | (belum diset) | |
| 569 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.2 |
PEMBUATAN TAMAN TYPE A |
|
|
Titik |
|
|
| 24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.25 |
M3 |
238.608,00 |
59.652,00 |
| 24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
| 24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
| 24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
| 24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
| 117.1.1.1.4.12 |
- |
Tanah Humus |
0.1156 |
M3 |
266.800,00 |
30.842,08 |
| 117.1.1.8.3.158 |
- |
Ekor Tupai |
2.2 |
Pohon |
40.100,00 |
88.220,00 |
| 117.1.1.8.3.162 |
- |
Flamboyan (2 - 3 m) |
0.01 |
Pohon |
667.000,00 |
6.670,00 |
| 117.1.1.8.3.209 |
- |
Lili Paris |
8.75 |
Polibeg |
6.700,00 |
58.625,00 |
| 117.1.1.8.3.283 |
- |
Pupuk kandang |
0.0375 |
Sak |
33.400,00 |
1.252,50 |
| 117.1.1.8.3.308 |
- |
Rumput Gajah Mini Varigata |
0.4 |
M2 |
13.400,00 |
5.360,00 |
|
|
|
|
|
Nilai ASB |
330.984,42 |
| 2020 | 27.2.1.2.1 | PEMBUATAN TAMAN TYPE A | M2 | 330.984,42 | (belum diset) | |
| 570 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.3 |
PEMBUATAN TAMAN TYPE B |
|
|
Titik |
|
|
| 24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
| 24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
| 24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
| 24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
|
|
|
|
|
Nilai ASB |
80.362,84 |
| 2020 | 27.2.1.3.1 | PEMBUATAN TAMAN TYPE B | M2 | 80.362,84 | (belum diset) | |
| 571 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.4 |
PEMBUATAN TAMAN TYPE C |
|
|
Titik |
|
|
| 24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
| 24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
|
|
|
|
|
Nilai ASB |
39.349,64 |
| 2020 | 27.2.1.4.1 | PEMBUATAN TAMAN TYPE C | M2 | 39.349,64 | (belum diset) | |
| 572 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.5 |
Pemeliharaan Air Mancur |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.1.5.1 | Pemeliharaan Air Mancur | M2 | 0,00 | (belum diset) | |
| 573 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.1.6 |
Pembuatan Taman Mini |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.1.6.1 | Pembuatan Taman Mini | M2 | 0,00 | (belum diset) | |
| 574 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.1 |
PEMELIHARAAN TAMAN DAN JALUR HIJAU |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2020 | 27.2.2.1.1 | PEMELIHARAAN TAMAN DAN JALUR HIJAU | M2 | 0,00 | (belum diset) | |
| 575 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.2 |
PEMELIHARAAN TAMAN REKREASI |
|
|
Titik |
|
|
| 24.1.2.4 |
- |
Penggalian Tanah Cadas/Rabat sedalam s.d. 1 m |
0.15 |
M3 |
238.608,00 |
35.791,20 |
| 24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.025 |
M3 |
471.628,02 |
11.790,70 |
| 24.1.6.8 |
- |
Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata |
0.05 |
M2 |
150.726,50 |
7.536,33 |
| 24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
0.32 |
M2 |
99.416,60 |
31.813,31 |
| 24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
|
|
|
|
|
Nilai ASB |
116.154,04 |
| 2020 | 27.2.2.2.1 | PEMELIHARAAN TAMAN REKREASI | M2 | 116.154,04 | (belum diset) | |
| 576 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.3 |
SISTEM PENYIRAMAN TAMAN (SPRINKLER) |
|
|
Titik |
|
|
| 24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.1 |
M1 |
113.758,40 |
11.375,84 |
| 24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.15 |
M3 |
118.270,00 |
17.740,50 |
| 24.1.4.57 |
- |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
0.0032 |
M3 |
6.383.804,41 |
20.428,17 |
| 24.1.4.74 |
- |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
0.0016 |
M3 |
8.648.594,42 |
13.837,75 |
| 24.1.12.8 |
- |
Pemasangan Saluran Pipa diameter ¾'' |
0.4 |
meter |
29.478,24 |
11.791,30 |
| 24.1.12.9 |
- |
Pemasangan Saluran Pipa diameter 1'' |
0.4 |
meter |
31.098,24 |
12.439,30 |
| 24.1.12.11 |
- |
Pemasangan Saluran Pipa diameter 2'' |
0.01 |
meter |
54.822,36 |
548,22 |
| 117.1.3.8.1.64 |
- |
Kabel NYY 2 x 25 mm |
0.4 |
meter |
146.800,00 |
58.720,00 |
|
|
|
|
|
Nilai ASB |
146.881,08 |
| 2020 | 27.2.2.3.1 | SISTEM PENYIRAMAN TAMAN (SPRINKLER) | M2 | 146.881,08 | (belum diset) | |
| 577 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.4 |
Pengurugan Lahan Makam Dengan Tanah |
|
|
Titik |
|
|
| 24.1.2.13 |
- |
Penimbunan tanah, Perataan dan Pemadatan menggunakan Alat Berat |
1 |
M3 |
427.689,23 |
427.689,23 |
|
|
|
|
|
Nilai ASB |
427.689,23 |
| 2020 | 27.2.2.4.1 | Pengurugan Lahan Makam Dengan Tanah | M3 | 427.689,23 | (belum diset) | |
| 578 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.5 |
Pengurugan Lahan Makam Dengan Sirtu |
|
|
Titik |
|
|
| 24.1.2.22 |
- |
Penimbunan dengan Sirtu |
1 |
M3 |
281.590,28 |
281.590,28 |
|
|
|
|
|
Nilai ASB |
281.590,28 |
| 2020 | 27.2.2.5.1 | Pengurugan Lahan Makam Dengan Sirtu | M3 | 281.590,28 | (belum diset) | |
| 579 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.6 |
Rehabilitasi Pagar Makam Dengan Precast Pagar Panel / Pabrikasi |
|
|
Titik |
|
|
| 24.1.1.7 |
- |
Pembersihan Lapangan "Ringan" dan Perataan |
1 |
M2 |
12.710,00 |
12.710,00 |
| 24.1.1.13 |
- |
Pekerjaan Pembongkaran Dinding Tembok Bata |
0.1017 |
M3 |
1.074.247,97 |
109.251,02 |
| 24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.15 |
M3 |
9.262.468,50 |
1.389.370,33 |
|
|
|
|
|
Nilai ASB |
1.511.331,35 |
| 2020 | 27.2.2.6.1 | Rehabilitasi Pagar Makam Dengan Precast Pagar Panel / Pabrikasi | M1 | 1.511.331,35 | (belum diset) | |
| 580 |
| NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 27.2.2.7 |
Pembuatan Pagar Dinding Makam |
|
|
Titik |
|
|
| 24.1.1.4 |
- |
Pengukuran dan Pembuatan Bouwplank |
0.6 |
M1 |
113.758,40 |
68.255,04 |
| 24.1.2.1 |
- |
Penggalian Tanah Biasa sedalam s.d. 1 m untuk Konstruksi |
0.6 |
M3 |
118.270,00 |
70.962,00 |
| 24.1.2.9 |
- |
Penimbunan kembali Tanah Galian |
0.6 |
M3 |
85.740,00 |
51.444,00 |
| 24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.047 |
M3 |
471.628,02 |
22.166,52 |
| 24.1.3.2 |
- |
Pemasangan Turap Bambu tinggi 1,5 m |
1 |
M1 |
295.947,08 |
295.947,08 |
| 24.1.3.12 |
- |
Pekerjaan Pemasangan Batu Kali (1 Pc : 4 Ps) |
0.1682 |
M3 |
1.390.242,02 |
233.838,71 |
| 24.1.3.23 |
- |
Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m |
0.355 |
titik |
193.385,05 |
68.651,69 |
| 24.1.4.60 |
- |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
0.0117 |
M3 |
7.944.915,55 |
92.955,51 |
| 24.1.4.64 |
- |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
0.0117 |
M3 |
10.149.718,50 |
118.751,70 |
| 24.1.4.65 |
- |
Pekerjaan Balok Beton Bertulang (150 kg besi + Bekisting) |
0.0058 |
M3 |
9.262.468,50 |
53.722,32 |
| 24.1.6.7 |
- |
Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata |
1 |
M2 |
155.098,30 |
155.098,30 |
| 24.1.6.18 |
- |
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm |
6 |
M2 |
99.416,60 |
596.499,61 |
| 24.1.6.26 |
- |
Pasang Benangan 1 Pc: 2Ps |
8 |
M |
40.230,50 |
321.844,00 |
| 24.1.7.12 |
- |
Pengecatan Dinding Luar Baru |
0 |
M2 |
57.917,56 |
0,00 |
|
|
|
|
|
Nilai ASB |
2.150.136,48 |
| 2020 | 27.2.2.7.1 | Pembuatan Pagar Dinding Makam | M1 | 2.150.136,48 | (belum diset) | |