341 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.9 |
Agregat Lapis Pondasi Bawah (LPB) Klas B |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.9 | Agregat Lapis Pondasi Bawah (LPB) Klas B | 500 Biji | 0,00 | Tidak Dipakai | |
342 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.10 |
Agregat Lapis Pondasi Bawah (LPB) Klas C |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.10 | Agregat Lapis Pondasi Bawah (LPB) Klas C | 500 Biji | 0,00 | Tidak Dipakai | |
343 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.11 |
Produksi Dan Penghamparan Laston Lapis Aus / AC - WC |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.11 | Produksi Dan Penghamparan Laston Lapis Aus / AC - WC | potong | 0,00 | Tidak Dipakai | |
344 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.12 |
Produksi Dan Penghamparan Laston Lapis Antara / AC - BC |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.12 | Produksi Dan Penghamparan Laston Lapis Antara / AC - BC | potong | 0,00 | Tidak Dipakai | |
345 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.13 |
Produksi Dan Penghamparan Laston Lapis Antara Leveling / AC - BC Leveling |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.13 | Produksi Dan Penghamparan Laston Lapis Antara Leveling / AC - BC Leveling | potong | 0,00 | Tidak Dipakai | |
346 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.14 |
Produksi Lapis tipis aspal beton AC (lataston) menggunakan alat |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.14 | Produksi Lapis tipis aspal beton AC (lataston) menggunakan alat | potong | 0,00 | Tidak Dipakai | |
347 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.15 |
Produksi Lapis Tipis Aspal Beton HRS (Lataston) Menggunakan Alat |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.15 | Produksi Lapis Tipis Aspal Beton HRS (Lataston) Menggunakan Alat | potong | 0,00 | Tidak Dipakai | |
348 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.16 |
Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas) Menggunakan Alat |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.16 | Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas) Menggunakan Alat | potong | 0,00 | Tidak Dipakai | |
349 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.17 |
Produksi Aspal Emulsi |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.17 | Produksi Aspal Emulsi | potong | 0,00 | Tidak Dipakai | |
350 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.18 |
Lapis Renolith Concrete Base Tebal 20 Cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.18 | Lapis Renolith Concrete Base Tebal 20 Cm | 10 Pcs | 0,00 | Tidak Dipakai | |
351 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.19 |
Lapisan Perkerasan 15 cm (padat digilas) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.19 | Lapisan Perkerasan 15 cm (padat digilas) | 10 Pcs | 0,00 | Tidak Dipakai | |
352 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.20 |
Lapisan Perkerasan 20 cm (Padat digilas) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.20 | Lapisan Perkerasan 20 cm (Padat digilas) | 10 Pcs | 0,00 | Tidak Dipakai | |
353 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.21 |
Lapisan Perkerasan 5-10 cm (Padat digilas) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.21 | Lapisan Perkerasan 5-10 cm (Padat digilas) | 10 Pcs | 0,00 | Tidak Dipakai | |
354 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.22 |
Penghamparan ATB tb. 6 cm |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.22 | Penghamparan ATB tb. 6 cm | potong | 0,00 | Tidak Dipakai | |
355 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.23 |
Penghamparan ATB tb. 4 cm |
|
potong |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.23 | Penghamparan ATB tb. 4 cm | potong | 0,00 | Tidak Dipakai | |
356 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.24 |
Penghamparan Lapis Perm. Aspal Beton Laston (AC) tb. 4 cm |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.24 | Penghamparan Lapis Perm. Aspal Beton Laston (AC) tb. 4 cm | 10 Pcs | 0,00 | Tidak Dipakai | |
357 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.25 |
Lapisan Stone Sheet tb. 2 cm (tanpa Finisher dan PTR) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.25 | Lapisan Stone Sheet tb. 2 cm (tanpa Finisher dan PTR) | 10 Pcs | 0,00 | Tidak Dipakai | |
358 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.26 |
Lap AC Levelling 3-4 cm, tanpa Finisher dan PTR (untuk perbaikan jalan) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.26 | Lap AC Levelling 3-4 cm, tanpa Finisher dan PTR (untuk perbaikan jalan) | 10 Pcs | 0,00 | Tidak Dipakai | |
359 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.27 |
Lap atbl 3-4 cm, tanpa finisher dan PTR (untuk perbaikan jalan) |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.27 | Lap atbl 3-4 cm, tanpa finisher dan PTR (untuk perbaikan jalan) | 10 Pcs | 0,00 | Tidak Dipakai | |
360 |
NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
24.8.2.28 |
Pas Curbing Type A panjang 0.6 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.8.2.28 | Pas Curbing Type A panjang 0.6 m | lembar | 0,00 | Tidak Dipakai | |