| 281 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.3.28 |
Drainase Porous |
|
500 Biji |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.3.28 | Drainase Porous | 500 Biji | 0,00 | Tidak Dipakai | |
| 282 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.3.29 |
Pemasangan Instalasi Air Bersih |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.3.29 | Pemasangan Instalasi Air Bersih | lembar | 0,00 | Tidak Dipakai | |
| 283 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.3.30 |
Pemasangan Instalasi Air Kotor |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.3.30 | Pemasangan Instalasi Air Kotor | lembar | 0,00 | Tidak Dipakai | |
| 284 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.3.31 |
Pemasangan Pipa Pe 12 mm |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.3.31 | Pemasangan Pipa Pe 12 mm | lembar | 0,00 | Tidak Dipakai | |
| 285 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.1 |
Pemasangan Pagar Besi Model BRC |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.1 | Pemasangan Pagar Besi Model BRC | 10 Pcs | 0,00 | Tidak Dipakai | |
| 286 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.2 |
Pemasangan Pintu Swing Ganda / dorong Type BRC/PMG ukuran. (1,2 x 3) meter |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.2 | Pemasangan Pintu Swing Ganda / dorong Type BRC/PMG ukuran. (1,2 x 3) meter | 10 Pcs | 0,00 | Tidak Dipakai | |
| 287 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.3 |
Pemasangan Pintu Pagar Besi |
|
10 Pcs |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.3 | Pemasangan Pintu Pagar Besi | 10 Pcs | 0,00 | Tidak Dipakai | |
| 288 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.4 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1.5 m x 2.4 m |
|
10 Lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.4 | Pekerjaan Pembuatan Pagar Besi Model PMG 1.5 m x 2.4 m | 10 Lembar | 0,00 | Tidak Dipakai | |
| 289 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.5 |
Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2.4 m |
|
10 Lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.5 | Pekerjaan Pembuatan Pagar Besi Model PMG 1,2 m x 2.4 m | 10 Lembar | 0,00 | Tidak Dipakai | |
| 290 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.6 |
Pekerjaan Pembuatan Pagar Besi 1.2 m x 2.25 m |
|
10 Lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.6 | Pekerjaan Pembuatan Pagar Besi 1.2 m x 2.25 m | 10 Lembar | 0,00 | Tidak Dipakai | |
| 291 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.4.7 |
Pekerjaan Pembuatan Pagar Besi 1.5 m x 2.25 m |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.4.7 | Pekerjaan Pembuatan Pagar Besi 1.5 m x 2.25 m | lembar | 0,00 | Tidak Dipakai | |
| 292 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.1 |
Pemasangan Pipa Galvanis Termasuk Elektrode |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.1 | Pemasangan Pipa Galvanis Termasuk Elektrode | lembar | 0,00 | Tidak Dipakai | |
| 293 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.2 |
Pekerjaan Besi Pipa Galvanis 1/2 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.2 | Pekerjaan Besi Pipa Galvanis 1/2 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 294 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.3 |
Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.3 | Pekerjaan Besi Pipa Galvanis 3/4 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 295 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.4 |
Pekerjaan Besi Pipa Galvanis 1 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.4 | Pekerjaan Besi Pipa Galvanis 1 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 296 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.5 |
Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.5 | Pekerjaan Besi Pipa Galvanis 1 1/4 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 297 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.6 |
Pekerjaan Besi Pipa Galvanis 2 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.6 | Pekerjaan Besi Pipa Galvanis 2 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 298 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.7 |
Pekerjaan Besi Pipa Galvanis 2 1/2 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.7 | Pekerjaan Besi Pipa Galvanis 2 1/2 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 299 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.8 |
Pekerjaan Besi Pipa Galvanis 3 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.8 | Pekerjaan Besi Pipa Galvanis 3 " (Medium) | lembar | 0,00 | Tidak Dipakai | |
| 300 |
| NOMOR |
URAIAN KEGIATAN |
KOEF. |
SAT |
HARGA SATUAN |
HARGA |
| 24.7.5.9 |
Pekerjaan Besi Pipa Galvanis 4 " (Medium) |
|
lembar |
|
|
|
Upah: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Bahan/Material: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
Sewa Peralatan: |
|
|
|
|
|
|
|
|
Jumlah |
0,00 |
|
|
|
|
Nilai HSPK |
0,00 |
| 2018 | 24.7.5.9 | Pekerjaan Besi Pipa Galvanis 4 " (Medium) | lembar | 0,00 | Tidak Dipakai | |