441 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 9,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
9.5 |
M2 |
640.512,49 |
6.084.868,64 |
|
|
|
|
|
Nilai ASB |
6.084.868,64 |
| 2020 | 25.1.1.2.16 | Pemeliharaan Jalan Overlay Lebar 9,5 m | M1 | 6.084.868,64 | (belum diset) | |
442 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 10 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
10 |
M2 |
640.512,49 |
6.405.124,88 |
|
|
|
|
|
Nilai ASB |
6.405.124,88 |
| 2020 | 25.1.1.2.17 | Pemeliharaan Jalan Overlay Lebar 10 m | M1 | 6.405.124,88 | (belum diset) | |
443 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 10,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
10.5 |
M2 |
640.512,49 |
6.725.381,12 |
|
|
|
|
|
Nilai ASB |
6.725.381,12 |
| 2020 | 25.1.1.2.18 | Pemeliharaan Jalan Overlay Lebar 10,5 m | M1 | 6.725.381,12 | (belum diset) | |
444 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 11 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
11 |
M2 |
640.512,49 |
7.045.637,37 |
|
|
|
|
|
Nilai ASB |
7.045.637,37 |
| 2020 | 25.1.1.2.19 | Pemeliharaan Jalan Overlay Lebar 11 m | M1 | 7.045.637,37 | (belum diset) | |
445 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 11,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
11.5 |
M2 |
640.512,49 |
7.365.893,61 |
|
|
|
|
|
Nilai ASB |
7.365.893,61 |
| 2020 | 25.1.1.2.20 | Pemeliharaan Jalan Overlay Lebar 11,5 m | M1 | 7.365.893,61 | (belum diset) | |
446 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 12 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
12 |
M2 |
640.512,49 |
7.686.149,86 |
|
|
|
|
|
Nilai ASB |
7.686.149,86 |
| 2020 | 25.1.1.2.21 | Pemeliharaan Jalan Overlay Lebar 12 m | M1 | 7.686.149,86 | (belum diset) | |
447 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 12,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
12.5 |
M2 |
640.512,49 |
8.006.406,10 |
|
|
|
|
|
Nilai ASB |
8.006.406,10 |
| 2020 | 25.1.1.2.22 | Pemeliharaan Jalan Overlay Lebar 12,5 m | M1 | 8.006.406,10 | (belum diset) | |
448 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 13 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
13 |
M2 |
640.512,49 |
8.326.662,34 |
|
|
|
|
|
Nilai ASB |
8.326.662,34 |
| 2020 | 25.1.1.2.23 | Pemeliharaan Jalan Overlay Lebar 13 m | M1 | 8.326.662,34 | (belum diset) | |
449 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 13,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
13.5 |
M2 |
640.512,49 |
8.646.918,59 |
|
|
|
|
|
Nilai ASB |
8.646.918,59 |
| 2020 | 25.1.1.2.24 | Pemeliharaan Jalan Overlay Lebar 13,5 m | M1 | 8.646.918,59 | (belum diset) | |
450 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 14 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
14 |
M2 |
640.512,49 |
8.967.174,83 |
|
|
|
|
|
Nilai ASB |
8.967.174,83 |
| 2020 | 25.1.1.2.25 | Pemeliharaan Jalan Overlay Lebar 14 m | M1 | 8.967.174,83 | (belum diset) | |
451 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 14,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
14.5 |
M2 |
640.512,49 |
9.287.431,08 |
|
|
|
|
|
Nilai ASB |
9.287.431,08 |
| 2020 | 25.1.1.2.26 | Pemeliharaan Jalan Overlay Lebar 14,5 m | M1 | 9.287.431,08 | (belum diset) | |
452 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 15 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
15 |
M2 |
640.512,49 |
9.607.687,32 |
|
|
|
|
|
Nilai ASB |
9.607.687,32 |
| 2020 | 25.1.1.2.27 | Pemeliharaan Jalan Overlay Lebar 15 m | M1 | 9.607.687,32 | (belum diset) | |
453 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 15,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
15.5 |
M2 |
640.512,49 |
9.927.943,57 |
|
|
|
|
|
Nilai ASB |
9.927.943,57 |
| 2020 | 25.1.1.2.28 | Pemeliharaan Jalan Overlay Lebar 15,5 m | M1 | 9.927.943,57 | (belum diset) | |
454 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 16 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
16 |
M2 |
640.512,49 |
10.248.199,81 |
|
|
|
|
|
Nilai ASB |
10.248.199,81 |
| 2020 | 25.1.1.2.29 | Pemeliharaan Jalan Overlay Lebar 16 m | M1 | 10.248.199,81 | (belum diset) | |
455 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 16,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
16.5 |
M2 |
640.512,49 |
10.568.456,05 |
|
|
|
|
|
Nilai ASB |
10.568.456,05 |
| 2020 | 25.1.1.2.30 | Pemeliharaan Jalan Overlay Lebar 16,5 m | M1 | 10.568.456,05 | (belum diset) | |
456 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 17 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
17 |
M2 |
640.512,49 |
10.888.712,30 |
|
|
|
|
|
Nilai ASB |
10.888.712,30 |
| 2020 | 25.1.1.2.31 | Pemeliharaan Jalan Overlay Lebar 17 m | M1 | 10.888.712,30 | (belum diset) | |
457 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 17,5 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
17.5 |
M2 |
640.512,49 |
11.208.968,54 |
|
|
|
|
|
Nilai ASB |
11.208.968,54 |
| 2020 | 25.1.1.2.32 | Pemeliharaan Jalan Overlay Lebar 17,5 m | M1 | 11.208.968,54 | (belum diset) | |
458 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 18 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
18 |
M2 |
640.512,49 |
11.529.224,79 |
|
|
|
|
|
Nilai ASB |
11.529.224,79 |
| 2020 | 25.1.1.2.33 | Pemeliharaan Jalan Overlay Lebar 18 m | M1 | 11.529.224,79 | (belum diset) | |
459 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.1.2 |
Pemeliharaan Jalan Overlay Lebar 20 m |
|
|
Titik |
|
|
25.1.1.2.4 |
- |
Pemeliharaan Jalan Overlay |
20 |
M2 |
640.512,49 |
12.810.249,76 |
|
|
|
|
|
Nilai ASB |
12.810.249,76 |
| 2020 | 25.1.1.2.34 | Pemeliharaan Jalan Overlay Lebar 20 m | M1 | 12.810.249,76 | (belum diset) | |
460 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
25.1.2.1 |
Rigid Pavements Tipe A1 |
|
|
Titik |
|
|
24.1.2.3 |
- |
Penggalian Tanah Keras sedalam s.d. 1 m |
0.75 |
M3 |
157.417,60 |
118.063,20 |
24.1.2.11 |
- |
Penimbunan dengan Pasir urug |
0.0125 |
M3 |
471.628,02 |
5.895,35 |
24.1.2.14 |
- |
Penimbunan Sirtu dan Pemadatan menggunakan Alat Berat |
0.1 |
M3 |
605.591,02 |
60.559,10 |
24.1.4.1 |
- |
Beton untuk Lantai Kerja |
0.1 |
M3 |
568.825,93 |
56.882,59 |
24.1.4.43 |
- |
Beton mutu f'c 31,2 Mpa (K-350), slump (12±2) cm. w/c=0,48, dengan Molen |
0.35 |
M3 |
2.201.588,97 |
770.556,13 |
24.1.4.47 |
- |
Tulangan Beton dengan besi ulir |
2.19 |
kilogram |
23.886,93 |
52.312,38 |
24.1.4.54 |
- |
Bekisting untuk Lantai |
0.022 |
M2 |
748.608,00 |
16.469,38 |
24.1.6.6 |
- |
Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata |
1 |
M2 |
162.020,00 |
162.020,00 |
24.2.1.2 |
- |
Pemasangan Paving Blok Tbl.6 cm segi empat |
0.25 |
M2 |
116.890,00 |
29.222,50 |
24.2.1.6 |
- |
Kanstin BDCM 21.5 |
0.3333 |
M |
121.117,38 |
40.368,42 |
24.2.3.38 |
- |
Lapis Pondasi Aggregat Kelas A |
0.3 |
M3 |
908.635,51 |
272.590,67 |
24.2.3.39 |
- |
Lapis Pondasi Aggregat Kelas B |
0.4 |
M3 |
819.094,10 |
327.637,64 |
24.2.3.48 |
- |
Lapis Pondasi Aggregat Kelas C |
0.5 |
M3 |
737.720,79 |
368.860,39 |
24.2.3.83 |
- |
LasTon Lapis Aus (AC-WC) |
0.135 |
ton |
1.622.513,66 |
219.039,35 |
24.2.3.87 |
- |
LasTon Lapis Antara (AC-BC) |
0.09 |
ton |
1.502.092,25 |
135.188,31 |
24.2.3.97 |
- |
Lapis Pondasi/Perata Penetrasi Macadam |
0.05 |
M3 |
2.520.503,24 |
126.025,16 |
24.2.5.25 |
- |
Pembongkaran Beton |
0.35 |
M3 |
546.486,93 |
191.270,42 |
|
|
|
|
|
Nilai ASB |
2.952.961,00 |
| 2020 | 25.1.2.1.1 | Rigid Pavements Tipe A1 | M2 | 2.952.961,00 | (belum diset) | |