441 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.11 |
Penggalian Lumpur dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.007 |
Orang Hari |
28.000,00 |
196,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.226 |
Orang Hari |
110.000,00 |
24.860,00 |
|
|
|
|
Jumlah |
25.056,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.074 |
jam |
69.200,00 |
5.120,80 |
23.2.5.11.1.1 |
Sewa Escavator |
0.0528 |
jam |
138.400,00 |
7.307,52 |
|
|
|
|
Jumlah |
12.428,32 |
|
|
|
|
Nilai HSPK |
37.484,32 |
| 2019 | 24.1.2.11 | Penggalian Lumpur dengan Alat Berat | M3 | 37.484,32 | Tidak Dipakai | |
442 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.12 |
Penggalian Tanah dengan Alat Berat |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.007 |
Orang Hari |
28.000,00 |
196,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.226 |
Orang Hari |
110.000,00 |
24.860,00 |
|
|
|
|
Jumlah |
25.056,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.9.4.3 |
Sewa Dump Truk |
0.067 |
jam |
69.200,00 |
4.636,40 |
23.2.5.11.1.1 |
Sewa Escavator |
0.067 |
jam |
138.400,00 |
9.272,80 |
|
|
|
|
Jumlah |
13.909,20 |
|
|
|
|
Nilai HSPK |
38.965,20 |
| 2019 | 24.1.2.12 | Penggalian Tanah dengan Alat Berat | M3 | 38.965,20 | Tidak Dipakai | |
443 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.13 |
Pengurugan Tanah Kembali 1 m3 untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.05 |
Orang Hari |
28.000,00 |
1.400,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.5 |
Orang Hari |
110.000,00 |
55.000,00 |
|
|
|
|
Jumlah |
56.400,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
56.400,00 |
| 2019 | 24.1.2.13 | Pengurugan Tanah Kembali 1 m3 untuk Konstruksi | M3 | 56.400,00 | Tidak Dipakai | |
444 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.14 |
Pengurugan tanah dengan pemadatan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
28.000,00 |
280,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
33.280,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.6.1 |
Tanah Urug |
1.2 |
M3 |
121.500,00 |
145.800,01 |
|
|
|
|
Jumlah |
145.800,01 |
|
Sewa Peralatan: |
|
|
|
|
23.2.5.12.1.6 |
Sewa Alat Bantu |
8 |
M3 |
1.100,00 |
8.800,00 |
|
|
|
|
Jumlah |
8.800,00 |
|
|
|
|
Nilai HSPK |
187.880,01 |
| 2019 | 24.1.2.14 | Pengurugan tanah dengan pemadatan | M3 | 187.880,01 | Tidak Dipakai | |
445 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.15 |
Pengurugan Pasir (PADAT) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.15 | Pengurugan Pasir (PADAT) | 500 Biji | 0,00 | Tidak Dipakai | |
446 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.16 |
Pengurugan Sirtu (PADAT) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.16 | Pengurugan Sirtu (PADAT) | 500 Biji | 0,00 | Tidak Dipakai | |
447 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.17 |
Pengurugan PUDDEL 1 KP: 5 TL |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.17 | Pengurugan PUDDEL 1 KP: 5 TL | 500 Biji | 0,00 | Tidak Dipakai | |
448 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.18 |
Tanah Urug Katel |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.18 | Tanah Urug Katel | 500 Biji | 0,00 | Tidak Dipakai | |
449 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.19 |
Pengurugan Sirtu dengan Pemadatan Menggunakan Alat Berat |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.19 | Pengurugan Sirtu dengan Pemadatan Menggunakan Alat Berat | 500 Biji | 0,00 | Tidak Dipakai | |
450 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.20 |
Pengerukan Saluran (manual) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.20 | Pengerukan Saluran (manual) | 500 Biji | 0,00 | Tidak Dipakai | |
451 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.21 |
Pengurugan Pasir Untuk Paving |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.01 |
Orang Hari |
28.000,00 |
280,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.3 |
Orang Hari |
110.000,00 |
33.000,00 |
|
|
|
|
Jumlah |
33.280,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.4.1.1 |
Pasir Urug |
1.2 |
M3 |
264.236,00 |
317.083,21 |
|
|
|
|
Jumlah |
317.083,21 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
350.363,21 |
| 2019 | 24.1.2.21 | Pengurugan Pasir Untuk Paving | M3 | 350.363,21 | Tidak Dipakai | |
452 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.22 |
Pemadatan Tanah 1 m3 (per 20cm) |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.05 |
Orang Hari |
28.000,00 |
1.400,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.5 |
Orang Hari |
110.000,00 |
55.000,00 |
|
|
|
|
Jumlah |
56.400,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
56.400,00 |
| 2019 | 24.1.2.22 | Pemadatan Tanah 1 m3 (per 20cm) | M3 | 56.400,00 | Tidak Dipakai | |
453 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.23 |
Pekerjaan 1m2 Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan |
|
M2 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.015 |
Orang Hari |
28.000,00 |
420,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.15 |
Orang Hari |
110.000,00 |
16.500,00 |
|
|
|
|
Jumlah |
16.920,00 |
|
Bahan/Material: |
|
|
|
|
20.1.1.44.1.1 |
Ijuk |
6 |
Kg |
18.954,00 |
113.724,00 |
|
|
|
|
Jumlah |
113.724,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
130.644,00 |
| 2019 | 24.1.2.23 | Pekerjaan 1m2 Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan | M2 | 130.644,00 | Tidak Dipakai | |
454 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.24 |
Pengerukan Saluran (alat berat) |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.24 | Pengerukan Saluran (alat berat) | 500 Biji | 0,00 | Tidak Dipakai | |
455 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.25 |
Pengurugan Abu Batu |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.25 | Pengurugan Abu Batu | 500 Biji | 0,00 | Tidak Dipakai | |
456 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.26 |
Galian Tanah |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.26 | Galian Tanah | M3 | 0,00 | Tidak Dipakai | |
457 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.27 |
Urugan Tanah Kembali dan Pemadatan |
|
M3 |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2019 | 24.1.2.27 | Urugan Tanah Kembali dan Pemadatan | M3 | 0,00 | Tidak Dipakai | |
458 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.28 |
Penggalian Tanah Biasa Sedalam 1 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.025 |
Orang Hari |
28.000,00 |
700,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.75 |
Orang Hari |
110.000,00 |
82.500,00 |
|
|
|
|
Jumlah |
83.200,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
83.200,00 |
| 2019 | 24.1.2.28 | Penggalian Tanah Biasa Sedalam 1 m untuk Konstruksi | M3 | 83.200,00 | Tidak Dipakai | |
459 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.29 |
Penggalian Tanah Biasa sedalam 2 m untuk Konstruksi |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.045 |
Orang Hari |
28.000,00 |
1.260,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
0.9 |
Orang Hari |
110.000,00 |
99.000,00 |
|
|
|
|
Jumlah |
100.260,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
100.260,00 |
| 2019 | 24.1.2.29 | Penggalian Tanah Biasa sedalam 2 m untuk Konstruksi | M3 | 100.260,00 | Tidak Dipakai | |
460 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.1.2.30 |
Penggalian Tanah Keras Sedalam 1 m |
|
M3 |
|
|
|
Upah: |
|
|
|
|
23.2.4.1.1.1 |
Mandor |
0.032 |
Orang Hari |
28.000,00 |
896,00 |
23.2.4.1.5.1 |
Tenaga Kasar |
1 |
Orang Hari |
110.000,00 |
110.000,00 |
|
|
|
|
Jumlah |
110.896,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
110.896,00 |