Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 47,901-47,920 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
| 47901 | 2019 | 23.3.2.3.60.1 | Overhould Evaporator Dan Kondensor Unit | | 1.650.000,00 | unit | Tidak Dipakai | |
| 47902 | 2019 | 23.3.2.3.61.1 | Penggantian Filter Driyer | | 350.000,00 | unit | Tidak Dipakai | |
| 47903 | 2019 | 23.3.2.3.62.1 | Pengisian Freon 404A | | 1.250.000,00 | Kali | Tidak Dipakai | |
| 47904 | 2019 | 23.3.2.3.63.1 | Plat Border | | 1.650.000,00 | Lot | Tidak Dipakai | |
| 47905 | 2019 | 23.3.2.3.64.1 | Plat String 800mm X 100mm | | 1.250.000,00 | unit | Tidak Dipakai | |
| 47906 | 2019 | 23.3.2.3.65.1 | Perbaikan Panel Hydrant Dan Setting Pressure Switch | | 1.500.000,00 | titik | Tidak Dipakai | |
| 47907 | 2019 | 23.3.2.3.66.2 | Belanja Pemeliharaan Hidran P2K dan Racun Api | (belum diset) | 95.000.000,00 | Tahun | Dipakai | |
| 47908 | 2019 | 23.3.2.3.67.1 | Service Berkala Central Vacuum | | 5.000.000,00 | unit | Tidak Dipakai | |
| 47909 | 2019 | 23.3.2.3.68.1 | Pemeliharaan Lift | | 36.600.000,00 | unit | Dipakai | |
| 47910 | 2019 | 23.3.2.3.68.2 | Pemeliharaan Mesin Lift | | 200.000.000,00 | Tahun | Dipakai | |
| 47911 | 2019 | 23.3.2.3.69.1 | Service Mesin Fogging | | 750.000,00 | unit | Dipakai | |
| 47912 | 2019 | 23.3.2.3.70.1 | Pengecetan Tiang Dengan Cat Minyak 3x Saputan | | 48.014,00 | M2 | Dipakai | |
| 47913 | 2019 | 23.3.2.3.71.1 | Perbaikan Perahu Wisata Air | | 50.741.000,00 | unit | Tidak Dipakai | |
| 47914 | 2019 | 23.3.2.3.72.1 | Perbaikan Dan Penggantian Kursi Berbahan Fiber Glass | | 6.500.000,00 | set | Tidak Dipakai | |
| 47915 | 2019 | 23.3.2.3.73.1 | Perbaikan Kasko Perahu Wisata | | 46.500.000,00 | set | Tidak Dipakai | |
| 47916 | 2019 | 23.3.2.3.74.1 | Perbaikan Mesin Perahu Wisata | | 14.500.000,00 | set | Tidak Dipakai | |
| 47917 | 2019 | 23.3.2.3.75.1 | Pengecatan Perahu Wisata | | 165.000,00 | M2 | Tidak Dipakai | |
| 47918 | 2019 | 23.3.2.3.77.1 | Pengecatan lapangan Badminton Uk. 126 m | (belum diset) | 99.000,00 | meter | Tidak Dipakai | |
| 47919 | 2019 | 23.3.2.3.77.2 | Pengecatan tiang LPJU | Dinas Kebersihan Dan Pertamanan | 100.000.000,00 | Kegiatan | Dipakai | |
| 47920 | 2019 | 23.3.2.3.77.3 | Pengecatan Lapangan Badminton Uk. 97.45 m | (belum diset) | 90.000,00 | meter | Tidak Dipakai | |