461 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.31 |
Galian Tanah Cadas/Rabat sedalam 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.06 |
Orang Hari |
28.000,00 |
1.680,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
1.5 |
Orang Hari |
110.000,00 |
165.000,00 |
|
|
|
|
Jumlah |
166.680,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
166.680,00 |
| 2019 | 24.1.2.31 | Galian Tanah Cadas/Rabat sedalam 1 m | M3 | 166.680,00 | Tidak Dipakai | |
462 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.32 |
Pengerjaan Stripping 1 m2 Tanah Tebing Setinggi 1 meter |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.005 |
Orang Hari |
28.000,00 |
140,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.05 |
Orang Hari |
110.000,00 |
5.500,00 |
|
|
|
|
Jumlah |
5.640,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
5.640,00 |
| 2019 | 24.1.2.32 | Pengerjaan Stripping 1 m2 Tanah Tebing Setinggi 1 meter | M2 | 5.640,00 | Tidak Dipakai | |
463 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.33 |
Pembuangan Tanah 1 m3 Tanah Sejauh 30 Meter |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
28.000,00 |
280,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.33 |
Orang Hari |
110.000,00 |
36.300,00 |
|
|
|
|
Jumlah |
36.580,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
36.580,00 |
| 2019 | 24.1.2.33 | Pembuangan Tanah 1 m3 Tanah Sejauh 30 Meter | M3 | 36.580,00 | Tidak Dipakai | |
464 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.34 |
Pengurugan Dengan Pasir Urug |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
28.000,00 |
280,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
33.280,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.1.1 |
Pasir Urug |
1.2 |
M3 |
264.236,00 |
317.083,21 |
|
|
|
|
Jumlah |
317.083,21 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
350.363,21 |
| 2019 | 24.1.2.34 | Pengurugan Dengan Pasir Urug | M3 | 350.363,21 | Tidak Dipakai | |
465 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.35 |
Pengurugan 1 m3 Dengan Tanah Urug |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
28.000,00 |
280,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
33.280,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.1.4 |
Pasir Timbun/urug |
1.2 |
M3 |
141.426,00 |
169.711,21 |
|
|
|
|
Jumlah |
169.711,21 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
202.991,21 |
| 2019 | 24.1.2.35 | Pengurugan 1 m3 Dengan Tanah Urug | M3 | 202.991,21 | Tidak Dipakai | |
466 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.36 |
Pengurugan 1 m3 Sirtu Padat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.025 |
Orang Hari |
28.000,00 |
700,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.25 |
Orang Hari |
110.000,00 |
27.500,00 |
|
|
|
|
Jumlah |
28.200,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.5.1 |
Sirtu |
1.2 |
M3 |
307.682,00 |
369.218,41 |
|
|
|
|
Jumlah |
369.218,41 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.11.6.12 |
Sewa Stemper |
0.0088 |
jam |
109.400,00 |
962,72 |
|
|
|
|
Jumlah |
962,72 |
|
|
|
|
Nilai HSPK |
398.381,13 |
| 2019 | 24.1.2.36 | Pengurugan 1 m3 Sirtu Padat | M3 | 398.381,13 | Tidak Dipakai | |
467 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.37 |
Pengangkutan Tanah dr. Lubang Galian Dalamnya Lebih Dari 1 |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0075 |
Orang Hari |
28.000,00 |
210,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.15 |
Orang Hari |
110.000,00 |
16.500,00 |
|
|
|
|
Jumlah |
16.710,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
16.710,00 |
| 2019 | 24.1.2.37 | Pengangkutan Tanah dr. Lubang Galian Dalamnya Lebih Dari 1 | M3 | 16.710,00 | Tidak Dipakai | |
468 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.38 |
Pengangkutan Lumpur dr Lubang Galian Dalamnya Lebih Dari 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.0125 |
Orang Hari |
28.000,00 |
350,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.25 |
Orang Hari |
110.000,00 |
27.500,00 |
|
|
|
|
Jumlah |
27.850,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
27.850,00 |
| 2019 | 24.1.2.38 | Pengangkutan Lumpur dr Lubang Galian Dalamnya Lebih Dari 1 m | M3 | 27.850,00 | Tidak Dipakai | |
469 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.1 |
Pemasangan Turap Papan tebal 3 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.1 | Pemasangan Turap Papan tebal 3 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
470 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.2 |
Pemasangan Turap Bambu tinggi 1,5 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.2 | Pemasangan Turap Bambu tinggi 1,5 m | lembar | 0,00 | Tidak Dipakai | |
471 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.3 |
Pemasangan Turap Bambu tinggi 2,75 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.3 | Pemasangan Turap Bambu tinggi 2,75 m | lembar | 0,00 | Tidak Dipakai | |
472 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.4 |
Pemasangan Trucuk Bambu φ 10 s/d 12 - P.3 m |
|
batang |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.4 | Pemasangan Trucuk Bambu φ 10 s/d 12 - P.3 m | batang | 0,00 | Tidak Dipakai | |
473 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.5 |
Pemasangan Trucuk Kayu Gelam φ 8 s/d 12 - P 4 m |
|
batang |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.5 | Pemasangan Trucuk Kayu Gelam φ 8 s/d 12 - P 4 m | batang | 0,00 | Tidak Dipakai | |
474 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.6 |
Pemasangan Perancah Bambu |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.6 | Pemasangan Perancah Bambu | 10 Pcs | 0,00 | Tidak Dipakai | |
475 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.7 |
Pembuatan KISDAM tinggi 1m tebal 0,6 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.7 | Pembuatan KISDAM tinggi 1m tebal 0,6 m | lembar | 0,00 | Tidak Dipakai | |
476 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.8 |
Pembuatan KISDAM tinggi 1,5m tebal 0,6 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.8 | Pembuatan KISDAM tinggi 1,5m tebal 0,6 m | lembar | 0,00 | Tidak Dipakai | |
477 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.9 |
Pembuatan KISDAM tinggi 2m tebal 0,6 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.9 | Pembuatan KISDAM tinggi 2m tebal 0,6 m | lembar | 0,00 | Tidak Dipakai | |
478 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.10 |
Pembuatan KISDAM tinggi 2,5m tebal 0,6 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.2.1.10 | Pembuatan KISDAM tinggi 2,5m tebal 0,6 m | lembar | 0,00 | Tidak Dipakai | |
479 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.11 |
Pekerjaan Pemasangan Batu Kali Belah (1 Pc : 3 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.075 |
Orang Hari |
28.000,00 |
2.100,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.075 |
Orang Hari |
32.000,00 |
2.400,00 |
23.2.4.1.3.1 |
Tukang |
0.75 |
Orang Hari |
24.000,00 |
18.000,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
1.5 |
Orang Hari |
110.000,00 |
165.000,00 |
|
|
|
|
Jumlah |
187.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
202 |
Zak |
69.100,00 |
13.958.200,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.485 |
M3 |
225.100,00 |
109.173,50 |
20.1.1.5.3.1 |
Batu Kali Belah |
1.2 |
0,6M3 |
448.100,00 |
537.720,02 |
|
|
|
|
Jumlah |
14.605.093,52 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
14.792.593,52 |
| 2019 | 24.2.1.11 | Pekerjaan Pemasangan Batu Kali Belah (1 Pc : 3 Ps) | M3 | 14.792.593,52 | Tidak Dipakai | |
480 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.2.1.12 |
Pekerjaan Pemasangan Batu Kali Belah (1 Pc : 4 Ps) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.075 |
Orang Hari |
28.000,00 |
2.100,00 |
23.2.4.1.2.1 |
Kepala Tukang |
0.075 |
Orang Hari |
32.000,00 |
2.400,00 |
23.2.4.1.3.1 |
Tukang |
0.75 |
Orang Hari |
24.000,00 |
18.000,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
1.5 |
Orang Hari |
110.000,00 |
165.000,00 |
|
|
|
|
Jumlah |
187.500,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.2.2.1 |
Semen PC |
163 |
Zak |
69.100,00 |
11.263.300,00 |
20.1.1.4.3.1 |
Pasir Pasang |
0.52 |
M3 |
225.100,00 |
117.052,00 |
20.1.1.5.3.1 |
Batu Kali Belah |
1.2 |
0,6M3 |
448.100,00 |
537.720,02 |
|
|
|
|
Jumlah |
11.918.072,02 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
12.105.572,02 |
| 2019 | 24.2.1.12 | Pekerjaan Pemasangan Batu Kali Belah (1 Pc : 4 Ps) | M3 | 12.105.572,02 | Tidak Dipakai | |