501 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.33 |
Perletakan Elastomerik Jenis 2 (400 x 450 x 45) |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.33 | Perletakan Elastomerik Jenis 2 (400 x 450 x 45) | buah | 0,00 | Tidak Dipakai | |
502 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.34 |
Penyediaan Unit Pracetak Gelagar I tipe 1 Bentang 16 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.34 | Penyediaan Unit Pracetak Gelagar I tipe 1 Bentang 16 Meter | buah | 0,00 | Tidak Dipakai | |
503 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.35 |
Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 Meter |
|
buah |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.35 | Penyediaan Unit Pracetak Gelagar I Tipe 1 Bentang 25 Meter | buah | 0,00 | Tidak Dipakai | |
504 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.36 |
Pekerjaan Pemasangan Batu Kali (1 Pc : 3 Pc) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.2 |
Mandor |
0.075 |
Orang Hari |
196.000,00 |
14.700,00 |
23.2.4.1.2.3 |
Kepala Tukang |
0.075 |
Orang Hari |
224.000,00 |
16.800,00 |
23.2.4.1.3.4 |
Tukang |
0.75 |
Orang Hari |
168.000,00 |
126.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.5 |
Orang Hari |
110.000,00 |
165.000,00 |
|
|
|
|
Jumlah |
322.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.3 |
Semen Portland PC @ 40 Kg |
202 |
Kg |
1.822,50 |
368.145,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.485 |
M3 |
225.100,00 |
109.173,50 |
20.1.1.5.7.19 |
Batu Kali |
1.2 |
M3 |
254.462,00 |
305.354,41 |
|
|
|
|
Jumlah |
782.672,92 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.105.172,92 |
| 2019 | 24.2.1.36 | Pekerjaan Pemasangan Batu Kali (1 Pc : 3 Pc) | M3 | 1.105.172,92 | Tidak Dipakai | |
505 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.37 |
Pekerjaan Pemasangan Batu kali (1 Pc : 4 Pc) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.2 |
Mandor |
0.075 |
Orang Hari |
196.000,00 |
14.700,00 |
23.2.4.1.2.3 |
Kepala Tukang |
0.075 |
Orang Hari |
224.000,00 |
16.800,00 |
23.2.4.1.3.4 |
Tukang |
0.75 |
Orang Hari |
168.000,00 |
126.000,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
1.5 |
Orang Hari |
110.000,00 |
165.000,00 |
|
|
|
|
Jumlah |
322.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.1.3 |
Semen Portland PC @ 40 Kg |
163 |
Kg |
1.822,50 |
297.067,50 |
20.1.1.4.3.1 |
Pasir Pasang |
0.52 |
M3 |
225.100,00 |
117.052,00 |
20.1.1.5.7.19 |
Batu Kali |
1.2 |
M3 |
254.462,00 |
305.354,41 |
|
|
|
|
Jumlah |
719.473,91 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
1.041.973,91 |
| 2019 | 24.2.1.37 | Pekerjaan Pemasangan Batu kali (1 Pc : 4 Pc) | M3 | 1.041.973,91 | Tidak Dipakai | |
506 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.1 |
Pekerjaan Beton K-100 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.1 | Pekerjaan Beton K-100 | 500 Biji | 0,00 | Tidak Dipakai | |
507 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.2 |
Pekerjaan Beton K-125 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.2 | Pekerjaan Beton K-125 | 500 Biji | 0,00 | Tidak Dipakai | |
508 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.3 |
Pekerjaan Beton K-150 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.3 | Pekerjaan Beton K-150 | 500 Biji | 0,00 | Tidak Dipakai | |
509 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.4 |
Lantai Kerja K-100 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.4 | Lantai Kerja K-100 | 500 Biji | 0,00 | Tidak Dipakai | |
510 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.5 |
Pekerjaan Beton K-175 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.5 | Pekerjaan Beton K-175 | 500 Biji | 0,00 | Tidak Dipakai | |
511 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.6 |
Pekerjaan Beton K-200 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.6 | Pekerjaan Beton K-200 | 500 Biji | 0,00 | Tidak Dipakai | |
512 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.7 |
Pekerjaan Beton K-225 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.7 | Pekerjaan Beton K-225 | 500 Biji | 0,00 | Tidak Dipakai | |
513 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.8 |
Pekerjaan Beton K-250 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.8 | Pekerjaan Beton K-250 | 500 Biji | 0,00 | Tidak Dipakai | |
514 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.9 |
Pekerjaan Beton K-275 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.9 | Pekerjaan Beton K-275 | 500 Biji | 0,00 | Tidak Dipakai | |
515 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.10 |
Pekerjaan Beton K-300 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.10 | Pekerjaan Beton K-300 | 500 Biji | 0,00 | Tidak Dipakai | |
516 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.11 |
Pekerjaan Beton K-325 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.11 | Pekerjaan Beton K-325 | 500 Biji | 0,00 | Tidak Dipakai | |
517 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.12 |
Pekerjaan Beton K-350 |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.12 | Pekerjaan Beton K-350 | 500 Biji | 0,00 | Tidak Dipakai | |
518 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.13 |
Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.13 | Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) | 500 Biji | 0,00 | Tidak Dipakai | |
519 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.14 |
Pekerjaan Pembesian dengan besi beton (polos/ulir) |
|
ikat |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.3.1.14 | Pekerjaan Pembesian dengan besi beton (polos/ulir) | ikat | 0,00 | Tidak Dipakai | |
520 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.3.1.15 |
Pekerjaan Pembesian Wire Mesh |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.001 |
Orang Hari |
28.000,00 |
28,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.025 |
Orang Hari |
32.000,00 |
800,00 |
23.2.4.1.3.1 |
Tukang |
0.025 |
Orang Hari |
24.000,00 |
600,00 |
23.2.4.1.4.1 |
Pembantu Tukang |
0.025 |
Orang Hari |
110.000,00 |
2.750,00 |
|
|
|
|
Jumlah |
4.178,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.35.1.1 |
Kawat Beton |
0.05 |
Kg |
25.500,00 |
1.275,00 |
|
|
|
|
Jumlah |
1.275,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.453,00 |
| 2019 | 24.3.1.15 | Pekerjaan Pembesian Wire Mesh | M2 | 5.453,00 | Tidak Dipakai | |