Standard Satuan Harga
Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan
Showing 37,581-37,600 of 69,568 items.
Standard Satuan Harga
* Resize table columns just like a spreadsheet by dragging the column edges.
| 37581 | 2019 | 20.2.1.2.26.2556 | Referkit power stering | Kijang Kapsul | 988.848,00 | buah | Tidak Dipakai | |
| 37582 | 2019 | 20.2.1.2.26.2557 | Karet tutup abu powder stering | Kijang Kapsul | 329.410,00 | buah | Tidak Dipakai | |
| 37583 | 2019 | 20.2.1.2.26.2558 | Silang empat power stering | Kijang Kapsul | 970.892,00 | buah | Tidak Dipakai | |
| 37584 | 2019 | 20.2.1.2.26.2559 | Klip karet stering | Kijang Kapsul | 50.774,00 | buah | Tidak Dipakai | |
| 37585 | 2019 | 20.2.1.2.26.2560 | Otomat cas | Kijang Kapsul | 160.370,00 | buah | Tidak Dipakai | |
| 37586 | 2019 | 20.2.1.2.26.2561 | Dynamo cas | Kijang Kapsul | 2.004.321,00 | buah | Tidak Dipakai | |
| 37587 | 2019 | 20.2.1.2.26.2562 | Lahar temming | Kijang Kapsul | 401.236,00 | buah | Tidak Dipakai | |
| 37588 | 2019 | 20.2.1.2.26.2563 | Baut as tarik | Kijang Kapsul | 50.774,00 | buah | Tidak Dipakai | |
| 37589 | 2019 | 20.2.1.2.26.2564 | Klip as tarik | Kijang Kapsul | 83.591,00 | buah | Tidak Dipakai | |
| 37590 | 2019 | 20.2.1.2.26.2565 | Referkit vacum rem | Kijang Kapsul | 705.259,00 | buah | Tidak Dipakai | |
| 37591 | 2019 | 20.2.1.2.26.2566 | Slang benzin | Kijang Kapsul | 146.748,00 | buah | Tidak Dipakai | |
| 37592 | 2019 | 20.2.1.2.26.2567 | Pesawat kaca pintu | Kijang Kapsul | 721.977,00 | buah | Tidak Dipakai | |
| 37593 | 2019 | 20.2.1.2.26.2568 | Arm Stiur | Toyota Kijang | 107.739,00 | set | Tidak Dipakai | |
| 37594 | 2019 | 20.2.1.2.26.2569 | Arm Boks Stiur | Toyota Kijang | 107.739,00 | buah | Tidak Dipakai | |
| 37595 | 2019 | 20.2.1.2.26.2570 | Alas lumpur | Toyota Kijang | 148.606,00 | buah | Tidak Dipakai | |
| 37596 | 2019 | 20.2.1.2.26.2571 | Vacum rem intercooler | | 3.346.108,00 | pc | Tidak Dipakai | |
| 37597 | 2019 | 20.2.1.2.26.2572 | Blok Rem | 1 | 899.065,00 | buah | Tidak Dipakai | |
| 37598 | 2019 | 20.2.1.2.26.2573 | Paking Knalpot | 41 | 86.687,00 | buah | Tidak Dipakai | |
| 37599 | 2019 | 20.2.1.2.26.2574 | Pipa Knalpot | | 4.652.000,00 | buah | Tidak Dipakai | |
| 37600 | 2019 | 20.2.1.2.26.2575 | Tabung Knalpot | | 1.398.500,00 | buah | Tidak Dipakai | |