Standard Satuan Harga

Daftar Data Standart Harga Perencanaan Pemerintah Kota Medan

Showing 20,901-20,920 of 69,568 items.

Standard Satuan Harga

* Resize table columns just like a spreadsheet by dragging the column edges.
#TahunKode SSHNama BarangSpesifikasiHarga SatuanSatuanStatusAksi
  
20901201823.2.5.11.6.7Sewa Motor Grader 125 - 140 pk Min 5 jam292.700,00jam Tidak Dipakai
20902201823.2.5.11.6.8Asphalt Mixing Plant4.214.500,00jam Tidak Dipakai
20903201823.2.5.11.6.9Sewa Compresor Min. 5 Jam99.500,00jam Tidak Dipakai
20904201823.2.5.11.6.10Sewa Coal Miling Machine2.604.700,00jam Tidak Dipakai
20905201823.2.5.11.6.11Sewa Mesin Penghampar20.900,00jam Tidak Dipakai
20906201823.2.5.11.6.12Sewa Stemper109.400,00jam Tidak Dipakai
20907201823.2.5.11.7.1Sewa Wheel Loader 1.7 - 2 m3 (min 5 jam)608.800,00jam Tidak Dipakai
20908201823.2.5.11.8.1Sewa Vibrator Roller Min 5 jam143.700,00jam Tidak Dipakai
20909201823.2.5.11.9.1Sewa Concrete Mixer 0.50 m3 (Min 3 jam)69.200,00jam Tidak Dipakai
20910201823.2.5.11.9.2Sewa Concrete Pump Min 3 Jam69.200,00jam Tidak Dipakai
20911201823.2.5.11.9.3Sewa Concrete Vibrator16.000,00jam Tidak Dipakai
20912201823.2.5.11.10.1Sewa Hammer Tiang Pancang min. 8 jam (Termasuk Mob/Demob Operator BBM)196.900,00jam Tidak Dipakai
20913201823.2.5.12.1.1Sewa Alat Bantu Pembuatan Aspal Emulsi21.300,00LS Tidak Dipakai
20914201823.2.5.12.1.2Sewa Alat Bantu Pembuatan Laston Renolith13.400,00jam Tidak Dipakai
20915201823.2.5.12.1.3Sewa Alat Bantu Roll Pipa2.700,00jam Tidak Dipakai
20916201823.2.5.12.1.4Sewa Alat Bantu Penerangan Jalan Umum (PJU)7.300,00jam Tidak Dipakai
20917201823.2.5.12.1.5Sewa Alat Bantu Strouss Pile10.600,00jam Tidak Dipakai
20918201823.2.5.12.1.6Sewa Alat Bantu 1set @ 3 alat1.100,00M3 Tidak Dipakai
20919201823.2.5.12.1.7Sewa Sheet Pile WF1.100,00M2 Tidak Dipakai
20920201823.2.5.12.1.8Sewa Sheet Profile C1.100,00M2 Tidak Dipakai