521 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.16 |
Pekerjaan Pemasangan Kabel prestressed polos/strand |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.16 | Pekerjaan Pemasangan Kabel prestressed polos/strand | ikat | 0,00 | Tidak Dipakai | |
522 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.17 |
Pekerjaan Bekisting Sloof |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.17 | Pekerjaan Bekisting Sloof | 10 Pcs | 0,00 | Tidak Dipakai | |
523 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.20 |
Pekerjaan Bekisting Lantai |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.20 | Pekerjaan Bekisting Lantai | 10 Pcs | 0,00 | Tidak Dipakai | |
524 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.22 |
Pekerjaan Bekisting Tangga |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.22 | Pekerjaan Bekisting Tangga | 10 Pcs | 0,00 | Tidak Dipakai | |
525 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.23 |
Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.23 | Pekerjaan Pondasi Beton Bertulang (150 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
526 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.24 |
Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.24 | Pekerjaan Sloof Beton Bertulang (200 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
527 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.25 |
Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.25 | Pekerjaan Balok Beton Bertulang (200 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
528 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.26 |
Pekerjaan Kolom Beton Bertulang (150 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.26 | Pekerjaan Kolom Beton Bertulang (150 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
529 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.27 |
Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.27 | Pekerjaan Kolom Beton Bertulang (300 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
530 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.28 |
Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.28 | Pekerjaan Dinding Beton Bertulang (150 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
531 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.29 |
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.29 | Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting) | 500 Biji | 0,00 | Tidak Dipakai | |
532 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.31 |
Pekerjaan Ring Balk (10x15) cm |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.31 | Pekerjaan Ring Balk (10x15) cm | lembar | 0,00 | Tidak Dipakai | |
533 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.32 |
Pembongkaran Beton |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.32 | Pembongkaran Beton | 500 Biji | 0,00 | Tidak Dipakai | |
534 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.33 |
Cor Beton Mutu K 175 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.33 | Cor Beton Mutu K 175 | M3 | 0,00 | Tidak Dipakai | |
535 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.34 |
pekerjaan beton mutu F'c 7,4Mpa (K-100) Siumo (12±2)w/c=0,87 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
830 |
Orang Hari |
28.000,00 |
23.240.000,00 |
23.2.4.1.2.1 |
Kepala Tukang |
280 |
Orang Hari |
32.000,00 |
8.960.000,00 |
23.2.4.1.3.1 |
Tukang |
2750 |
Orang Hari |
24.000,00 |
66.000.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1 |
Orang Hari |
110.000,00 |
110.000,00 |
|
|
|
|
Jumlah |
98.310.000,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
247 |
kilogram |
103.251,00 |
25.502.997,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.621 |
M3 |
243.000,00 |
150.903,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.74 |
M3 |
487.900,00 |
361.046,00 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
26.020.966,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
124.330.966,00 |
| 2019 | 24.3.1.34 | pekerjaan beton mutu F'c 7,4Mpa (K-100) Siumo (12±2)w/c=0,87 | M3 | 124.330.966,00 | Tidak Dipakai | |
536 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.35 |
pekerjaan beton mutu F'c 9,8 Mpa (K-125), Slumd (12±2) cm. w/c=0,78 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
276 |
kilogram |
103.251,00 |
28.497.276,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.591 |
M3 |
243.000,00 |
143.613,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.75 |
M3 |
487.900,00 |
365.925,00 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
29.012.834,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
29.204.154,00 |
| 2019 | 24.3.1.35 | pekerjaan beton mutu F'c 9,8 Mpa (K-125), Slumd (12±2) cm. w/c=0,78 | M3 | 29.204.154,00 | Tidak Dipakai | |
537 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.36 |
pekerjaan mutu F'c 12,2 Mpa (K-150), slumd (12±2) cm, w/c=0,72 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
299 |
kilogram |
103.251,00 |
30.872.049,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.571 |
M3 |
243.000,00 |
138.753,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.753 |
M3 |
487.900,00 |
367.388,71 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
31.384.210,71 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
31.575.530,70 |
| 2019 | 24.3.1.36 | pekerjaan mutu F'c 12,2 Mpa (K-150), slumd (12±2) cm, w/c=0,72 | M3 | 31.575.530,70 | Tidak Dipakai | |
538 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.37 |
pekerjaan beton mutu F'c 14,5 Mpa (K-175), slumd (12±2) cm. w/c=0,66 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
326 |
kilogram |
103.251,00 |
33.659.826,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.543 |
M3 |
243.000,00 |
131.949,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.762 |
M3 |
487.900,00 |
371.779,81 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
34.169.574,81 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
34.360.894,81 |
| 2019 | 24.3.1.37 | pekerjaan beton mutu F'c 14,5 Mpa (K-175), slumd (12±2) cm. w/c=0,66 | M3 | 34.360.894,81 | Tidak Dipakai | |
539 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.38 |
pekerjaan beton mutu F'c 12,2 Mpa (K-150), slumd (12±2) cm. w/c=0,72 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.083 |
Orang Hari |
28.000,00 |
2.324,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.028 |
Orang Hari |
32.000,00 |
896,00 |
23.2.4.1.3.1 |
Tukang |
0.275 |
Orang Hari |
24.000,00 |
6.600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.65 |
Orang Hari |
110.000,00 |
181.500,00 |
|
|
|
|
Jumlah |
191.320,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
299 |
kilogram |
103.251,00 |
30.872.049,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.571 |
M3 |
243.000,00 |
138.753,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.753 |
M3 |
487.900,00 |
367.388,71 |
23.2.2.2.1.1 |
Air Kerja |
215 |
liter |
28,00 |
6.020,00 |
|
|
|
|
Jumlah |
31.384.210,71 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
31.575.530,70 |
| 2019 | 24.3.1.38 | pekerjaan beton mutu F'c 12,2 Mpa (K-150), slumd (12±2) cm. w/c=0,72 | M3 | 31.575.530,70 | Tidak Dipakai | |
540 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.39 |
pekerjaan beton mutu F'c 7,4 Mpa (K-100), slumd (12±2) cm. w/c=0,87 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.06 |
Orang Hari |
28.000,00 |
1.680,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.02 |
Orang Hari |
32.000,00 |
640,00 |
23.2.4.1.3.1 |
Tukang |
0.2 |
Orang Hari |
24.000,00 |
4.800,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.2 |
Orang Hari |
110.000,00 |
132.000,01 |
|
|
|
|
Jumlah |
139.120,01 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.2 |
Semen Mortar |
230 |
kilogram |
103.251,00 |
23.747.730,00 |
20.1.1.4.4.1 |
Pasir Cor |
0.638 |
M3 |
243.000,00 |
155.034,00 |
20.1.1.5.4.1 |
Batu Pecah Mesin |
0.671 |
M3 |
487.900,00 |
327.380,90 |
23.2.2.2.1.1 |
Air Kerja |
200 |
liter |
28,00 |
5.600,00 |
|
|
|
|
Jumlah |
24.235.744,90 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
24.374.864,91 |
| 2019 | 24.3.1.39 | pekerjaan beton mutu F'c 7,4 Mpa (K-100), slumd (12±2) cm. w/c=0,87 | M3 | 24.374.864,91 | Tidak Dipakai | |