381 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.8 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.8.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade + Papan Tambahan | unit | 0,00 | (belum diset) | |
382 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.9 |
Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.9.1 | Daun Rambu Lalu Lintas ACP (60 cm) Engineering Grade | unit | 0,00 | (belum diset) | |
383 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.10 |
Klem Galvanis Rambu Include Mur Baut |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.10.1 | Klem Galvanis Rambu Include Mur Baut | unit | 0,00 | (belum diset) | |
384 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.11 |
Pemasangan Tiang dan rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.11.1 | Pemasangan Tiang dan rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
385 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.12 |
Pemasangan Rambu RPPJ 2 m x 3 m |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.12.1 | Pemasangan Rambu RPPJ 2 m x 3 m | unit | 0,00 | (belum diset) | |
386 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.13 |
Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.13.1 | Pemasangan RPPJ Oktagonal Kantilever 1,8 x 1,2 m dengan scotch light engineering grade perismatik | unit | 0,00 | (belum diset) | |
387 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.14 |
Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.14.1 | Pemasangan Rambu Lalu Lintas (90 cm) Engineering Grade serta Papan Tambahan dengan Tiang Overhead Oktagonal | unit | 0,00 | (belum diset) | |
388 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.15 |
Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.15.1 | Pemasangan Papan Nama Jalan (Standart) dari Plat Aluminium Lengkap | unit | 0,00 | (belum diset) | |
389 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.16 |
Pemasangan Papan Peringatan / Himbauan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.16.1 | Pemasangan Papan Peringatan / Himbauan | unit | 0,00 | (belum diset) | |
390 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.17 |
Pemasangan Papan Petunjuk |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.17.1 | Pemasangan Papan Petunjuk | unit | 0,00 | (belum diset) | |
391 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.18 |
Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.18.1 | Pemasangan penggantian pipa rambu lalu lintas (menggunakan flenders) | unit | 0,00 | (belum diset) | |
392 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.19 |
Pemasangan Rambu Elektronik Solar Cell |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.19.1 | Pemasangan Rambu Elektronik Solar Cell | unit | 0,00 | (belum diset) | |
393 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.20 |
Pemasangan Tiang Rambu Ganda |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.20.1 | Pemasangan Tiang Rambu Ganda | unit | 0,00 | (belum diset) | |
394 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.21 |
Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.21.1 | Pembuatan Palang Kuda dr Pipa Besi Hitam Dia. 2.5" | unit | 0,00 | (belum diset) | |
395 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.22 |
Pembuatan Palang Kuda - kuda untuk Car Free Day |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.22.1 | Pembuatan Palang Kuda - kuda untuk Car Free Day | unit | 0,00 | (belum diset) | |
396 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.23 |
Pemasangan Paku Jalan |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.23.1 | Pemasangan Paku Jalan | unit | 0,00 | (belum diset) | |
397 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.24 |
Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.24.1 | Pemasangan Paku Jalan Solar dengan LED Light dan Capasitor | unit | 0,00 | (belum diset) | |
398 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.25 |
Pengecatan Marka Thermoplastik tebal 2 mm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.25.1 | Pengecatan Marka Thermoplastik tebal 2 mm | M2 | 0,00 | (belum diset) | |
399 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.26 |
Pengecatan Marka Pita Penggaduh dengan Thermoplastik Tebal 10 mm |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.26.1 | Pengecatan Marka Pita Penggaduh dengan Thermoplastik Tebal 10 mm | M2 | 0,00 | (belum diset) | |
400 |
NOMOR |
KATEGORI PEKERJAAN |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
28.4.1.27 |
Pengecatan Marka Jalan Coldplastik |
|
|
Titik |
|
|
|
|
|
|
|
Nilai ASB |
0,00 |
| 2019 | 28.4.1.27.1 | Pengecatan Marka Jalan Coldplastik | M2 | 0,00 | (belum diset) | |