541 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.40 |
pekerjaan beton mutu F'c 16,9 Mpa (K-200), slumd (12±2) cm. w/c=0,61 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
352 |
kilogram |
103.251,00 |
36.344.352,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.522 |
M3 |
243.000,00 |
126.846,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.764 |
M3 |
487.900,00 |
372.755,60 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
36.849.973,60 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
37.041.293,60 |
| 2019 | 24.3.1.40 | pekerjaan beton mutu F'c 16,9 Mpa (K-200), slumd (12±2) cm. w/c=0,61 | M3 | 37.041.293,60 | Tidak Dipakai | |
542 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.41 |
pekerjaan beton mutu F'c 19,3 Mpa (K-225), slumd (12±2) cm. w/c=0,58 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
371 |
kilogram |
103.251,00 |
38.306.121,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.499 |
M3 |
243.000,00 |
121.257,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.776 |
M3 |
487.900,00 |
378.610,41 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
38.812.008,41 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
39.003.328,41 |
| 2019 | 24.3.1.41 | pekerjaan beton mutu F'c 19,3 Mpa (K-225), slumd (12±2) cm. w/c=0,58 | M3 | 39.003.328,41 | Tidak Dipakai | |
543 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.42 |
pekerjaan beton mutu F'c 21,7 Mpa (K-250), slumd (12±2) cm. w/c=0,56 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
384 |
kilogram |
103.251,00 |
39.648.384,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.494 |
M3 |
243.000,00 |
120.042,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.77 |
M3 |
487.900,00 |
375.682,99 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
40.150.128,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
40.341.448,99 |
| 2019 | 24.3.1.42 | pekerjaan beton mutu F'c 21,7 Mpa (K-250), slumd (12±2) cm. w/c=0,56 | M3 | 40.341.448,99 | Tidak Dipakai | |
544 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.43 |
pekerjaan beton mutu F'c 24,0 Mpa (K-275), slumd (12±2) cm. w/c=0,53 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
406 |
kilogram |
103.251,00 |
41.919.906,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.489 |
M3 |
243.000,00 |
118.827,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.76 |
M3 |
487.900,00 |
370.804,00 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
42.415.556,99 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
42.606.876,99 |
| 2019 | 24.3.1.43 | pekerjaan beton mutu F'c 24,0 Mpa (K-275), slumd (12±2) cm. w/c=0,53 | M3 | 42.606.876,99 | Tidak Dipakai | |
545 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.44 |
pekerjaan beton mutu F'c 26,4 Mpa (K-300), slumd (12±2) cm. w/c=0,52 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.105 |
Orang Hari |
28.000,00 |
2.940,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
2.1 |
Orang Hari |
110.000,00 |
230.999,99 |
|
|
|
|
Jumlah |
243.459,99 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
413 |
kilogram |
103.251,00 |
42.642.663,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.486 |
M3 |
243.000,00 |
118.098,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.756 |
M3 |
487.900,00 |
368.852,39 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
43.135.633,39 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
43.379.093,38 |
| 2019 | 24.3.1.44 | pekerjaan beton mutu F'c 26,4 Mpa (K-300), slumd (12±2) cm. w/c=0,52 | M3 | 43.379.093,38 | Tidak Dipakai | |
546 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.45 |
pekerjaan beton mutu F'c 28.8 Mpa (K-325), slumd (12±2) cm. w/c=0,49 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.105 |
Orang Hari |
28.000,00 |
2.940,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
2.1 |
Orang Hari |
110.000,00 |
230.999,99 |
|
|
|
|
Jumlah |
243.459,99 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
439 |
kilogram |
103.251,00 |
45.327.189,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.479 |
M3 |
243.000,00 |
116.397,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.745 |
M3 |
487.900,00 |
363.485,50 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
45.813.091,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
46.056.551,49 |
| 2019 | 24.3.1.45 | pekerjaan beton mutu F'c 28.8 Mpa (K-325), slumd (12±2) cm. w/c=0,49 | M3 | 46.056.551,49 | Tidak Dipakai | |
547 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.46 |
pekerjaan beton mutu F'c 31.2 Mpa (K-350), slumd (12±2) cm. w/c=0,48 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.105 |
Orang Hari |
28.000,00 |
2.940,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.035 |
Orang Hari |
32.000,00 |
1.120,00 |
23.2.4.1.3.1 |
Tukang |
0.35 |
Orang Hari |
24.000,00 |
8.400,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
2.1 |
Orang Hari |
110.000,00 |
230.999,99 |
|
|
|
|
Jumlah |
243.459,99 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
448 |
kilogram |
103.251,00 |
46.256.448,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.476 |
M3 |
243.000,00 |
115.668,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.741 |
M3 |
487.900,00 |
361.533,90 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
46.739.669,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
46.983.129,89 |
| 2019 | 24.3.1.46 | pekerjaan beton mutu F'c 31.2 Mpa (K-350), slumd (12±2) cm. w/c=0,48 | M3 | 46.983.129,89 | Tidak Dipakai | |
548 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.47 |
pekerjaan pembersihan dengan besi beton polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.004 |
Orang Hari |
28.000,00 |
112,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.007 |
Orang Hari |
32.000,00 |
224,00 |
23.2.4.1.3.1 |
Tukang |
0.007 |
Orang Hari |
24.000,00 |
168,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.007 |
Orang Hari |
110.000,00 |
770,00 |
|
|
|
|
Jumlah |
1.274,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.9.1.1 |
Besi Beton Polos |
1.05 |
Kg |
12.500,00 |
13.125,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.015 |
Kg |
25.500,00 |
382,50 |
|
|
|
|
Jumlah |
13.507,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.781,50 |
| 2019 | 24.3.1.47 | pekerjaan pembersihan dengan besi beton polos | Kg | 14.781,50 | Tidak Dipakai | |
549 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.48 |
pekerjaan pembesian dengan besi beton polos |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.004 |
Orang Hari |
28.000,00 |
112,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.007 |
Orang Hari |
32.000,00 |
224,00 |
23.2.4.1.3.1 |
Tukang |
0.007 |
Orang Hari |
24.000,00 |
168,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.007 |
Orang Hari |
110.000,00 |
770,00 |
|
|
|
|
Jumlah |
1.274,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.9.1.1 |
Besi Beton Polos |
1.05 |
Kg |
12.500,00 |
13.125,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.015 |
Kg |
25.500,00 |
382,50 |
|
|
|
|
Jumlah |
13.507,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.781,50 |
| 2019 | 24.3.1.48 | pekerjaan pembesian dengan besi beton polos | Kg | 14.781,50 | Tidak Dipakai | |
550 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.49 |
pekerjaan pembesian dengan besi beton ulir |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.004 |
Orang Hari |
28.000,00 |
112,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.007 |
Orang Hari |
32.000,00 |
224,00 |
23.2.4.1.3.1 |
Tukang |
0.007 |
Orang Hari |
24.000,00 |
168,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.007 |
Orang Hari |
110.000,00 |
770,00 |
|
|
|
|
Jumlah |
1.274,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.9.1.1 |
Besi Beton Polos |
1.05 |
Kg |
12.500,00 |
13.125,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.015 |
Kg |
25.500,00 |
382,50 |
|
|
|
|
Jumlah |
13.507,50 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.781,50 |
| 2019 | 24.3.1.49 | pekerjaan pembesian dengan besi beton ulir | Kg | 14.781,50 | Tidak Dipakai | |
551 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.50 |
pekerjaan pemasangan kabel presstressed |
|
Kg |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0003 |
Orang Hari |
28.000,00 |
8,40 |
23.2.4.1.2.1 |
Kepala Tukang |
0.0005 |
Orang Hari |
32.000,00 |
16,00 |
23.2.4.1.3.1 |
Tukang |
0.005 |
Orang Hari |
24.000,00 |
120,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.005 |
Orang Hari |
110.000,00 |
550,00 |
|
|
|
|
Jumlah |
694,40 |
|
Bahan/Material: |
|
|
|
|
20.1.1.9.1.1 |
Besi Beton Polos |
1.05 |
Kg |
12.500,00 |
13.125,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.01 |
Kg |
25.500,00 |
255,00 |
|
|
|
|
Jumlah |
13.380,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.074,40 |
| 2019 | 24.3.1.50 | pekerjaan pemasangan kabel presstressed | Kg | 14.074,40 | Tidak Dipakai | |
552 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.51 |
pekerjaan 1 M2 bekisting pondasi |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.026 |
Orang Hari |
28.000,00 |
728,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.026 |
Orang Hari |
32.000,00 |
832,00 |
23.2.4.1.3.1 |
Tukang |
0.26 |
Orang Hari |
24.000,00 |
6.240,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.52 |
Orang Hari |
110.000,00 |
57.200,00 |
|
|
|
|
Jumlah |
65.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.3 |
Kg |
19.800,00 |
5.940,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.04 |
M3 |
3.350.400,00 |
134.016,00 |
20.1.2.1.3.1 |
Minyak Bekisting |
0.1 |
liter |
29.600,00 |
2.960,00 |
|
|
|
|
Jumlah |
142.916,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
207.915,99 |
| 2019 | 24.3.1.51 | pekerjaan 1 M2 bekisting pondasi | M2 | 207.915,99 | Tidak Dipakai | |
553 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.52 |
pekerjaan bekisting kolom |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.033 |
Orang Hari |
28.000,00 |
924,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.033 |
Orang Hari |
32.000,00 |
1.056,00 |
23.2.4.1.3.1 |
Tukang |
0.33 |
Orang Hari |
24.000,00 |
7.920,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.66 |
Orang Hari |
110.000,00 |
72.600,00 |
|
|
|
|
Jumlah |
82.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.04 |
Kg |
19.800,00 |
792,00 |
20.1.1.34.2.1 |
Plywood |
0.4 |
lembar |
121.400,00 |
48.560,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.2 |
M3 |
3.350.400,00 |
670.080,01 |
20.1.1.43.4.7 |
Kayu Meranti |
0.015 |
M3 |
4.711.500,00 |
70.672,50 |
20.1.2.1.3.1 |
Minyak Bekisting |
2 |
liter |
29.600,00 |
59.200,00 |
|
|
|
|
Jumlah |
849.304,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
931.804,51 |
| 2019 | 24.3.1.52 | pekerjaan bekisting kolom | M2 | 931.804,51 | Tidak Dipakai | |
554 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.53 |
pekerjaan bekisting baok |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.033 |
Orang Hari |
28.000,00 |
924,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.033 |
Orang Hari |
32.000,00 |
1.056,00 |
23.2.4.1.3.1 |
Tukang |
0.33 |
Orang Hari |
24.000,00 |
7.920,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.66 |
Orang Hari |
110.000,00 |
72.600,00 |
|
|
|
|
Jumlah |
82.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.04 |
Kg |
19.800,00 |
792,00 |
20.1.1.34.2.1 |
Plywood |
0.4 |
lembar |
121.400,00 |
48.560,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.2 |
M3 |
3.350.400,00 |
670.080,01 |
20.1.1.43.4.7 |
Kayu Meranti |
0.018 |
M3 |
4.711.500,00 |
84.807,00 |
20.1.2.1.3.1 |
Minyak Bekisting |
2 |
liter |
29.600,00 |
59.200,00 |
|
|
|
|
Jumlah |
863.439,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
945.939,01 |
| 2019 | 24.3.1.53 | pekerjaan bekisting baok | M2 | 945.939,01 | Tidak Dipakai | |
555 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.54 |
pkerjaan bekisting lantai |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.033 |
Orang Hari |
28.000,00 |
924,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.033 |
Orang Hari |
32.000,00 |
1.056,00 |
23.2.4.1.3.1 |
Tukang |
0.33 |
Orang Hari |
24.000,00 |
7.920,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.66 |
Orang Hari |
110.000,00 |
72.600,00 |
|
|
|
|
Jumlah |
82.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.04 |
Kg |
19.800,00 |
792,00 |
20.1.1.34.2.1 |
Plywood |
0.4 |
lembar |
121.400,00 |
48.560,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.2 |
M3 |
3.350.400,00 |
670.080,01 |
20.1.1.43.4.7 |
Kayu Meranti |
0.015 |
M3 |
4.711.500,00 |
70.672,50 |
20.1.2.1.3.1 |
Minyak Bekisting |
6 |
liter |
29.600,00 |
177.600,00 |
|
|
|
|
Jumlah |
967.704,51 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.050.204,51 |
| 2019 | 24.3.1.54 | pkerjaan bekisting lantai | M2 | 1.050.204,51 | Tidak Dipakai | |
556 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.55 |
pekerjaan bekisting dinding |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.033 |
Orang Hari |
28.000,00 |
924,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.033 |
Orang Hari |
32.000,00 |
1.056,00 |
23.2.4.1.3.1 |
Tukang |
0.33 |
Orang Hari |
24.000,00 |
7.920,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.66 |
Orang Hari |
110.000,00 |
72.600,00 |
|
|
|
|
Jumlah |
82.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.03 |
Kg |
19.800,00 |
594,00 |
20.1.1.34.2.1 |
Plywood |
0.4 |
lembar |
121.400,00 |
48.560,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.2 |
M3 |
3.350.400,00 |
670.080,01 |
20.1.1.43.4.7 |
Kayu Meranti |
0.02 |
M3 |
4.711.500,00 |
94.230,00 |
20.1.2.1.3.1 |
Minyak Bekisting |
3 |
liter |
29.600,00 |
88.800,00 |
|
|
|
|
Jumlah |
902.264,01 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
984.764,01 |
| 2019 | 24.3.1.55 | pekerjaan bekisting dinding | M2 | 984.764,01 | Tidak Dipakai | |
557 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.56 |
perkerjaan bikisting tangga |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.033 |
Orang Hari |
28.000,00 |
924,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.033 |
Orang Hari |
32.000,00 |
1.056,00 |
23.2.4.1.3.1 |
Tukang |
0.33 |
Orang Hari |
24.000,00 |
7.920,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.66 |
Orang Hari |
110.000,00 |
72.600,00 |
|
|
|
|
Jumlah |
82.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.28.4.4 |
Paku Usuk |
0.03 |
Kg |
19.800,00 |
594,00 |
20.1.1.34.2.1 |
Plywood |
0.4 |
lembar |
121.400,00 |
48.560,00 |
20.1.1.43.4.5 |
Kayu Meranti |
0.15 |
M3 |
3.350.400,00 |
502.560,02 |
20.1.1.43.4.7 |
Kayu Meranti |
0.15 |
M3 |
4.711.500,00 |
706.725,03 |
20.1.2.1.3.1 |
Minyak Bekisting |
2 |
liter |
29.600,00 |
59.200,00 |
|
|
|
|
Jumlah |
1.317.639,05 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.400.139,05 |
| 2019 | 24.3.1.56 | perkerjaan bikisting tangga | M2 | 1.400.139,05 | Tidak Dipakai | |
558 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.57 |
pekerjaan kolom praktis (11X11cm) |
|
M1 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.009 |
Orang Hari |
28.000,00 |
252,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.006 |
Orang Hari |
32.000,00 |
192,00 |
23.2.4.1.3.1 |
Tukang |
0.02 |
Orang Hari |
24.000,00 |
480,00 |
23.2.4.1.3.2 |
upah pengangkut/pengangkat barang |
0.02 |
orang |
200.000,00 |
4.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.18 |
Orang Hari |
110.000,00 |
19.800,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.02 |
Orang Hari |
110.000,00 |
2.200,00 |
|
|
|
|
Jumlah |
26.924,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
4 |
kilogram |
103.251,00 |
413.004,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.006 |
M3 |
243.000,00 |
1.458,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.009 |
M3 |
487.900,00 |
4.391,10 |
20.1.1.9.1.1 |
Besi Beton Polos |
3 |
Kg |
12.500,00 |
37.500,00 |
20.1.1.28.4.4 |
Paku Usuk |
0.002 |
Kg |
19.800,00 |
39,60 |
20.1.1.34.2.1 |
Plywood |
0.01 |
lembar |
121.400,00 |
1.214,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.45 |
Kg |
25.500,00 |
11.475,00 |
|
|
|
|
Jumlah |
469.081,70 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
496.005,70 |
| 2019 | 24.3.1.57 | pekerjaan kolom praktis (11X11cm) | M1 | 496.005,70 | Tidak Dipakai | |
559 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.58 |
pekerjaan ring balok (10X15)cm |
|
M1 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.015 |
Orang Hari |
28.000,00 |
420,00 |
23.2.4.1.3.1 |
Tukang |
0.033 |
Orang Hari |
24.000,00 |
792,00 |
23.2.4.1.3.2 |
upah pengangkut/pengangkat barang |
0.033 |
orang |
200.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.297 |
Orang Hari |
110.000,00 |
32.670,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.033 |
Orang Hari |
110.000,00 |
3.630,00 |
|
|
|
|
Jumlah |
44.112,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
5.5 |
kilogram |
103.251,00 |
567.880,50 |
20.1.1.4.4.1 |
Pasir Cor |
0.009 |
M3 |
243.000,00 |
2.187,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.015 |
M3 |
487.900,00 |
7.318,50 |
20.1.1.9.1.1 |
Besi Beton Polos |
3.6 |
Kg |
12.500,00 |
45.000,00 |
20.1.1.28.4.4 |
Paku Usuk |
0.003 |
Kg |
19.800,00 |
59,40 |
20.1.1.34.2.1 |
Plywood |
0.02 |
lembar |
121.400,00 |
2.428,00 |
20.1.1.35.1.1 |
Kawat Beton |
0.05 |
Kg |
25.500,00 |
1.275,00 |
|
|
|
|
Jumlah |
626.148,40 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
670.260,40 |
| 2019 | 24.3.1.58 | pekerjaan ring balok (10X15)cm | M1 | 670.260,40 | Tidak Dipakai | |
560 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.59 |
Beton mutu tinggi fc = 50 Mpa |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.59 | Beton mutu tinggi fc = 50 Mpa | M3 | 0,00 | Tidak Dipakai | |