Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 45,041-45,060 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
| 45041 | 2019 | 23.2.2.3.3.37 | Biaya Rekening listrik 2 | dkp | 274.800.000.000,00 | 1 Tahun | Dipakai | |
| 45042 | 2019 | 23.2.2.3.3.38 | Pembayaran Tagihan Listrik Rumah Sakit Type C | = | 150.000.000,00 | Bulan | Dipakai | |
| 45043 | 2019 | 23.2.2.3.3.39 | Pembayaran Listrik | ... | 41.000.000,00 | Bulan | Dipakai | |
| 45044 | 2019 | 23.2.2.3.3.40 | Belanja Listrik | dkp | 1.000.000.000,00 | Tahun | Tidak Dipakai | |
| 45045 | 2019 | 23.2.2.3.3.41 | Biaya Rekening Listrik | ---- | 2.030.000.000,00 | Tahun | Dipakai | |
| 45046 | 2019 | 23.2.2.3.3.42 | Biaya Rekening Listrik | ,.., | 169.000.400,00 | Tahun | Tidak Dipakai | |
| 45047 | 2019 | 23.2.2.3.4.1 | Token Rp. 100000,- | | 104.700,00 | Rupiah | Dipakai | |
| 45048 | 2019 | 23.2.2.3.5.1 | Tambah Daya Listrik 1300 W menjadi 2200 W | | 1.029.800,00 | paket | Tidak Dipakai | |
| 45049 | 2019 | 23.2.2.3.6.1 | Biaya Rekening Listrik Di Mall | | 273.278,00 | titik / bulan | Tidak Dipakai | |
| 45050 | 2019 | 23.2.2.3.7.1 | Sewa Listrik Untuk Repeater Link | | 500.000,00 | Lokasi | Dipakai | |
| 45051 | 2019 | 23.2.2.3.8.1 | Biaya Listrik Voltase Unlimited | | 1.650,00 | Kwh | Dipakai | |
| 45052 | 2019 | 23.2.2.3.9.1 | Tambah Daya 3500 W Menjadi 6600 W | | 3.679.600,00 | paket | Tidak Dipakai | |
| 45053 | 2019 | 23.2.2.3.10.1 | Tambah Daya 3500 W Menjadi 10600 W | | 8.243.600,00 | paket | Tidak Dipakai | |
| 45054 | 2019 | 23.2.2.3.11.1 | Biaya Pasang Baru PDAM | | 1.600.000,00 | Lokasi | Dipakai | |
| 45055 | 2019 | 23.2.2.3.12.1 | Biaya Pasang Baru Listrik 2.200VA | | 2.000.000,00 | paket | Dipakai | |
| 45056 | 2019 | 23.2.2.3.12.2 | Pembuatan Token Listrik Rumah Susun | | 400.000.000,00 | Lokasi | Tidak Dipakai | |
| 45057 | 2019 | 23.2.2.3.12.3 | Token Listrik | | 10.000.000,00 | Kali | Dipakai | |
| 45058 | 2019 | 23.2.2.3.12.4 | Belanja BP-UJL | Dinas Kebersihan | 399.999.600,00 | per tahun | Dipakai | |
| 45059 | 2019 | 23.2.2.3.12.5 | Biaya Pemasangan Meteran Baru PLN | | 12.000.000,00 | titik | Tidak Dipakai | |
| 45060 | 2019 | 23.2.2.3.12.6 | Belanja Pemasangan Meteran Baru PLN | .. | 13.000.000,00 | Tahun | Dipakai | |