Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 47,181-47,200 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
| 47181 | 2019 | 23.2.5.9.4.4 | sewa kendaraan roda 6 ( truk / bus ) | (belum diset) | 4.500.000,00 | Unit Hari | Dipakai | |
| 47182 | 2019 | 23.2.5.9.4.5 | Sewa Truk 3 Suku | Termasuk Upah Supir | 600.000,00 | Unit Hari | Dipakai | |
| 47183 | 2019 | 23.2.5.9.5.1 | Sewa Flat Bed Truck | 4 T (MIN 5 jam) | 106.400,00 | jam | Tidak Dipakai | |
| 47184 | 2019 | 23.2.5.9.5.2 | Sewa Trailer | | 4.863.636,00 | Hari | Tidak Dipakai | |
| 47185 | 2019 | 23.2.5.9.5.3 | Sewa Kendaraan (Operasi Pasar) | | 250.000.000,00 | Tahun | Tidak Dipakai | |
| 47186 | 2019 | 23.2.5.10.1.1 | Sewa Perahu Tradisional | | 209.400,00 | unit | Tidak Dipakai | |
| 47187 | 2019 | 23.2.5.10.2.1 | Sewa Perahu Rakyat | | 800.000,00 | unit | Dipakai | |
| 47188 | 2019 | 23.2.5.10.2.2 | Sewa Boat | | 5.000.000,00 | Hari | Dipakai | |
| 47189 | 2019 | 23.2.5.10.3.1 | Sewa Perahu Naga | | 10.000.000,00 | unit | Tidak Dipakai | |
| 47190 | 2019 | 23.2.5.10.4.1 | Belanja Mobilitas Air | (belum diset) | 3.000.000,00 | paket | Tidak Dipakai | |
| 47191 | 2019 | 23.2.5.10.4.2 | Belanja Sewa Mobilitas Air | | 3.000.000,00 | paket | Dipakai | |
| 47192 | 2019 | 23.2.5.11.1.1 | Sewa Escavator | 6m3 | 138.400,00 | jam | Tidak Dipakai | |
| 47193 | 2019 | 23.2.5.11.3.1 | Sewa Crane | 30 ton - Min. 8 Jam (Termasuk Mob/Demob Operator BBM) | 146.300,00 | jam | Tidak Dipakai | |
| 47194 | 2019 | 23.2.5.11.3.2 | Sewa Bucket dan Crane / Draglin Scraper | | 85.200,00 | jam | Tidak Dipakai | |
| 47195 | 2019 | 23.2.5.11.3.3 | Sewa Crane untuk Pemindahan dan Pemasangan | | 612.400,00 | LS | Tidak Dipakai | |
| 47196 | 2019 | 23.2.5.11.3.4 | Sewa Crane untuk Pemindahan dan Pemasangan Tiang Traffic Light (TL) | | 585.000,00 | unit | Tidak Dipakai | |
| 47197 | 2019 | 23.2.5.11.3.5 | Pembongkaran/Penurunan Konstruksi Reklame | ..,.. | 1.500.000,00 | Tahun | Tidak Dipakai | |
| 47198 | 2019 | 23.2.5.11.5.1 | Sewa Generator | 5000 Watt | 732.900,00 | unit | Tidak Dipakai | |
| 47199 | 2019 | 23.2.5.11.5.2 | Sewa Genset | 80 KVA | 2.750.000,00 | unit | Dipakai | |
| 47200 | 2019 | 23.2.5.11.5.3 | Sewa Generator | 60.000 Watt BBM | 2.500.000,00 | unit | Dipakai | |